  #321  
Old Posted Sep 21, 2025, 3:42 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,446
Sifton continues to work on the exterior finishing on their 8s Candela apartment building with cladding now being installed. Looks like most of the exterior brickwork is now done.
Reply With Quote
     
     
  #322  
Old Posted Sep 23, 2025, 12:50 PM
MrSlippery519 MrSlippery519 is offline
Registered User
 
Join Date: Dec 2010
Posts: 1,182
Have you seen anything else on the 1912 Linkway Boulevard site? The address suggests its on the north side of Riverbend road. There was a report on September 9th showing it as 1912 Linkway Blvd * Permit Not Submitted 207 units

Looks like they have also put more temporary parking on the corner between Candela and the Spektra buildings.
Reply With Quote
     
     
  #323  
Old Posted Sep 23, 2025, 2:50 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,446
I haven't seen any work by Sifton on the next building. Would not be surprised to see them give West5 a rest for a while until they see the vacancy rate on their two latest buildings. Also Drewlo will be renting their 14s building now under construction south of West5 in 2027 which will bring more supply into the area. York and Westdell have two rental project proposals up for zoning as well which will add to the supply in the area when and if they get built.

What to watch for are move in bonus's being offered like 1 or 2 months free rent in order to get tenants. The Eve Park condos and Tricar Condos in the area still have vacant units for sale.
Reply With Quote
     
     
  #324  
Old Posted Oct 4, 2025, 1:08 AM
CanadianTalk's Avatar
CanadianTalk CanadianTalk is online now
Moderator
 
Join Date: Jun 2021
Location: London, Ontario
Posts: 1,303
Quote:
Originally Posted by MrSlippery519 View Post
Have you seen anything else on the 1912 Linkway Boulevard site? The address suggests its on the north side of Riverbend road. There was a report on September 9th showing it as 1912 Linkway Blvd * Permit Not Submitted 207 units

Looks like they have also put more temporary parking on the corner between Candela and the Spektra buildings.

It appears that Sifton filed a building permit application today for their site at 1912 Linkway Blvd.

Still not sure what exactly the buildings will look like as I can't find anything about them on the West 5 website. It looks like the concept will be different than what was originally proposed because if you look at the master plan on the website, it says that it will be just apartment buildings at that corner of Riverbend/Linkway, yet they are now proposing a 1-storey commercial building as well: https://west5.ca/about/





Quote:
Originally Posted by CanadianTalk View Post

Posted in May 2025

A site-plan application was filed today for the next building to be constructed as part of the West 5 development.

This will be a 9-storey mixed-use apartment building.

There are no renderings or map details so I can't confirm what exactly it will look like or even where exactly it be. It has an address of 1912 Linkway Boulevard... which according to the City map is the entire large parcel of land north of Linkway between Riverbend Road and Logans Run... though if I had to guess, the building will likely be right at the north-east corner of Riverbend and Linkway (right across from the new park) as that spot is marked as "Coming Soon" on West 5's official map

https://west5.ca/about/

Reply With Quote
     
     
  #325  
Old Posted Oct 4, 2025, 6:15 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,446
Will be curious to see the vacancy rate in the Candela 8s building as they appear to be wrapping up the exterior on it.
Reply With Quote
     
     
  #326  
Old Posted Oct 9, 2025, 3:11 PM
MrSlippery519 MrSlippery519 is offline
Registered User
 
Join Date: Dec 2010
Posts: 1,182
Quote:
Originally Posted by CanadianTalk View Post
It appears that Sifton filed a building permit application today for their site at 1912 Linkway Blvd.

