Quote:
Originally Posted by DarthVader_1961
Sorry…. This should have read…
Anyone know when the bearing design is to be tested on our tracks
|
Who knows. Everyone had agreed the bearing assembly was the problem, a year (?) later, Alstom decided that wasn't the problem and stopped working on it. Not sure where we're at now.
Quote:
Originally Posted by roger1818
Hard to call the design faulty when it has been used without issues for many years on other trainsets. Fit for purpose would be a better description. Part of the issue likely comes down to the city insisting on LRT trainsets when all of the experts were saying we needed light metro. I am sure there are lots of other secret details that the city is trying to keep under wraps.
|
It's true that the City was very stupid in insisting on LRT when experts were telling us what we need is a metro (OtTaWa iS tO sMaLl fOr A rEaL SuBwAy). But three (maybe two, I think one proposed a real metro) consortiums were even dumber by submitting bids with rolling stock that could not do the job.
This is what I'm talking about with the secret settlement:
https://ottawacitizen.com/news/local...t-construction