This is from the provincial budget released yesterday:
Continue to improve the safety and flow of traffic
on the Perimeter Highway, with the finalization of
the North Perimeter Functional design study and
building on the South Perimeter Functional Study
-Construction of St. Mary’s Road Interchange is
near completion
-The PTH 3 (McGillivray Blvd) Interchange is
starting the final detailed design phase
-Initial planning is starting for the PTH 100 at St.
Anne’s Road interchange
(
https://www.manitoba.ca/asset_library/en/budget2025/budget2025.pdf)
It's good to see the government is still committed even though this has all been moving at a pretty leisurely pace. At this rate, the CMA will be over a million long before we have anything more than a few kms of freeway.