Still not sure what exactly the buildings will look like as I can't find anything about them on the West 5 website. It looks like the concept will be different than what was originally proposed because if you look at the master plan on the website, it says that it will be just apartment buildings at that corner of Riverbend/Linkway, yet they are now proposing a 1-storey commercial building as well: https://west5.ca/about/
Will be interesting to see when they release the plans, this was the original concept if you skip to 1:18 it shows a good view of this corner what was a 10 I think plus a single restaurant (which could not go there exactly now)
https://www.youtube.com/watch?v=aNqMyBpB1CI

The new plan still shows mixed use rentals https://west5.ca/about/
Reply With Quote
     
     
  #327  
Old Posted Oct 25, 2025, 7:44 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,446
Landscaping is now underway on the 8s Candela building and they have now started renting. This building is wrapping up. No signs of starting any of the other planned buildings on the West5 site at the moment.
Reply With Quote
     
     
  #328  
Old Posted Nov 5, 2025, 3:45 PM
MrSlippery519 MrSlippery519 is offline
Registered User
 
Join Date: Dec 2010
Posts: 1,182
Quote:
Originally Posted by jammer139 View Post
No signs of starting any of the other planned buildings on the West5 site at the moment.
Plenty of activity since you posted this, not sure if the work is preparation for the 1912 Linkway Blvd site or if it is just generally cleaning up. I suspect its for the 1912 Linkway Blvd site as they have moved a bunch of dirt on the south side, created a new temporary parking lot on the that side of Linkway Blvd and on the north west corner.
Reply With Quote
     
     
  #329  
Old Posted Nov 6, 2025, 2:43 PM
MrSlippery519 MrSlippery519 is offline
Registered User
 
Join Date: Dec 2010
Posts: 1,182
Just to update this, I walked by last night and the new holding location they created on the south side of Linkway Blvd now has 3 heavy equipment sitting there as well as a stack of big blue pipe.

I would imagine this is all for the 1912 address which we should see something new on sooner than later
Reply With Quote
     
     
  #330  
Old Posted Nov 20, 2025, 1:49 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,446
It looks like Sifton has also cleaned up some small trees and scrub in the empty field at the intersection of Oxford and Westdel Bourne.
Reply With Quote
     
     
  #331  
Old Posted Dec 2, 2025, 8:56 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,446
They are definitely doing utility prep and installation work here with large storm and sanitary sewer line installation going in. The new road that will connect west to east appears to be the focus and will serve the new mid rise buildings and commercial buildings plus the high rise buildings planned for the SE corner across from the LTC Home. Those probably won't happen until next decade.
Reply With Quote
     
     
  #332  
Old Posted Dec 18, 2025, 5:06 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,446
Looks like Sifton is applying to remove holding provisions for the next phase here at 1912 Linkway Blvd which will be for 9s T shaped building.

https://london.ca/sites/default/files/2025-12/Proposed%20Site%20Plan.pdf

Last edited by jammer139; Dec 19, 2025 at 6:18 PM.
Reply With Quote
     
     
  #333  
Old Posted Dec 18, 2025, 11:42 PM
Spoofy Spoofy is offline
Registered User
 
Join Date: May 2016
Posts: 132
When built, this will finally start to really pull together their West 5 development. Hopefully, they get the corner opposite this one built soon as well, as once that's done, then all lots along West 5's main road (Riverbend Road) will be built out.

Will also be interesting to see what Sifton has planned for the rest of the area, especially that huge corner block right at Oxford/Commissioners/Kains as that block has the highest density zoning applied to it.
Reply With Quote
     
     
  #334  
Old Posted Dec 19, 2025, 9:05 PM
MrSlippery519 MrSlippery519 is offline
Registered User
 
Join Date: Dec 2010
Posts: 1,182
Quote:
Originally Posted by Spoofy View Post
When built, this will finally start to really pull together their West 5 development. Hopefully, they get the corner opposite this one built soon as well, as once that's done, then all lots along West 5's main road (Riverbend Road) will be built out.

Will also be interesting to see what Sifton has planned for the rest of the area, especially that huge corner block right at Oxford/Commissioners/Kains as that block has the highest density zoning applied to it.
They have basic plans on their website for the project, though they do not keep the historical data of what was initially proposed much of it has been pretty close, look back in this thread there is lots of good information listed as well. This new 9 building and then the projected 12's across the street would really finish off that main area nicely.

