Locke Landing is also rapidly reaching various stages of completion before construction wraps up end of next year.












Last edited by Notonfoodstamps; Aug 14, 2025 at 6:55 PM.
Reply With Quote
     
     
  #1202  
Old Posted Aug 26, 2025, 7:56 PM
Notonfoodstamps Notonfoodstamps is offline
 
Join Date: Dec 2022
Posts: 283
https://static1.squarespace.com/static/6.../HP+Community+Update+-+Summer+2025-1.pdf

Updates to MCB’s Harbor Place/Inner Harbor master plan. Ground breaking is scheduled for 2026
Reply With Quote
     
     
  #1203  
Old Posted Sep 19, 2025, 12:09 AM
Notonfoodstamps Notonfoodstamps is offline
 
Join Date: Dec 2022
Posts: 283
301 President Street is back on for potential development. Slightly reduced preliminary proposed height.

https://baltimorefishbowl.com/stories/li...partment-building-at-301-s-president-st/

Reply With Quote
     
     
  #1204  
Old Posted Sep 24, 2025, 8:26 PM
Notonfoodstamps Notonfoodstamps is offline
 
Join Date: Dec 2022
Posts: 283
School of Social Work designed by Ballinger is well underway on the corner of Green and W Lexington St.

https://www.umaryland.edu/designandconst.../school-of-social-work-building-project/

Reply With Quote
     
     
  #1205  
Old Posted Oct 20, 2025, 2:39 PM
Notonfoodstamps Notonfoodstamps is offline
 
Join Date: Dec 2022
Posts: 283


Old article but 6-story 160 unit Art House is scheduled to break ground EoY or beginning of ‘26

https://baltimorefishbowl.com/stories/ar...posed-for-baltimores-station-north-area/

Also the 7-story +400 unit Avalon Bay is well under construction (final render below) in Canton.


Last edited by Notonfoodstamps; Oct 20, 2025 at 9:01 PM.
Reply With Quote
     
     
  #1206  
Old Posted Dec 4, 2025, 12:30 AM
Notonfoodstamps Notonfoodstamps is offline
 
Join Date: Dec 2022
Posts: 283
Phase II of CVP Stadium Square finally broke ground this week after being stalled for ~5 years.

319 units coming to Federal Hill

https://www.southbmore.com/2025/12/03/st...m-square-development-in-south-baltimore/



Reply With Quote
     
     
  #1207  
Old Posted Dec 8, 2025, 10:53 PM
SouthCentralPA SouthCentralPA is offline
 
Join Date: Jan 2021
Posts: 562
Quote:
Originally Posted by Notonfoodstamps View Post
Phase II of CVP Stadium Square finally broke ground this week after being stalled for ~5 years.

319 units coming to Federal Hill

https://www.southbmore.com/2025/12/03/st...m-square-development-in-south-baltimore/
Just drove by this site a few weeks ago but don't think they had started here yet. Reading the article, it's crazy they are still proposing to build an office building.
Reply With Quote
     
     
  #1208  
Old Posted Dec 10, 2025, 8:13 PM
Notonfoodstamps Notonfoodstamps is offline
 
Join Date: Dec 2022
Posts: 283
Quote:
Originally Posted by SouthCentralPA View Post
Just drove by this site a few weeks ago but don't think they had started here yet. Reading the article, it's crazy they are still proposing to build an office building.
It officially broke ground last week. The site was cleared years ago so ground/foundation work is in progress before vertical construction can begin early next year. I drive by it everyday to on my lunch break.
Reply With Quote
     
     
  #1209  
Old Posted Jan 4, 2026, 11:29 PM
SouthCentralPA SouthCentralPA is offline
 
Join Date: Jan 2021
Posts: 562
Quote:
Originally Posted by Notonfoodstamps View Post
It officially broke ground last week. The site was cleared years ago so ground/foundation work is in progress before vertical construction can begin early next year. I drive by it everyday to on my lunch break.
Thanks for the update!
Reply With Quote
     
     
  #1210  
Old Posted Jan 9, 2026, 12:03 AM
Notonfoodstamps Notonfoodstamps is offline
 
Join Date: Dec 2022
Posts: 283
Reply With Quote
     
     
  #1211  
Old Posted Jan 11, 2026, 8:17 PM
Notonfoodstamps Notonfoodstamps is offline
 
Join Date: Dec 2022
Posts: 283
Baltimore's Rashfield Phase II.

