HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Nov 20, 2025, 1:52 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 27,635
Quote:
Originally Posted by DarthVader_1961 View Post
Sorry…. This should have read…

Anyone know when the bearing design is to be tested on our tracks
Who knows. Everyone had agreed the bearing assembly was the problem, a year (?) later, Alstom decided that wasn't the problem and stopped working on it. Not sure where we're at now.

Quote:
Originally Posted by roger1818 View Post
Hard to call the design faulty when it has been used without issues for many years on other trainsets. Fit for purpose would be a better description. Part of the issue likely comes down to the city insisting on LRT trainsets when all of the experts were saying we needed light metro. I am sure there are lots of other secret details that the city is trying to keep under wraps.
It's true that the City was very stupid in insisting on LRT when experts were telling us what we need is a metro (OtTaWa iS tO sMaLl fOr A rEaL SuBwAy). But three (maybe two, I think one proposed a real metro) consortiums were even dumber by submitting bids with rolling stock that could not do the job.

This is what I'm talking about with the secret settlement: https://ottawacitizen.com/news/local...t-construction
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 12:44 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.