Quote:
Originally Posted by officedweller
Here's the floorplan for the mezzanine that'll use those lower support brackets.
I think they need to install some sort of barrier for overheights.
|
Jokes aside, it looks there is plenty of clearance, similar to, if not more than, Brentwood.
Overpasses built to MoTT’s current standard of 5.0m structure clearance aren’t the ones getting hit.