Pic is about 1 1/2 months old. The outline of the cement pathways are now visible so the park is starting to take final shape in the upcoming months ahead of it's June/July grand opening

Reply With Quote
     
     
  #1212  
Old Posted Jan 25, 2026, 7:42 PM
Notonfoodstamps Notonfoodstamps is offline
 
Join Date: Dec 2022
Posts: 283
Sanctuary at Cross Keys timelapse from August - December 2025. Building is 7 stories vs. original proposed 6.

https://www.youtube.com/watch?v=VK5qnrj_LRk

Last edited by Notonfoodstamps; Jan 25, 2026 at 9:51 PM.
Reply With Quote
     
     
  #1213  
Old Posted Jan 31, 2026, 2:54 PM
Notonfoodstamps Notonfoodstamps is offline
 
Join Date: Dec 2022
Posts: 283
Foundational pile driving is well underway for the Key Bridge replacement



The main pylons will be 609’ tall with a main span of 1665' (second only the the Gordie Howe Bridge), so this is a substantial civil engineering undertaking. The bridge will massively impact the cities skyline, as it will be the tallest free-standing structure in city come 2030 completion.

Last edited by Notonfoodstamps; Jan 31, 2026 at 11:44 PM.
Reply With Quote
     
     
  #1214  
Old Posted Feb 10, 2026, 11:30 PM
Notonfoodstamps Notonfoodstamps is offline
 
Join Date: Dec 2022
Posts: 283
Wexford is developing two apartment buildings 356 unit (15 story) / 250 unit (11 story) on the northern side of UMD's Baltimore's campus.

https://www.bizjournals.com/baltimore/ne...rd-lexington-street-housing-project.html



Reply With Quote
     
     
  #1215  
Old Posted Feb 12, 2026, 3:10 PM
Notonfoodstamps Notonfoodstamps is offline
 
Join Date: Dec 2022
Posts: 283
Roslyn and Leonard Stoler Center for Advanced Medicine is wrapping up construction. Building is 13 FL & +200’ tall and covered in PTFE mesh that will be illuminated by LEDs.

Reply With Quote
     
     
  #1216  
Old Posted Feb 23, 2026, 3:24 PM
Notonfoodstamps Notonfoodstamps is offline
 
Join Date: Dec 2022
Posts: 283
https://www.bizjournals.com/baltimore/ne...er-innovative-care-center-baltimore.html

The Kennedy Krieger Institute is developing a new $250 million, 10-story Innovative Care Center in East Baltimore to double its capacity for treating children with complex neurorehabilitation needs, catastrophic injuries, and severe illnesses.

Reply With Quote
     
     
  #1217  
Old Posted Mar 10, 2026, 5:46 PM
Notonfoodstamps Notonfoodstamps is offline
 
Join Date: Dec 2022
Posts: 283
UMD School of Social work from a few weeks during the topping off ceremony



The skin is currently up to the 4th floor now.
Reply With Quote
     
     
  #1218  
Old Posted Mar 25, 2026, 10:12 PM
202_Cyclist's Avatar
202_Cyclist 202_Cyclist is offline
 
Join Date: Feb 2009
Posts: 6,450
It is amazing that after about 15 years of this, people are still willing to be scammed by (F)Elon.

The Ravens’ mysterious collab with Elon Musk’s tunnel company ends before it begins

By Daniel Zawodny
Baltimore Banner
3/25/2026

"A Baltimore Ravens/Elon Musk tunnel project never left the station this week.

A project called “Ravens Loop” is one of three selected Tuesday by Musk’s The Boring Co. to be eligible for construction on the company’s dime.

The company put out a call for pitches in January as part of its “Tunnel Vision Challenge” for any kind of tunnel project (pedestrian, utility, a travel lane for Teslas, etc.) up to a mile long..."

https://www.thebanner.com/community/tran...ns-elon-musk-PLCYFSIE3RGWJPKK5KDTCTA5NU/
Reply With Quote
     
     
  #1219  
Old Posted Mar 31, 2026, 3:59 PM
Notonfoodstamps Notonfoodstamps is offline
 
Join Date: Dec 2022
Posts: 283
Quote:
Originally Posted by 202_Cyclist View Post
It is amazing that after about 15 years of this, people are still willing to be scammed by (F)Elon.

The Ravens’ mysterious collab with Elon Musk’s tunnel company ends before it begins

By Daniel Zawodny
Baltimore Banner
3/25/2026

"A Baltimore Ravens/Elon Musk tunnel project never left the station this week.

A project called “Ravens Loop” is one of three selected Tuesday by Musk’s The Boring Co. to be eligible for construction on the company’s dime.

The company put out a call for pitches in January as part of its “Tunnel Vision Challenge” for any kind of tunnel project (pedestrian, utility, a travel lane for Teslas, etc.) up to a mile long..."

https://www.thebanner.com/community/tran...ns-elon-musk-PLCYFSIE3RGWJPKK5KDTCTA5NU/
Yeah, I'm glad the city/Ravens promptly washed their hands off with the proposal.
Reply With Quote
     
     
  #1220  
Old Posted Apr 2, 2026, 12:01 AM
Notonfoodstamps Notonfoodstamps is offline
 
Join Date: Dec 2022
Posts: 283
The Blake @Somerset broke ground last month.

8-stories with 190-units






Last edited by Notonfoodstamps; Apr 13, 2026 at 4:37 PM.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump



Forum Jump


All times are GMT. The time now is 12:50 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.