HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Nov 12, 2025, 2:41 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,798
In addition, the 'sea wall' is at the end of the Canada Ljne station between it and Expo Waterfront Station. That's the massive concrete barrier separating downtown from the reclaimed areas that used to be waterfront.
You'd have to branch off further south and leave the station as a stub.

If you want a Main St line, you could reorient Expo Line and WCE tracks to create 2 Expo platforms - one for a terminus for either a Hastings Line and a Main St line. The Waterfront Hub study contemplated another platform. (whether commuter rail or SkyTrain).
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 6:47 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.