Old Posted Mar 29, 2026, 5:51 PM
s211 s211 is offline
Registered User
 
Join Date: Oct 2008
Location: The People's Glorious Republic of ... Sigh...
Posts: 8,519
Quote:
Originally Posted by jollyburger View Post
Probably LEDs claiming a huge lifespan as long as you don't turn them on and off.
Reply With Quote
     
     
  #6482  
Old Posted Mar 29, 2026, 6:40 PM
Dave2 Dave2 is offline
Registered User
 
Join Date: Dec 2007
Posts: 547
Quote:
Originally Posted by jollyburger View Post
And 20 years before that too, when the deck was replaced.

“The bridge’s counterflow system was first implemented in 1994…”

1994? I don’t think so. More like 1964.

And before the lane control lights there was a counterflow system dating back to 1952, using flippable signs during rush hour (Something like “Use Right Lane Only”), with the centre lane used as a passing lane outside of rush hours.
Reply With Quote
     
     
  #6483  
Old Posted Mar 29, 2026, 7:28 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,736
Quote:
Originally Posted by whatnext View Post
Sad that a previous NDP government blew the chance to build a four lane bridge:
You really dig hard to find some random negative takes.
Reply With Quote
     
     
  #6484  
Old Posted Mar 29, 2026, 7:44 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,825
Quote:
Originally Posted by Dave2 View Post
And 20 years before that too, when the deck was replaced.

“The bridge’s counterflow system was first implemented in 1994…”

1994? I don’t think so. More like 1964.

And before the lane control lights there was a counterflow system dating back to 1952, using flippable signs during rush hour (Something like “Use Right Lane Only”), with the centre lane used as a passing lane outside of rush hours.
Some government press release said that.. probably a typo from 1964

https://news.gov.bc.ca/releases/2021TRAN0072-001001

This photo in 1964 shows the overhead lights.



https://www.facebook.com/photo/?fbid=1533902527001114&set=gm.1813048032189584
Reply With Quote
     
     
  #6485  
Old Posted Mar 29, 2026, 9:46 PM
Dave2 Dave2 is offline
Registered User
 
Join Date: Dec 2007
Posts: 547
Quote:
Originally Posted by jollyburger View Post
Some government press release said that.. probably a typo from 1964

https://news.gov.bc.ca/releases/2021TRAN0072-001001

This photo in 1964 shows the overhead lights.



https://www.facebook.com/photo/?fbid=1533902527001114&set=gm.1813048032189584
Cool photo, thanks for that. Confirms my memory that version 1 had the ability to display a green arrow over the far left lane, although probably never used.

Version 2 only had a green arrow.

Version 3? Impossible to tell as there’s only one signal head per lane.


I’ve seen a Len Norris cartoon lampooning the new lane control signals. The punchline was something about ancient Indian arrowheads.
Reply With Quote
     
     
  #6486  
Old Posted Mar 29, 2026, 10:47 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,825
PBX Engineering has a document on how they did the upgraded system in 2021

They also mention the 1994 date so I assume that date has something to do with whatever system was installed in 1994.

https://www.canadianconsultingengineer.c...30412_RLH-PBX-LGB-Showcase-CCE-Final.pdf

I noticed one of the light sets in the causeway was still off today so maybe that one caused a larger failure.
Reply With Quote
     
     
  #6487  
Old Posted Apr 2, 2026, 7:28 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,814
Clanker balls - easy solution to the overheight problem.

https://youtu.be/4EvTVWT9ZS4?si=X5xhciRlJuOJGacM
Reply With Quote
     
     
  #6488  
Old Posted Apr 12, 2026, 3:19 PM
Lexus's Avatar
Lexus Lexus is offline
Registered User
 
Join Date: Jul 2018
Location: Vancouver | BC | Canada
Posts: 2,865
2026, Apr 11

Burnaby, Holdom Ave overpass
A lot more girders added.

