Have now got some of the 2nd floor modular steel wall panels installed on the west end of the middle 6s building.
Reply With Quote
     
     
  #42  
Old Posted Jan 10, 2026, 8:42 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,885
Wrapping up the 2nd floor steel modular wall panel installs. Should see the 3rd floor precast concrete floor slabs start being installed soon.
Reply With Quote
     
     
  #43  
Old Posted Jan 24, 2026, 6:49 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,885
The 3rd floor precast concrete floor slabs are now installed and they have started forming and pouring the 3rd floor walls for the elevator stairwell shaft.
Reply With Quote
     
     
  #44  
Old Posted Feb 19, 2026, 9:14 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,885
The 3rd floor steel modular wall panels are now installed
Reply With Quote
     
     
  #45  
Old Posted Feb 27, 2026, 8:51 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,885
They have now installed the 4th floor precast concrete floor slabs and have started forming the 4th floor walls and posts.
Reply With Quote
     
     
  #46  
Old Posted Mar 16, 2026, 6:32 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,885
Have started installing the 4th floor modular steel wall modules on the west end and have installed the structural steel posts for the 4th to 6th floor on the corners.
Reply With Quote
     
     
  #47  
Old Posted Mar 25, 2026, 7:42 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,885
Have about half the 5th floor precast concrete floor slabs installed now.
Reply With Quote
     
     
  #48  
Old Posted Apr 15, 2026, 7:55 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,885
Have now installed the 5th floor steel modular wall panels. Should see the 6th floor precast concrete floor slabs being installed next week. This 6s building should be topped out by the end of May.

Last edited by jammer139; Apr 16, 2026 at 1:22 PM.
Reply With Quote
     
     
  #49  
Old Posted May 16, 2026, 6:05 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,885
Have now installed the 6th floor precast concrete floor slabs and have poured some of the 6th floor walls and posts. Should see some of the 6th floor steel modular wall panels being installed next week.
Reply With Quote
     
     
  #50  
Old Posted May 27, 2026, 12:31 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,885
Almost done installing the 6th floor steel modular wall panels. Have started installing the precast concrete roof slabs on the west end as this building gets close to being topped out. Should see mechanical penthouse work starting next week.
Reply With Quote
     
     
  #51  
Old Posted May 31, 2026, 12:20 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,885
Have finished installing the precast concrete roof slabs on this 6s building. Mechanical penthouse walls up next and this 2nd building will be topped out.
Reply With Quote
     
     
  #52  
Old Posted Jun 8, 2026, 11:12 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,885
Have topped out this 6s building. Exterior and interior finishing thru the rest of the year and tenants in 2027.


Wonder when the next block of townhouses to the east of this will be demolished for building 3.


https://www.ctvnews.ca/london/article/re...stone-as-new-public-housing-takes-shape/
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 2:50 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.