Quote:
Originally Posted by Biff
Wpg_Guy will do a much better job of posting this project, but here is the first building for the Water Tower District. 6 storey - 91 Units. They will be dismantling the actual water tower and relocating it to a different location.
|
Water Tower Mixed Use
Location: Ibrahima Diallo Avenue
Neighbourhood: Stock Yards -
St. Boniface Ward (Riel Community Committee)
Developer: Rockport Investment Group Inc.
Architect: UrbanEdge Architecture
Status: In development
Documents: Plan Approval,
Submitted Plans – April 28, 2026
Media:
Description: Rockport is proposing the first residential development in the Water Tower District, a new 5-storey mixed-use building. The project includes 91 residential units and ground-floor commercial space, along with substantial parking and amenity areas. The building measures 70 feet tall, featuring a basement for underground parking, a main floor with 4,405 sq ft (409.2 m²) of commercial space in two units, plus amenity space and a lobby. Floors 2 through 5 will house the residential component: 48 one-bedroom, 28 two-bedroom, and 16 three-bedroom units. Parking provisions exceed requirements, with a total of 138 vehicle stalls (105 interior, including underground and ground-level, plus 33 surface stalls for visitors and commercial use) against a minimum of 117, and 28 bicycle stalls (exceeding the minimum of 15). The design incorporates a large private courtyard and outdoor amenity space at the rear, enclosed refuse facilities, generous landscaping that meets or exceeds city standards (including 43 trees and over 150 shrubs along streets, foundations, and parking areas), pedestrian sidewalks connecting to Ibrahima Diallo Avenue, and exterior finishes in varied metal cladding. The existing on-site water tower is planned for disassembly and relocation.
Permits: