  #3101  
Old Posted Oct 7, 2025, 2:32 PM
Biff's Avatar
Biff Biff is offline
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 9,873
I think the past government had high hopes they were going to get some federal money to build the St Norbert by-pass. I believe that is why they didn't want to align Waverley and Kenaston.

Now in typical government fashion, we have two goofy at grade intersections where every observant passer by likely says "well that is strange, why do they have two roads so close together with two intersections. Why don't they just connect them?"
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
Reply With Quote
     
     
  #3102  
Old Posted Oct 7, 2025, 4:22 PM
Mr Tall Forehead's Avatar
Mr Tall Forehead Mr Tall Forehead is offline
Registered User
 
Join Date: Jul 2024
Location: Winnipeg
Posts: 840
They probably could have got federal dollars for the project if our glorious premier at the time wasn't such an abrasive a**hole towards Ottawa on every fed/prov issue.
Reply With Quote
     
     
  #3103  
Old Posted Oct 8, 2025, 5:17 PM
Wpgstvsouth94 Wpgstvsouth94 is offline
Registered User
 
Join Date: Aug 2020
Posts: 431
Quote:
Originally Posted by Wpgstvsouth94 View Post
Good morning! Has there been any news on the symington overpass east of 59? It says it’s supposed to start winter 2025 but I don’t recall any announcements regarding this or the desired alignment.
The Manitoba road con map is back online. They updated some projects with the symington overpass being pushed up to 2027-2030 now…
Reply With Quote
     
     
  #3104  
Old Posted Oct 8, 2025, 6:12 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,260
Winter 2025 would refer to Jan 2025 timeframe. Since we've heard zero on it, I'd imagine 2027 is the most realistic we could get at this point.
Reply With Quote
     
     
  #3105  
Old Posted Oct 8, 2025, 9:59 PM
Kinguni's Avatar
Kinguni Kinguni is offline
Registered User
 
Join Date: Mar 2008
Location: Manitoba
Posts: 1,570
Quote:
Originally Posted by Wpgstvsouth94 View Post
The Manitoba road con map is back online. They updated some projects with the symington overpass being pushed up to 2027-2030 now…
Hope it doesn't collapse before then.
Reply With Quote
     
     
  #3106  
Old Posted Oct 9, 2025, 12:07 AM
cllew cllew is online now
Registered User
 
Join Date: Feb 2012
Posts: 4,805
Quote:
Originally Posted by Wpgstvsouth94 View Post
The Manitoba road con map is back online. They updated some projects with the symington overpass being pushed up to 2027-2030 now…
I wonder if there are some issues (cost sharing or site access scheduling?) with CN as the bridge goes over the pulldown lead to the CN switching hump and the Sprague Sub Division running to eastern Canada thru the US.

I recall hearing a number of years ago when the bridge was being reinforced that CN did not want to give large blocks of time to the contractor so the project took longer than normal to finish.
Reply With Quote
     
     
  #3107  
Old Posted Oct 9, 2025, 1:00 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,260
This will definitely be a difficult area to work over the track. It is critical to CN ops. They'll likely need to prefab the bridge spans off site (Ie: to the side somewhere) and lift them into place during shorter work blocks. CN will not be shutting down for work blocks on daily basis to lift girders, and place the deck.

Maybe thats where one of the options to relocate the bridge further eastward would be better. And only have one span go over the pullback tracks. Instead of the current setup with 4 spans. And maybe why we haven't heard anything because long spans are expensive. Something like the tub girders at Kenaston and Bishop.
Reply With Quote
     
     
  #3108  
Old Posted Oct 9, 2025, 1:23 PM
Wpgstvsouth94 Wpgstvsouth94 is offline
Registered User
 
Join Date: Aug 2020
Posts: 431
Quote:
Originally Posted by Kinguni View Post
Hope it doesn't collapse before then.
That’s exactly why I was seeing if anyone knew anything haha! I drove under it and the girders and foundation are crumbling to dust. I would like to think it warrants a closure over the Arlington bridge…
Reply With Quote
     
     
  #3109  
Old Posted Oct 9, 2025, 3:05 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,260
The bridge was strengthened maybe 5-7 years ago. Thats what all the steel bracing and such are underneath. But it's definitely in rough shape haha
Reply With Quote
     
     
  #3110  
Old Posted Oct 9, 2025, 10:06 PM
Kinguni's Avatar
Kinguni Kinguni is offline
Registered User
 
Join Date: Mar 2008
Location: Manitoba
Posts: 1,570
Quote:
Originally Posted by bomberjet View Post
The bridge was strengthened maybe 5-7 years ago. Thats what all the steel bracing and such are underneath. But it's definitely in rough shape haha
More recent than that. Part of my commute route so I care, with retirement at least 3 years away.
Reply With Quote
     
     
  #3111  
Old Posted Oct 13, 2025, 2:39 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,260
1I noticed the province has removed the last 3 uncontrolled access points along the North Perimeter. The one eastbound near main street/paintball paradise and the 2 westbound Holmes road access points. (Well i only noticed one of these but assume they've removed both).

So that means they've closed all median openings and uncontrolled access on PTH 101. The remaining crossings have traffic signals (5 locations) or are railways (6 locations).
Reply With Quote
     
     
  #3112  
Old Posted Oct 13, 2025, 3:59 PM
Wpgdude Wpgdude is offline
Registered User
 
Join Date: Dec 2024
Posts: 23
Quote:
Originally Posted by bomberjet View Post
1I noticed the province has removed the last 3 uncontrolled access points along the North Perimeter. The one eastbound near main street/paintball paradise and the 2 westbound Holmes road access points. (Well i only noticed one of these but assume they've removed both).

So that means they've closed all median openings and uncontrolled access on PTH 101. The remaining crossings have traffic signals (5 locations) or are railways (6 locations).
No there is still at least one uncontrolled intersections on the north perimeter, west bound between mcphillips and pipeline, but the number has been reduced drastically. In my opinion there should be none but businesses and residents scream.
Reply With Quote
     
     
  #3113  
Old Posted Oct 14, 2025, 12:26 AM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,260
So my assumption was wrong then haha just close the bloody thing.
Reply With Quote
     
     
  #3114  
Old Posted Oct 27, 2025, 3:50 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,260
I pulled these specific projects our from the MTI (Provincial) advertising schedule for engineering consultants. Was updated in April. Does anybody know anything about these being released and/or being worked on? Some are still noted to be released in November.

A lot of these are the long standing projects that we've heard nothing about in recent years. Note that is A LOT of engineering work on very large projects for the Province. All to be done at the same time.

https://www.gov.mb.ca/mti/contracts/pdf/mti_consultant_assignments_2025.pdf

Feasibility Study Functional Improvements PTH 1: At W Jct PTH 10 and E Jct PTH 10 Brandon June (Brandon PTH 1 interchange)
Detailed Design Structure Replacement 001 At Symington Yard Overpass (East of Winnipeg) Springfield June (Symington Overpass)
Funtional Design Bituminous Reconstruction (Twinning) 059 PTH 52--PR 210 Hanover August (PTH 59/52 twinning to Steinbach)
Detailed Design Bituminous Reconstruction (Twinning) 003 1.6km East of PTH 100--Winnipeg City Limits Macdonald September (McGillivray Twinning)
Functional Design Bituminous Reconstruction (Twinning) 052 PTH 59--Mitchell (Broesky Rd) Hanover September (PTH 59/52 twinning to Steinbach)
Functional Design Bituminous Reconstruction (Twinning) 015 PTH 101--1.2km East of PR 206 Springfield October (PTH 15 twinning from 101 eastward)
Detailed Design Structure Replacement 001 001A PTH 1 & PTH 1A East Interchange, Portage la Prairie RM of Portage la Prairie October (Portage Bypass East Interchange)
Detailed Design Structure Replacement 100 At Red River: 1.8km East of PTH 75 City of Winnipeg November (South Perimeter Red River bridge)
Functional Design and Owners Engineer Bituminous Reconstruction (Twinning) 001 5.0km West of PR 301--Ontario Boundary November (PTH 1 Whiteshell Twinning)
Detailed Design Structure Rehabilitation 240 Grade Separation over CNR/CPKC Tracks on PR 240:0.6km North of PTH 1A Portage la Prairie November (PR 240 Rail Overpass Portage)
Detailed Design Structure Replacement 059 At Brokenhead River: 3.8km South of PR 319 (Vicinity of Scanterbury) St. Clements November (PTH 59N bridge, may hint at PTH 59 twinning options)
Reply With Quote
     
