HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Business & the Economy


Reply

 
Thread Tools Display Modes
     
     
  #1341  
Old Posted Jul 30, 2025, 6:42 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,831
Quote:
Originally Posted by officedweller View Post
They had it listed as a Q1 2026 transfer to their rental portfolio in their annual report (Dec 2024)

Quote:
Allied and Westbank have a $150,000 construction lending facility for the 108 East 5th Avenue joint
arrangement from a syndicate of Canadian banks, in which Allied’s 50% share is $75,000. The loan
bears interest at prime plus 35 basis points or CORRA plus 135 basis points with a standby fee of 27 basis
points and a letter of credit fee of 100 basis points. These interest rates and the standby fee (other than
the letter of credit fee) are subject to variability based on the achievement of two distinct sustainability
performance targets. For each sustainability performance target achieved, the interest rate and standby
fee would decrease by 0.025% per annum and 0.005% per annum, respectively. In addition, if certain
sustainability minimums are not achieved, the interest rate and standby fee would increase by 0.025%
per annum and 0.005% per annum, respectively. Depending on the applicable sustainability performance
target or sustainability minimum, the settlement of these interest rate variations and the standby fee
occurs either annually or at the earlier of December 6, 2025, and the date the construction lending facility
is fully repaid. Allied exceeded one of the sustainability performance targets for 2023, resulting in a
0.025% reduction in the interest rate and a 0.005% reduction in the standby fee in each year. The second
sustainability performance target, which is a green building certification, is to be assessed upon completion
of the building. Allied has provided a joint and several guarantee of the entire facility and is earning a
related guarantee fee on up to $75,000 of the facility. On January 13, 2023, the 108 East 5th Avenue joint
arrangement entered into a swap agreement to fix approximately 75% of the construction loan up to $110,175
at 4.90%.
https://alliedreit.com/wp-content/uploads/2025/02/Allied_Q4AR_December-31-2024.pdf
Reply With Quote
     
     
  #1342  
Old Posted Jul 31, 2025, 2:38 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,831
Reply With Quote
     
     
  #1343  
Old Posted Jul 31, 2025, 3:58 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,831
(moved to 1166 West Pender thread)
Reply With Quote
     
     
  #1344  
Old Posted Jul 31, 2025, 4:38 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,814
Quote:
Originally Posted by jollyburger View Post
Tough site to redevelopment if shadows on the park are still a limiting factor.
Reply With Quote
     
     
  #1345  
Old Posted Jul 31, 2025, 4:52 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,831
Quote:
Originally Posted by officedweller View Post
Tough site to redevelopment if shadows on the park are still a limiting factor.
Seems like it's pretty much shadowed all the time from existing buildings.

Stack's shadowing study

https://vancouver.ca/docs/council/part20181217ag_4.pdf
Reply With Quote
     
     
  #1346  
Old Posted Jul 31, 2025, 4:56 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,814
1166 had to shave the corner off to eliminate shadows on the park
Reply With Quote
     
     
  #1347  
Old Posted Jul 31, 2025, 6:03 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,831
Quote:
Originally Posted by officedweller View Post
1166 had to shave the corner off to eliminate shadows on the park
I'm guessing the corner to West Hastings would be their biggest problem. And tower separation with the building next doo would be tough to build anything with a reasonable footprint outside of maybe strata condos.
Reply With Quote
     
     
  #1348  
Old Posted Aug 4, 2025, 11:43 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,831
University Canada West is dumping West Pender

https://www.collierscanada.com/en-ca/pro...r-street-vancouver-bc-v6b-1v9/can2016016

Sublease until 2033
Reply With Quote
     
     
  #1349  
Old Posted Aug 8, 2025, 6:45 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,831
Quote:
Allied has reached an agreement to buy out Westbank from the M4 building at 108 East 5th Ave. in Vancouver’s Mount Pleasant neighbourhood, which they currently co-own. Allied is paying $89.7 million for the 50 per cent stake and the deal is expected to close on Sept. 30.

The nine-storey building, which was completed earlier this year, has 166,800 square feet of office space, 38,000 square feet of industrial and retail space, and 21,400 square feet of outdoor space. It's 77 per cent leased to three users that are building out their spaces; rent collection is scheduled to start early in 2026.

“We're negotiating leases on the remaining space,” Williams said. “This includes a current user that's already looking to expand.”
Quote:
Allied is now finalizing a long-term lease for the remaining office space at 400 West Georgia with an established knowledge-based organization. It has leased 222 units at Toronto House and 12 more units at Calgary House have been leased.
https://renx.ca/allied-properties-ceo-improving-fundamentals-urban-cre
Reply With Quote
     
     
  #1350  
Old Posted Aug 20, 2025, 2:15 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,831
Quote:
Return-to-office mandates and brisk leasing at the high end of the market are breathing new life into the asset class, which saw low deal velocity during the height of the pandemic and the subsequent escalation of interest rates, he said.

