Priorities for UA Campus Construction and Renovations:
https://buildingbama.ua.edu/wp-content/uploads/2024/06/ACDP2024.pdf
I wanted to see if the UA Athletic Arena was still on the planning board, and it does not look good based on this document. Why don't they just fully renovate Coleman's interior at this point? I recall they originally planned for that, and it would have brought seats closer to the floor and kept max capacity closer to the current 15,000 plus. I think it was around 12,000, vs the 10,000 the more recent planned arena would have had.
Anyway, if you want to see which planned buildings have highest priority and which do not, check out the above document. Projects labeled 1 are highest priority, and 4 lowest priority. LP means it is dependent on legislative policies and grant success.