  #401  
Old Posted May 23, 2026, 11:54 AM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,915
The exterior construction elevator is still in use on the north side of the 29s tower. Must be getting close to removing it so the remaining balcony doors can be installed and seal up the exterior.
Reply With Quote
     
     
  #402  
Old Posted May 30, 2026, 12:15 AM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,915
They have now removed the external construction elevator from the north side of the 29s tower and the loading platform. Cleaning up the sidewalk areas around the north tower lobby.
Reply With Quote
     
     
  #403  
Old Posted Jun 18, 2026, 9:50 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,915
Steel framing now being installed for the fawx roof over the Dufferin St law office house facade. Would expect they go with a steel shingle roof covering to mimic the old house shingle look. Still have unfinished sidewalk sections along Talbot St and along Dufferin St where the parking garage entrance is.
Reply With Quote
     
     
  #404  
Old Posted Jun 19, 2026, 10:34 AM
Djeffery's Avatar
Djeffery Djeffery is online now
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,204
This has been under construction most of my time on this board lol
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 1:45 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.