Centre platforms (requiring left side doors) seem to make the most sense where there are space constraints that would make them make sense for a good portion of stations—which exist on Madison in Seattle, but don't really exist here on either KGB or 200 Street.

Instead, the Metrotown-North Shore roadway corridors have space constraints at some locations such that I can see TL opting to use centre platforms and a 5-door bus design on that line running out of BTC (Although I find it more likely that TL would just try to avoid the requirement altogether).
Reply With Quote
     
     
  #2162  
Old Posted Jan 16, 2026, 11:47 PM
bardak bardak is offline
Registered User
 
Join Date: Oct 2010
Posts: 370
Quote:
Originally Posted by xd_1771 View Post
Centre platforms (requiring left side doors) seem to make the most sense where there are space constraints that would make them make sense for a good portion of stations—which exist on Madison in Seattle, but don't really exist here on either KGB or 200 Street.

Instead, the Metrotown-North Shore roadway corridors have space constraints at some locations such that I can see TL opting to use centre platforms and a 5-door bus design on that line running out of BTC (Although I find it more likely that TL would just try to avoid the requirement altogether).
I feel like TL will do everything to avoid getting 5 door buses, especially for Metrotown-North which is supposed to be replaced by a SkyTrain. I feel like if they are constrainted for space they will just run curbside instead of centre running
Reply With Quote
     
     
  #2163  
Old Posted Jan 17, 2026, 12:56 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,788
Quote:
Originally Posted by bardak View Post
I feel like TL will do everything to avoid getting 5 door buses, especially for Metrotown-North which is supposed to be replaced by a SkyTrain. I feel like if they are constrainted for space they will just run curbside instead of centre running
How about "diverging diamond centre platform stations"?
Reply With Quote
     
     
  #2164  
Old Posted Jan 17, 2026, 1:52 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,667
Quote:
Originally Posted by aberdeen5698 View Post
How about "diverging diamond centre platform stations"?
That's what was proposed for the Hwy 99 bus stations under the Liberal bridge plan.
Here's the plan for the Steveston interchange you posted in 2017!
You can see the criss-cross before and after the bus platform to get the doors to the platform side.
In Los Angeles, the Harbour Transitway express bus line has similar stations.

Quote:
Originally Posted by aberdeen5698 View Post
Here's a pic of the Harbor Transitway in LA. It can probably be done in a narrower width.

https://www.transit.wiki/Harbor_Freeway_Station

Last edited by officedweller; Jan 17, 2026 at 2:03 AM.
Reply With Quote
     
     
  #2165  
Old Posted Jan 17, 2026, 2:15 AM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,681
Hastings Street Bus Priority changes in Vancouver

Quote:
Extending bus lane hours between Kaslo St / Renfrew St to Boundary Rd (24 hours per day, 7 days per week)
Parking and high occupancy vehicles (HOV) will no longer be permitted to use the curb lane


https://vancouver.ca/streets-transportation/hastings-street-transit-improvements.aspx

Bus stop spacing changes are also planned
Reply With Quote
     
     
  #2166  
Old Posted Jan 17, 2026, 6:58 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,667
Meanwhile, the brand new Finch LRT in Toronto is closed for the second day after a snowstorm.

https://x.com/isaaccallan/status/2012174988053258669/photo/1
Reply With Quote
     
     
  #2167  
Old Posted Jan 23, 2026, 2:10 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,667
Mark V seating change noted in this IG post:

https://www.instagram.com/reels/DTwodjME5Gp/
Reply With Quote
     
     
  #2168  
Old Posted Jan 23, 2026, 12:10 PM
cganuelas1995 cganuelas1995 is offline
Registered User
 
Join Date: Jan 2017
Posts: 1,652
Hot take: the price of the monthly passes should cost no more (and in fact less) than 40 trips through the respective number of zones.
Reply With Quote
     
     
  #2169  
Old Posted Jan 23, 2026, 4:45 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,618
Quote:
Originally Posted by cganuelas1995 View Post
Hot take: the price of the monthly passes should cost no more (and in fact less) than 40 trips through the respective number of zones.
Have you done the math on monthly passes?
Reply With Quote
     
     
  #2170  
Old Posted Jan 23, 2026, 7:52 PM
logan5's Avatar
logan5 logan5 is offline
Registered User
 
Join Date: Feb 2011
Location: Mt.Pleasant - The New Downtown South
Posts: 8,166
I guess doing cut and cover, below grade BRT stations is out of the question, but it would eliminate BRT interaction with general traffic and busy intersections, where you have to deal with cars turning left (or right). So you reduce the amount of accidents, and increase average speed to close to rail transit.

Obviously that would add greatly to the cost, but still be well be below Skytrain. Capacity will increase with technological advances, so BRT can be used for many decades.
Reply With Quote
     
     
  #2171  
Old Posted Jan 23, 2026, 9:08 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,131
The expensive part of SkyTrain is the grade-separation, not the rail. A BRT in a tunnel is the same cost but less capacity.
Reply With Quote
     
     
  #2172  
Old Posted Jan 24, 2026, 12:26 AM
logan5's Avatar
logan5 logan5 is offline
Registered User
 
Join Date: Feb 2011
Location: Mt.Pleasant - The New Downtown South
Posts: 8,166
So with curbside BRT, do drivers have to make a right turn from the second lane, cutting in front of the BRT lane when they turn, or do drivers do as they do now, and go into the bus lane/curb lane so they can make their right turn?

