HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates


Reply

 
Thread Tools Display Modes
     
     
  #21  
Old Posted Dec 20, 2025, 1:29 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,910
They have made some progress building the 6th floor concrete block walls but the weather hasn't been much help.
Reply With Quote
     
     
  #22  
Old Posted Jan 3, 2026, 2:06 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,910
Should have the 6th floor concrete block walls built in the next 2 weeks on this project.

https://www.ctvnews.ca/london/article/a-...housing-project-eyes-early-2027-opening/
Reply With Quote
     
     
  #23  
Old Posted Jan 20, 2026, 7:09 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,910
Wrapping up the 6th floor concrete block wall builds. Should see the precast concrete roof slabs being installed soon.
Reply With Quote
     
     
  #24  
Old Posted Feb 8, 2026, 8:59 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,910
Precast concrete roof slabs now installed on this 6s building. Up next the mechanical penthouse walls. Window units are now installed up to the 3rd floor level.
Reply With Quote
     
     
  #25  
Old Posted Feb 19, 2026, 4:49 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,910
This is nearly topped out with the mechanical penthouse and elevator/stairwell concrete block walls nearly built. Have started installing the window units upto the 4th floor now.
Reply With Quote
     
     
  #26  
Old Posted Mar 12, 2026, 8:59 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,910
This 6s building is topped out now. Exterior and interior finishing already under way.
Reply With Quote
     
     
  #27  
Old Posted Jun 6, 2026, 10:10 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,910
Exterior brick now being installed on the south side.
Reply With Quote
     
     
  #28  
Old Posted Jun 7, 2026, 4:01 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,910
Reply With Quote
     
     
  #29  
Old Posted Jun 9, 2026, 12:03 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,910
CTV coverage of tour of this building.


https://www.ctvnews.ca/london/article/look-inside-the-73-unit-affordable-housing-project/


Of note St Vincent is looking for property to build a 2nd building in the city.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 12:22 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.