Suspect the Oxford/Commissioners corner will be the last thing built and likely 10+years out.
Reply With Quote
     
     
  #335  
Old Posted Dec 21, 2025, 8:08 PM
CanadianTalk's Avatar
CanadianTalk CanadianTalk is online now
Moderator
 
Join Date: Jun 2021
Location: London, Ontario
Posts: 1,303
Quote:
Originally Posted by jammer139 View Post
Looks like Sifton is applying to remove holding provisions for the next phase here at 1912 Linkway Blvd which will be for 9s T shaped building.

https://london.ca/sites/default/files/2025-12/Proposed%20Site%20Plan.pdf
It's nice to finally see a site-plan for this building.... I also see that a zoning application has been filed for this last week as well, so hopefully we will see some renderings soon.

As MrSlippery519 mentioned, it looks like there are some 10 to 12 storey buildings proposed across the street beside the park, and one between the recently constructed Spektra and Candela buildings. I’m really liking how West5 has been coming together over the past 10 years, especially the mixed-use section... looking forward to seeing the next few buildings get started.






Also, it looks like Sifton recently updated the master plan on the West5 website because this is the first time I am now seeing some plans for right at the north-east corner of Oxford and Westdel... which looks like some 1-storey retail pads. I wonder if we will see a grocery store here soon... I'd think it would do very well due to all the development out here at West5, Riverbend, etc (and Komoka-Kilworth as well).

Reply With Quote
     
     
  #336  
Old Posted Dec 23, 2025, 1:46 PM
MrSlippery519 MrSlippery519 is offline
Registered User
 
Join Date: Dec 2010
Posts: 1,182
Quote:
Originally Posted by CanadianTalk View Post
Also, it looks like Sifton recently updated the master plan on the West5 website because this is the first time I am now seeing some plans for right at the north-east corner of Oxford and Westdel... which looks like some 1-storey retail pads. I wonder if we will see a grocery store here soon... I'd think it would do very well due to all the development out here at West5, Riverbend, etc (and Komoka-Kilworth as well).

Noticed the updated plans as well thanks for posting here also!

The north-east corner of Oxford and Westdel you mentioned they were grading and moving dirt about 3 weeks ago and I thought nothing of it. This new plan certainly gives the impression those are also going to be starting sooner than later.

Also they have poured curbs part of the stretch on Linkway Blvd up to the corner of Logans runs and then heading west towards the new 9's building being proposed, they stopped short of Riverbend road assuming due to the construction access.
Reply With Quote
     
     
  #337  
Old Posted Jan 14, 2026, 6:57 PM
MrSlippery519 MrSlippery519 is offline
Registered User
 
Join Date: Dec 2010
Posts: 1,182
Noticed a construction trailer on site as of last week, they have been moving dirt all week on this corner (Riverbend / Linkway). Construction fence was up a few weeks ago, seems like they are moving along quickly.
Reply With Quote
     
     
  #338  
Old Posted Feb 12, 2026, 4:46 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,446
A caisson drilling rig machine is now drilling new pilings for the 9s building on the NE corner of Linkway and Riverbend.

Also of note they have a roofing crew replacing the roof on the Riverstone Villas one story condos. These were just built a few years ago and they already need to have the roofs replaced. 🞵🞵🞵?
Reply With Quote
     
     
  #339  
Old Posted Feb 28, 2026, 9:06 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,446
Caisson drilling rig continues to work the north end of the site. While excavator and shoring crew are starting to dig along the south side of the property.
Reply With Quote
     
     
  #340  
Old Posted Mar 4, 2026, 3:35 PM
MrSlippery519 MrSlippery519 is offline
Registered User
 
Join Date: Dec 2010
Posts: 1,182
Surprised we do not have actual renderings of this yet, as Jammer mentions they are going quick. Lots of activity early in the morning and throughout the day here, digging, shoring the southside, etc.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 10:09 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.