Quote:
Originally Posted by Migrant_Coconut
I'm guessing very little change - IIRC the bottleneck isn't Waterfront, it's everything between it and Coquitlam.
|
It's double tracked (or more) that entire length, it's only a bottleneck because CPKC uses dated signaling tech, as well as the insistance on "precision railroading", making trains longer, slower, with less crews to keep things moving. Meaning large trains will block the tracks as they're processed car by car in the port, moving slower along the way, with delays because less crews means delays.
Electrify the railroad, upgrade the signaling tech, and abandon precision railroading as a business practice, and you won't have a bottleneck here with current rail traffic volumes. At which point providing all day WCE could actually happen, but doing these simple things that countries with a fraction of our wealth can somehow manage is never going to happen because we refuse to effectively legislate our railroads.