  #421  
Old Posted Apr 28, 2026, 9:48 AM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
So when is guideway construction due to be finished? End of 2027, easier? I hope we could hit a December 2028 opening/Q1 2029.
Reply With Quote
     
     
  #422  
Old Posted Apr 28, 2026, 11:00 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,188
^Summer 2027 for the guideway, maybe about 16 months left. Opening still planned for Q4 2029.
Reply With Quote
     
     
  #423  
Old Posted Apr 30, 2026, 4:32 AM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,724
New video

Video Link
Reply With Quote
     
     
  #424  
Old Posted May 1, 2026, 2:55 AM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,724
Another update from Stainer

Video Link
Reply With Quote
     
     
  #425  
Old Posted May 8, 2026, 5:27 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,188
Video Link
.
Reply With Quote
     
     
  #426  
Old Posted May 8, 2026, 10:55 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,724
Recent video of the guideway construction (no date on the video)

Video Link
Reply With Quote
     
     
  #427  
Old Posted May 9, 2026, 8:35 AM
Vantage's Avatar
Vantage Vantage is offline
Registered User
 
Join Date: Jan 2014
Location: Port Coquitlam, BC
Posts: 512
I don't remember if this has been discussed yet, but on Facebook they confirmed that steel beams will be installed in two other places on the line.

Quote:
Originally Posted by Surrey Langley Skytrain on Facebook
Steel beams will be installed at 2 additional locations: over the Serpentine River west of Highway 15, and for the guideway connection to the existing Expo Line near Fraser Highway and 138 Street.
I guess it's because of the angle of the road at 138 that would require a long span.
__________________
Vancouver born and raised | My Flickr
Reply With Quote
     
     
  #428  
Old Posted May 9, 2026, 4:26 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,724
Yeah I guess where Fraser Highway turns at 138th there will be one last centre alignment pier then a steel beam?

And the second location is west of the Serpentine River (maybe because of the weight issues previously discussed)

Quote:
Hi Bob - great question! Steel beams will be installed at 2 additional locations: over the Serpentine River west of Highway 15, and for the guideway connection to the existing Expo Line near Fraser Highway and 138 Street.
https://www.facebook.com/reel/945551638103148

There were some other questions in the comments so maybe check in a day for more replies.

I noticed in one of the environmental studies it mentioned 5 steel girder sections from 2023 assuming the Highway 15 is counted as 2..

Last edited by jollyburger; May 9, 2026 at 6:27 PM.
Reply With Quote
     
     
  #429  
Old Posted May 16, 2026, 5:39 AM
adrianroam95 adrianroam95 is offline
Registered User
 
Join Date: Aug 2010
Location: Coquitlam, BC
Posts: 214
5km of elevated guideway

If my math is correct the four gantry launchers have completed just over 5km of guideway in total (or around 1/3 of the guideway length). Much of the progress in the last several weeks is in Green Timbers where the Surrey Sprinter has sprinted from 148 St (in late March) to just shy of 144 St today (or about a span every 2 days).
Reply With Quote
     
     
  #430  
Old Posted May 16, 2026, 6:09 AM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,724
Quote:
Originally Posted by adrianroam95 View Post
If my math is correct the four gantry launchers have completed just over 5km of guideway in total (or around 1/3 of the guideway length). Much of the progress in the last several weeks is in Green Timbers where the Surrey Sprinter has sprinted from 148 St (in late March) to just shy of 144 St today (or about a span every 2 days).
FWIW They were at 4km of the 16km back on April 23rd

https://x.com/SLSkyTrain/status/2047380923524489476
Reply With Quote
     
     
  #431  
Old Posted May 16, 2026, 2:21 PM
Lexus's Avatar
Lexus Lexus is online now
Registered User
 
Join Date: Jul 2018
Location: Vancouver | BC | Canada
Posts: 2,835
Quote:
Originally Posted by adrianroam95 View Post
If my math is correct the four gantry launchers have completed just over 5km of guideway in total (or around 1/3 of the guideway length). Much of the progress in the last several weeks is in Green Timbers where the Surrey Sprinter has sprinted from 148 St (in late March) to just shy of 144 St today (or about a span every 2 days).
I should do an update pretty soon. It wasn't that long ago when I did one and gantry was just entering Green timbers at 148th street. That section might be the fastest one to progress.
Reply With Quote
     