     
  #3115  
Old Posted Oct 27, 2025, 4:29 PM
Biff's Avatar
Biff Biff is offline
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 9,873
The next MTI Ad Schedule comes out Nov 21st.
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
Reply With Quote
     
     
  #3116  
Old Posted Oct 31, 2025, 4:39 AM
Carboy15's Avatar
Carboy15 Carboy15 is offline
CanAutoroute1
 
Join Date: Oct 2022
Location: Centerville of Canada
Posts: 594
https://stroadz.glide.page/dl/d0a5f4/s/c0a8e8/r/YH9cwg02wM31rE2lel2L

Design for Highway 59 and 52 shouldn't be crazy hard to do. I feel like a slight realignment of 59 could reduce expropriation of local accesses. I feel like a straightening of the Highway 59 and 52 Intersection to remove the skew angle is critical. Highway 52 has lots of accesses to private driveways, but I feel like there's enough space to fit 2 service roads North and South of 52 along with twinning.
Reply With Quote
     
     
  #3117  
Old Posted Oct 31, 2025, 4:42 AM
Carboy15's Avatar
Carboy15 Carboy15 is offline
CanAutoroute1
 
Join Date: Oct 2022
Location: Centerville of Canada
Posts: 594
https://stroadz.glide.page/dl/d0a5f4/s/c0a8e8/r/jfzat5966z8DyBqBuWeZ

I wonder how feasible it would be to build a bridge to connect Highway 75 with 311? It could compliment the Highway 59 twinning as Highway 75 could be used as a viable alternative.
Reply With Quote
     
     
  #3118  
Old Posted Oct 31, 2025, 5:40 AM
craner's Avatar
craner craner is offline
Go Tall or Go Home
 
Join Date: Mar 2007
Location: Calgary
Posts: 7,382
Just a general question:
Is there a reason Manitoba uses the term “Provincial Trunk Highway” (PTH) rather than just Provincial Highway - why the “Trunk” ?
Reply With Quote
     
     
  #3119  
Old Posted Oct 31, 2025, 6:26 PM
Andy6's Avatar
Andy6 Andy6 is offline
Starring as himself
 
Join Date: Mar 2002
Location: Toronto Yorkville
Posts: 9,762
Quote:
Originally Posted by craner View Post
Just a general question:
Is there a reason Manitoba uses the term “Provincial Trunk Highway” (PTH) rather than just Provincial Highway - why the “Trunk” ?
Because a PTH is a trunk route rather than a secondary highway.
__________________
crispy crunchy light and snappy
Reply With Quote
     
     
  #3120  
Old Posted Oct 31, 2025, 7:05 PM
Ozabald Ozabald is offline
Registered User
 
Join Date: Oct 2019
Posts: 1,116
Quote:
Originally Posted by Andy6 View Post
Because a PTH is a trunk route rather than a secondary highway.
I believe Manitoba and Nova Scotia are the only provinces which still formally use the term "trunk highway" and each uses the term differently. It's the complete opposite in Nova Scotia vs. Manitoba. Nova Scotia's arterial highways are signed as 100-series. The designation is applied to highways that are either a fully divided freeway or Super-2. The designation is also applied to sections of uncontrolled access highways which are deemed strategically important and are planned to be upgraded in the future to freeway. Trunk routes are secondary highways and there's a third classification called "Collector" highways.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 1:35 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.