Quote:
Originally Posted by Nova08
I hear you but you know better than most about Septa's blunders in the 80s to let go of the exReading lines out that way. Once it went to trails and ensuing development adjacent to the ROW north of Quakertown there is nearly 0 chance to ever reactivate it. And sorry, but the current NS circuitous route makes no sense to anything beyond Reading
|
SEPTA abandoned everything outside of the 5 county area in 1981 because the State slashed funding for said service. Bethlehem and Newtown saw good enough ridership that I'm confident they'd still be around today had it not been for that.
You can blame SEPTA for the rails-to-trails of the Ivy Ridge Line, the Newtown Line, and the Bethlehem Branch, and there is some blame indeed deserved, but you must realize that said projects had immense political backing behind them that SEPTA could not afford to stand up against in the face of poor funding.
Nothing is impossible. SEPTA still owns the right of way for Bethlehem as far as High Street in Hellertown, and maintains trackage rights over Norfolk Southern in perpetuity.
Wassaic on the Metro-North Harlem Line was rails-to-trailsed, yet restored to service in harmony with the trail in the early 2000s. The right-of-way of the Bethlehem Branch is more than wide enough to support a 2 track railroad
and bike trail.