Posted Jun 27, 2026, 5:27 PM
|
|
Registered User
|
|
Join Date: Jun 2016
Location: London
Posts: 8,979
|
|
The 6th floor walls are now installed on the second building. Soon to be topped out with roof slab and mechanical penthouse like the first building. Exterior finishing is under way with exterior brick on some of the townhouse blocks being installed.
|