It is a lot more dangerous doing a right turn from the second lane, plus it blocks traffic. If you do your turn from the curb lane, it blocks the BRT buses. That's why it is so much better to have center running BRT, and why I suggested below grade stations.

Translink is quoted as saying BRT costs 20 million per km, but if you add cut and cover below grade stations, that would probly add 100 million per km. That would allow BRT in the centre lanes, and it would bring you much closer to Skytrain level of service and speed, and still saving a huge amount of money with the Broadway Line costing 500 million per km.
Reply With Quote
     
     
  #2173  
Old Posted Jan 24, 2026, 12:42 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,131
Surface BRT in the rightside lane either A) waits for the driver to complete their turn, B) goes before the driver, or C) gets its own light so that it clears the intersection before the driver's even allowed to turn. Surface BRT in the median solves that problem without the need for a tunnel.

The whole point of bus lanes is to provide a cheap, easy-to-deliver stopgap between regular buses and their SkyTrain replacement decades later; spending 1/4th the cost/km on a "permanent" solution with 1/4th the capacity defeats that point, just like the various LRT plans. Last thing Metro Vancouver needs is all the funding being diverted to a Finch West on wheels.
Reply With Quote
     
     
  #2174  
Old Posted Jan 24, 2026, 3:18 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,170
Quote:
Originally Posted by logan5 View Post
So with curbside BRT, do drivers have to make a right turn from the second lane, cutting in front of the BRT lane when they turn, or do drivers do as they do now, and go into the bus lane/curb lane so they can make their right turn?
Translink’s current concept:

Quote:
Originally Posted by madog222 View Post

Images from Translink
Reply With Quote
     
     
  #2175  
Old Posted Jan 26, 2026, 5:44 PM
cganuelas1995 cganuelas1995 is offline
Registered User
 
Join Date: Jan 2017
Posts: 1,652
Quote:
Originally Posted by WarrenC12 View Post
Have you done the math on monthly passes?
I have actually. Let's assume these are used by commuters working a full time job 5 days a week, that they commute through within all zones they bought the pass for, and that they don't have to take transit on days off.

1 zone=$111.60, divided by $2.70 per trip=42 trips to break even

2 zone=$149.25, divided by $4.00 per trip=38 trips to break even

3 zone=$201.55, divided by $5.10 per trip=42 40 trips to break even

Kinda inconsistent here. The 2 zone M-F 9-5 commuters get two free trips while the others have to make 2 trips in order to get their moneys worth.

No idea who came up with that pricing.

Last edited by cganuelas1995; Jan 27, 2026 at 12:25 PM.
Reply With Quote
     
     
  #2176  
Old Posted Jan 26, 2026, 5:52 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,618
That is dumb. Last time I looked they all broke even around 38 trips.

Given we have around 1 stat holiday a month, they should be more like 35 trips if you want people to use them.
Reply With Quote
     
     
  #2177  
Old Posted Jan 26, 2026, 8:04 PM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,082
Quote:
Originally Posted by WarrenC12 View Post
That is dumb. Last time I looked they all broke even around 38 trips.

Given we have around 1 stat holiday a month, they should be more like 35 trips if you want people to use them.
$201.55 divide by $5.10 is about 39.5 trips, not 42...

The 1 zone monthly pass was always in the 41-42 trip range. I know because I used to get it when I had to commute to office 5 days per week, so I'll always need to take some trips on the weekends or mid-day to make it worth while.

The 3 zone pass used to be in the 36-38 trip range. I guess the cost of 3 zone ticket did not increase as much as 1 or 2 zone? If 3 zone is priced at $5.30 (similar to the difference between 1 and 2 zones), then you get about 38 trips.
Reply With Quote
     
     
  #2178  
Old Posted Jan 26, 2026, 11:58 PM
ilikeredheads ilikeredheads is offline
Registered User
 
Join Date: Sep 2016
Location: west coast
Posts: 651
2 zone or 3 zone pass is only worth if you have a M-F 9-5 job AND take either seabus/skytrain across a zone boundary, otherwise just stick to a 1 zone pass.
If you get off after 630pm, get a 1 zone.
If you take the bus to cross the zone boundary, get a 1 zone.
Reply With Quote
     
     
  #2179  
Old Posted Jan 27, 2026, 12:02 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,788
With Compass Cards the idea of daily or monthly passes is terrible. If you have a pass loaded into your card it gets used preferentially whether you want it to or not - so you might blow a daily pass you didn't intend to use until later.

IMHO the way it should work is that daily trips max out at the cost of a daily pass and then subsequent trips are free. Similarly, if you make more trips in a calendar month than the cost of a monthly pass then it should simply cap the cost at the monthly pass and the remainder of the rides that month are free.
Reply With Quote
     
     
  #2180  
Old Posted Jan 27, 2026, 12:34 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,082
Quote:
Originally Posted by aberdeen5698 View Post
With Compass Cards the idea of daily or monthly passes is terrible. If you have a pass loaded into your card it gets used preferentially whether you want it to or not - so you might blow a daily pass you didn't intend to use until later.

IMHO the way it should work is that daily trips max out at the cost of a daily pass and then subsequent trips are free. Similarly, if you make more trips in a calendar month than the cost of a monthly pass then it should simply cap the cost at the monthly pass and the remainder of the rides that month are free.
I keep all my day passes on a Canada 150 compass card, so that'll make sure I don't use the wrong one. In fact, I loaded so many back then that I still have about 4 or 5 passes left on that card...
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 6:33 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.