HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > Proposals


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #20  
Old Posted Jan 12, 2026, 9:10 PM
ChiND's Avatar
ChiND ChiND is online now
Registered User
 
Join Date: Aug 2023
Location: Sheboygan
Posts: 2,663
Quote:
Originally Posted by NYguy View Post
That’s all from the pre-certification step, before ULURP officially begins. Ine of the options was a hotel/residential tower that woukd have been a supertall. Extell also planned to spread a little on a smaller, existing property down the block (the site assemblage is most of the block). This never entered ULURP, and Extell got a partner for the site, which is what’s happening now.
Are you referring to 570 Fifth? If so, do you think that the St. Thomas air rights are being used for that site as suggested by HCS above?
__________________
24601
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Global Projects & Construction > Proposals
Forum Jump



Forum Jump


All times are GMT. The time now is 4:01 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.