Quote:
Originally Posted by Crawford
Vornado is the silent partner in the Halmar plan. So this will likely be built according to Vornado's plans for the Penn District, which is fine by me.
It will be great to have these new towers integrated with the station, as with Grand Central.
|
Well this plan - which is a cheaper version of the previous plan - is always what was going to get built. Moving MSG was something that was NEVER going to happen, and I grew tired of repeating it (just as those who didn't want to hear that reality grew tired of hearing it).
But now that we have those issues out of the way, we can return this thread to serious conversation.
Some points:
- Removing that blank wall wall on 8th will be an improvement in any scenario, but if the cost of purchasing the theater is what I think it is, that money would better be spent on the grander design for the east end (where the heaviest concentration of passengers actually enter and depart Penn Station). No reason to half-ass
both ends. But I'm sure it will make Dolan very happy.
- Speaking of Dolan, as I've always said in the past, MSG won't be moving, but there is no reason why the exterior of MSG can't be incorporated into whatever they have planned around the perimeter. It doesn't have to look like lipstick on a pig. Apparently they are planning to do something like that, but I feel it won't go as far as it should, or
can. Dolan, who built the Sphere in Vegas, shouldn't cheap out on the World's Most Famous Arena.
- As far as Penn South goes, that was always a separate project from the rebuild of the current station itself. It's basically "on hold" under the current administration. But that has an expiration date, and Gateway moves forward. That increased capacity will need to go somewhere. And for the Love of God, stop it with the thru-running nonsense. The people of NJ and Long Island are automobile driven. That means, they will take a train into the city. But they will not pile on in mass numbers for a thru running train from Jersey to LI, or vice versa. That's just how it is. And in either case, the states themselves would have MUCH work to get those systems into alignment. There's neither the money, nor the desire to do so. On the other hand,
some thru running is an option for the Penn South expansion, if and when they get to it.