Quote:
Originally Posted by logan5
Just to provide some counterpoints to this... If you are buying more construction materials, you tend to get a better price,
|
That's not true.
Construction materials tend to be standardized in price depending on what you're using them for, so for a particular project you'll get the same price regardless of whether the project is 50 storeys at one point and gets downsized to 30 storeys later on.
It's not like you had a deal when it was a taller tower and had the concrete for a cheaper rate, and then suddenly when you don't need as much and the tower gets downsized, you get a higher price again.
That's not how it works.
And costs have to be relatively controlled and stable throughout the process.
If there's a price hike in the general economy for a particular material - like say,...(in the literal current circumstances)......steel (with tariffs and all),...everyone gets affected equally and proportionately to how much they need.
Quote:
Originally Posted by logan5
.....and for labour which is a huge cost, that goes down the higher you go as well, .....because the trades get more familiar with the layout of the building and consequently they do things much faster.
|
Also not entirely accurate, but more to the point, not ncessarily exactly what I meant when I said labour costs go up.
So for a 50, 60 or 70 storey tower, you'll need wind-load experts and wind-dampener system installation done which wouldn't be the case for a much shorter tower.
Guess what all that extra specialized labour is going to do to your budget.
Quote:
Originally Posted by logan5
The final 30 stories of that tower will happen much quicker than the first 30 stories.
|
That's only true insofar as the first 30 storeys will contain the podium that typically eats up the bulk of the time of your construction schedule
However,......
Firstly, that first 30 storeys on a 60 or 70 storey tower contains more structural reinforcement (i.e. bigger and thicker columns), a bigger core (for more elevators) -> which means more time to construct those added elements and the additional time for all that extra conrete to set.
So actually, the first 30 storeys of a 60 storey tower will go significantly slower than a 30 storey tower. (or the first 30 of a shorter tower).
Secondly, in a 60 or 70 storey tower, you're STILL accounting for the time that the first 30 storeys take to build so regardless of whether the rest of it goes comparatively faster, the overall construction time is still longer than that of a 30 storey tower (or even two constructed concurrently), and it will still get completed and occupied several months before the 60 or 70 storey tower gets completed, thus get units to market faster.
Furthermore, remember all that wind-damping and wind-shear stuff we said might need to get done in the taller tower that typically isn't necesary in shorter towers?
Yeah, those take quite some time to get fully installed too.
In addition to any additional mechanical systems (or entire floors).
And all this while even saying nothing yet of the additional (and deeper) piling beneath grade as well as possible foundation slab tanking for taller towers than might not be necessary for shorter towers in certain areas.
More time.
More $$$$$.
If you have two projects of identical density, but one is a 70 storey tower, and the other is a pair of 30-something towers that start construction at the same time (with the two tower project building both towers simultaneously), the second project will be completed much faster all day, any day of the year you measure them.
A good (but admittedly inelegant) illustration of this would actually be Concord's project in Metrotown- with the 3 phase one towers at 30 something storeys, 45 and the 65 storey grand tower.
The two shorter towers will be topped out and likely completed several months before the taller tower tops out, and they even tried to mitigate this discrepancy a bit by staggering the construction schedules to delay the shortest tower by some distance earlier on, while giving the other two towers a headstart - to allow them to finish up a as close to each other as possible, as I'm sure they'd prefer to get occupancy for all three as close to each other as possible.
Otherwise you'd have the two shorter towers fully complete and ready for occupancy while the third would still be several months away, even while all three expect to share the podium amenities and share podium and grade access, and that would be difficult with construction equipment for the third tower still about and all over the place.
But even with that, you'll still have the shorter towers top out faster, and then I imagine they'll slow down the process to finish out the interiors and interior fittings for both towers as well as the retail podium, while the tallest tower catches up.
And bear in mind, the two shorter towers I believe have more (Residential) density than the third tower on its own.
If these were separate projects (the Grand Tower a single project while the two other towers a separate single project), the shorter towers would definitely be getting (more) units to market and occupancy several months faster.
Quote:
Originally Posted by logan5
That is why I argue that more units come on line faster with taller buildings.
I'm sure you are getting frustrated with my stubbornness, so I'll leave it at that. Needless to say, I am skeptical of what developers tell the public. 
|
No frustration on my part.
It's just a common misconception, that's all.
Beyond the logistics of the increased complexity of construction of taller towers versus, is the increased financial burden and risk that they come with as pointed out by Changing City and Jollyburger's links above - which also mean you're more likely to face a longer road (and thus slower process) with them than with shorter towers.
Especially if you need to get them done quickly as possibly and those units to market to pay off any financing loans and debts.