Can't post them, but looking at plans now for new Irving. Building is half "Food Hall" and half "Circle K", so not a Big Stop likely due to space limitations. Parking lot on the Wright Ave side. One 6-pump island floating in the middle, trucks only in a space behind the building. Car wash proposed as well.
Do you see any confirmed EV chargers on that plan?
I see that Armour Group has applied for a Development Only Permit for an 80,000sqft office building at 236 Brownlow Avenue. The application indicates it'll be a mix of 4-5 storeys and be connected with a pedway to the existing building. This is the same spot as Tesla. There is empty space on the end of the property closest to Burnside Drive. I believe they intended to do this years ago when they tore down part of the existing building and built the parking structure, then the pandemic hit.