Looking south west

Untitled by Lexus LX 700, on Flickr

Looking north west

Untitled by Lexus LX 700, on Flickr
Reply With Quote
     
     
  #6489  
Old Posted Apr 12, 2026, 9:40 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,825
They're fixing the problems with the road/deck on Waterfront Road until July

https://plposweb.vancouver.ca/Public/Default.aspx?PossePresentation=Guest&PosseObjectId=293880780
Reply With Quote
     
     
  #6490  
Old Posted Apr 17, 2026, 11:17 PM
Lexus's Avatar
Lexus Lexus is offline
Registered User
 
Join Date: Jul 2018
Location: Vancouver | BC | Canada
Posts: 2,865
2026, Apr 17

Holdom Ave overpass

Untitled by Lexus LX 700, on Flickr

Untitled by Lexus LX 700, on Flickr

Untitled by Lexus LX 700, on Flickr
Reply With Quote
     
     
  #6491  
Old Posted Apr 17, 2026, 11:34 PM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 18,032
Thanks for the update! While the Harris Road underpass in Pitt Meadows seems to have died, I'm glad to see this one is taking shape.
Reply With Quote
     
     
  #6492  
Old Posted Apr 19, 2026, 3:00 AM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,825
Quote:
'End of an era': Vancouver to cease coin payment for parking

Prior to COVID, he said there were 12 people working as coin collectors, which was then “decimated” during the pandemic. After COVID, the City brought back seven coin collectors. As people retired, more of these roles were further lost to attrition.

“They only kept five. So, basically, they weren’t collecting every meter every day because the money was down, but they should have been for security reasons.”

The City said that ceasing coin-paid parking will result in “involuntary departures,” as well as other staff redeployed to work in other areas.

But they said the reason for this change is that people paying for street parking with coins has “steadily declined” over time. Just four per cent of parking revenue is paid for by coin.

The majority of people pay through apps, which include PayByPhone and HotSpot.
https://dailyhive.com/vancouver/vancouver-paid-parking-coins

The new parking app

https://hotspotparking.com/

It's from Arcadis

https://www.arcadis.com/en-ca/news/north...couver-launches-arcadis-hotspot-solution
Reply With Quote
     
     
  #6493  
Old Posted May 4, 2026, 5:11 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,814
Reply With Quote
     
     
  #6494  
Old Posted May 4, 2026, 1:57 PM
Klazu's Avatar
Klazu Klazu is offline
Registered User
 
Join Date: Apr 2012
Location: Above Metro Vancouver clouds
Posts: 10,408
What's that project on 99 about? Never heard of one.
Reply With Quote
     
     
  #6495  
Old Posted May 4, 2026, 2:51 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,219
Quote:
Originally Posted by Klazu View Post
What's that project on 99 about? Never heard of one.
78th Street Interchange, it's just south of Hwy 17. Built and funded by Beddie to support a new industrial park they are building along 88th Street north of the 99.

https://78th.beedie.ca/
https://www.delta.ca/community-culture/h...in-78-street-interchange-project-support
Reply With Quote
     
     
  #6496  
Old Posted May 4, 2026, 5:12 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,825
Parkwood Industrial Estates

135 acres

https://parkwoodindustrial.ca/

Interchange project website. Spring 2027 completion:

https://78th.beedie.ca/
Reply With Quote
     
     
  #6497  
Old Posted May 4, 2026, 9:26 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,814
Interesting post about 2nd Narrows Bridge snd the older bridge there:

https://www.instagram.com/reel/DX7O_XLK13G/?igsh=eTNvMHo3OWMyb2U3
Reply With Quote
     
     
  #6498  
Old Posted May 6, 2026, 11:43 PM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,129
they have been working on and it looks nearly complete as traffic lights etc are now installed for a new intersection at Delta/Douglas and Lougheed right by the new tower. It's fairly close to the other intersection to the west, could cause some congestion.
Reply With Quote
     
     
  #6499  
Old Posted May 14, 2026, 3:04 AM
Feathered Friend Feathered Friend is offline
Registered User
 
Join Date: Jun 2016
Posts: 2,556
Cambie Street Bridge upgrades




https://council.vancouver.ca/20260520/documents/cfsc2.pdf

Quote:
if approved next week, major changes will be coming to Vancouver’s Cambie Street Bridge that include widening the W 2nd Ave off-ramp, a bi-directional bike lane on the east side, replacement of the pedestrian staircase, & the demolition of the City Studios building underneath
https://x.com/City_Duo/status/2054732523205435781?s=20
Reply With Quote
     
     
  #6500  
Old Posted May 14, 2026, 2:50 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,808
Quote:
Originally Posted by Feathered Friend View Post
Cambie Street Bridge upgrades
Oh my gawd. I remember watching out the back window of the Brill trolleys as the poles sparked going over the junctions on the swing span of the old Connaught bridge. And then tearing it down and building the new one. In my mind it's still the "new" bridge.



Has it really been 40 years already? Oh my gawd.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:39 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.