Quote:
Originally Posted by Nouvellecosse
Not sure where you heard that Eglinton East that it will worsen travel times. Can you share any details?
|
https://www.toronto.ca/legdocs/mmis/2019/ex/bgrd/backgroundfile-131528.pdf
This study was done before the BRT lanes were implemented too, so the LRT provides the same travel times as mixed-use traffic buses.. and now the buses have dedicated lanes, so they are actually faster.
The existing BRT lanes provide the same travel times or better, better frequencies, and cost several billion dollars less ($0!).
ION phase 2 is similar - the existing express bus, even without dedicated lanes through Cambridge, takes 35 minutes to get from Fairway to downtown Cambridge. The LRT extension, with a same average travel speed of phase 1, would take around 39 minutes. Imagine what BRT could do - probably more like 30 minutes!
The reality is that these types of lines are better with BRT services and taking those saved capital dollars and investing it in real rapid transit which will actually improve travel times.
This of course also ignores that the total travel time for LRT from Cambridge to Kitchener is going to be about an hour. It's too far of a distance with too slow of a technology to work well - that type of distance needs something more rapid transit focussed. perhaps a commuter rail type connection or something more like the O-Train in Ottawa.