     
  #432  
Old Posted May 16, 2026, 3:59 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,724
May 12 guideway update

Video Link
Reply With Quote
     
     
  #433  
Old Posted May 18, 2026, 3:14 AM
Lexus's Avatar
Lexus Lexus is online now
Registered User
 
Join Date: Jul 2018
Location: Vancouver | BC | Canada
Posts: 2,835
Video Link


There are 51 spans left to go for Fleetwood Flyer to reach 152 Street station.

DJI_0461 by Lexus LX 700, on Flickr

DJI_0462 by Lexus LX 700, on Flickr

DJI_0463 by Lexus LX 700, on Flickr

DJI_0464 by Lexus LX 700, on Flickr

DJI_0467 by Lexus LX 700, on Flickr

DJI_0468 by Lexus LX 700, on Flickr
Reply With Quote
     
     
  #434  
Old Posted May 18, 2026, 3:27 AM
Lexus's Avatar
Lexus Lexus is online now
Registered User
 
Join Date: Jul 2018
Location: Vancouver | BC | Canada
Posts: 2,835
There are 51 spans left for the Fleetwood Flyer to reach 152 Street Station.
And only 26 spans left for the Surrey Sprinter to reach Green Timbers Station!
It looks like the Surrey Sprinter will be the first to finish—as expected, since it has the fewest sections (900)—and by a significant margin!
Reply With Quote
     
     
  #435  
Old Posted May 18, 2026, 4:12 AM
surrey surrey is online now
Registered User
 
Join Date: Jan 2025
Posts: 49
Quote:
Originally Posted by Lexus View Post
There are 51 spans left for the Fleetwood Flyer to reach 152 Street Station.
And only 26 spans left for the Surrey Sprinter to reach Green Timbers Station!
It looks like the Surrey Sprinter will be the first to finish—as expected, since it has the fewest sections (900)—and by a significant margin!
doesnt surrey sprinter have to connect with king george station?
Reply With Quote
     
     
  #436  
Old Posted May 18, 2026, 4:32 AM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,724
Quote:
Originally Posted by surrey View Post
doesnt surrey sprinter have to connect with king george station?
Yes it will go all the way. I think it might be steel beam sections for at least the first connection from the existing guideway over Fraser Highway.
Reply With Quote
     
     
  #437  
Old Posted May 18, 2026, 5:02 AM
surrey surrey is online now
Registered User
 
Join Date: Jan 2025
Posts: 49

i think the fleetwood flyer will be the first to finish.
Reply With Quote
     
     
  #438  
Old Posted May 18, 2026, 2:11 PM
Lexus's Avatar
Lexus Lexus is online now
Registered User
 
Join Date: Jul 2018
Location: Vancouver | BC | Canada
Posts: 2,835
I estimate there will be 10-12 spans between Green Timbers station and King George Station. That still puts Surrey sprinter to finish first. Someone said before that Surrey sprinter completed one span in 2 days. This should be getting to green timbers station sometime in July. Although I’m not sure how long it will take to complete those 8 extra wide crossheads.
Reply With Quote
     
     
  #439  
Old Posted May 19, 2026, 7:21 PM
Lexus's Avatar
Lexus Lexus is online now
Registered User
 
Join Date: Jul 2018
Location: Vancouver | BC | Canada
Posts: 2,835
2026, May 18 | Drove flyover | From Bakerview 166 St Station to Langley City Centre

Video Link


DJI_0479 by Lexus LX 700, on Flickr

DJI_0470 by Lexus LX 700, on Flickr

Additional columns to make a spin off to OMC 5

DJI_0475 by Lexus LX 700, on Flickr
Reply With Quote
     
     
  #440  
Old Posted May 19, 2026, 8:34 PM
Diegotheartist1's Avatar
Diegotheartist1 Diegotheartist1 is offline
Registered User
 
Join Date: Apr 2021
Location: Vancouver
Posts: 163
Damn, those drone shots are lovely!
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 1:08 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.