The 3rd floor precast concrete floor slabs are now installed and they have started forming and pouring the 3rd floor walls for the elevator stairwell shaft.
Have started installing the 4th floor modular steel wall modules on the west end and have installed the structural steel posts for the 4th to 6th floor on the corners.
Have now installed the 5th floor steel modular wall panels. Should see the 6th floor precast concrete floor slabs being installed next week. This 6s building should be topped out by the end of May.
Last edited by jammer139; Apr 16, 2026 at 1:22 PM.
Have now installed the 6th floor precast concrete floor slabs and have poured some of the 6th floor walls and posts. Should see some of the 6th floor steel modular wall panels being installed next week.
Almost done installing the 6th floor steel modular wall panels. Have started installing the precast concrete roof slabs on the west end as this building gets close to being topped out. Should see mechanical penthouse work starting next week.
Have finished installing the precast concrete roof slabs on this 6s building. Mechanical penthouse walls up next and this 2nd building will be topped out.