HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Dec 11, 2025, 4:01 AM
craner's Avatar
craner craner is offline
Go Tall or Go Home
 
Join Date: Mar 2007
Location: Calgary
Posts: 7,287
Quote:
Originally Posted by elly63 View Post
Off topic

Interesting story shaping up about the Olympic hockey venue in Milan being 3-4 feet short of not only an Olympic sized rink but the smaller NHL regulation rink.

Another problem? Construction is still ongoing, a little more than two months from the opening ceremony. One source well-versed on the building’s status told The Athletic that organizers needed a “big bomb,” not just a fire, lit under them with the clock ticking loudly.

The NHL has been raising alarms about the arena for years, with commissioner Gary Bettman expressing concern as far back as the Board of Governors meeting in December of 2023 about the fact that construction hadn’t started at that point. When a group of league personnel toured the site southeast of Milan in August, it found an arena still under construction, with no infrastructure complete, including no roads built to the building. They’d also yet to break ground on the practice facility.

Life imitating art

Video Link
Love this 😂
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 11:13 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.