Quote:
Originally Posted by YOWetal
Sure but there is a reason they are building it. The last mile matters. Are we building HSR or not? If so we need to tunnel or build viaducts through the city anyway. From the east entry of Ottawa to exiting the city it's about 45 minutes on Via right now add the stop in Ottawa and the Ottawa Montrealt time via Laval and you are nearing two hours by the time you get to speed west of Carleton place. They have set a faster timeline which means either way there will be expensive work done in Ottawa to make that faster than current which isn't just a new trainset.
Your other points are good. The standard is not HSR right downtown for sure. In Japan it's often skirts the smaller cities because it's above ground.
It probably won't work but it would be great if they could save a few billion by putting the station at the airport we could get funded to add a rapid line from there to downtown. I know LRT says we have fixed what we have but that's not really accurate as this is 20+ years away so nothing wrong with building a new route south say along the transit with a direct airport connection overpass from there.
|
If the last mile is so important to the High Speed Rail industry, why has literally no country that operates high speed rail followed the proposed policy of tunnelling many km under the city to build an elaborate underground station in the traditional city centre?
In most cities the railway station used by high speed trains is outside of the traditional city centre. In London, for example, St Pancras is a 30-60 minute walk from Westminster or the City. The vast majority of the people arriving on HSR trains would expect to enter another vehicle on their arrival (another train, tube, taxi, etc). Gare de Nord or the other Paris HSR Termini are a similar distance from central Paris. The same is true in Vienna, Moscow, Rome (although it is debatable where the "downtown" is), New York, Washington (although you could have a similar debate about where the "downtown is.") In China, the favourite place of HSR stans, Beijing South is a good two hour walk from central Beijing. In all these places it is widely expected that you would get off of the HSR train and get onto some other form of transport (commuter rail, long distance rail, metro, bus, taxi, uber, etc.) to reach most major destinations in the city (or most of the hotels).
And, the "last mile" problem you are identifying here is a 10-20 minute taxi ride (in most traffic conditions) or a 15-ish minute transit ride. This is hardly a burden.
Ottawa has this weird phobia of following best practices in transportation. We built a BRT where other cities would build rail. We used tram vehicles where other cities would use light metro vehicles. Now we want to use HSR where other cities would use a metro.