“There are rumours, and there is a fair amount of office valuation activity happening. I think we will see more activity come the end of the summer, come September,” he said.

Leasing activity for premium offices is contributing to rising investment values and a greater willingness by lenders to finance deals such as West Pender Street, Emmott said.

“In Vancouver, the leasing market is actually extremely strong at the moment for the top-quality office,” he said.

“We are hearing from institutions that they are keen to buy again, and that is partly driven of course by the fact that banks are willing to lend money for those acquisitions,” he said.
Quote:
Emmot said it’s unclear what the cap rate—the measure of a property’s financial performance relative to its purchase price—will be on the deal.

“My understanding is that it’s in the high six-per-cent range,” he said.

Higher cap rates imply higher risk and reward, and lower cap rates imply safety and stable income.

Emmott said older, lower-grade office buildings face refurbishment, redevelopment or demolition, with residential conversion unlikely due to cost and code constraints.

“Soon, B and C-class buildings, some of them, will be in very little demand and landlords are definitely going to have to come up with solutions,” he said.
https://www.biv.com/news/real-estate/van...owntown-transaction-says-expert-11095887
Reply With Quote
     
     
  #1351  
Old Posted Aug 20, 2025, 11:53 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,831
Quote:
M4 OF MAIN ALLEY CAMPUS, 108 EAST FIFTH AVENUE, VANCOUVER
Mount Pleasant is a mixed-use, amenity-rich, urban neighbourhood in Vancouver. It has become a premiere office
node for knowledge-based organizations in downtown Vancouver over the past decade.
Main Alley Campus in the heart of Mount Pleasant was conceived and developed by Westbank and will consist
of five buildings. M1 is a two-storey office building owned by Westbank and a partner and located at 2015 Main
Street. M2 is an eight-storey office building now owned by San Francisco-based Spear Street and located at 114 East
4th Avenue. M3 is a three-storey office building with data-centre potential owned by Westbank and a partner and
located at 111 East 5th Avenue. M4 is a nine-storey office building with 204,000 square feet of GLA to be fully owned
by Allied by the end of the third quarter. M5 is a planned 25-storey mass timber rental tower on what is currently
the surface parking lot of M1. Further information on Main Alley Campus is available at www.mainalley.ca.
Netflix is the principal tenant of M4 with 110,600 square feet of workspace currently being built-out for active
occupancy. M4 is now 77% leased. Allied expects to finalize a lease-expansion agreement before closing that will
bring M4 to 90% leased, consistent with its overall outlook for leased area at the end of 2025. Rent from M4 is
scheduled to commence in early 2026.
https://alliedreit.com/wp-content/uploads/2025/08/PressRelease_August-18.pdf

Quote:
On July 25, 2025, Allied closed on the disposition of one investment property held for sale, 1220 Homer in
Vancouver, for gross proceeds of $13,250,000
https://alliedreit.com/wp-content/uploads/2025/07/Q2-2025-Quarterly-Report.pdf
Reply With Quote
     
     
  #1352  
Old Posted Oct 1, 2025, 5:49 PM
whatnext whatnext is offline
Registered User
 
Join Date: Feb 2009
Location: Vancouver
Posts: 28,148
Interesting, I thought the recent activity was indicative of a more robust office market.

Downtown Vancouver office vacancy hits a level the city hasn't seen in 21 years
Amir Ali
Oct 1 2025, 9:42 am

Much like the availability in the residential real estate market, office vacancy in Vancouver has reached levels not seen in 21 years.
According to the CBRE, overall office vacancy in downtown Vancouver rose to 12.6 per cent in Q3, the highest since 2004. Class A office vacancy in downtown Vancouver hit 9.5 per cent.

Suburban office vacancy rose to 10.1 per cent, and the total office vacancy across Metro Vancouver stood at 11.4 per cent....


https://dailyhive.com/vancouver/vancouver-office-vacancy-q3-2025
Reply With Quote
     
     
  #1353  
Old Posted Oct 1, 2025, 6:00 PM
GenWhy? GenWhy? is offline
Registered User
 
Join Date: Jun 2017
Posts: 4,860
More or less this:

"Lower quality Class B/C assets meanwhile continue to experience rising vacancy. The widening gap to Class A underscores tenant preferences for high-quality space."
Reply With Quote
     
     
  #1354  
Old Posted Oct 15, 2025, 6:03 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,831
Quote:
The introduction of two large sublease listings this
year - UCW’s 90,000 SF in B6 and TELUS’s 88,000 SF in
TELUS Garden - pushed vacancy upward, with
combined square footage totaling 21% of all sublease
availability in the Core. A substantial space of more
than 160,000 SF, rumored to hit the market by
Amazon, would further increase availability in the
coming quarter
Quote:
Teck Resources Bentall III / 595 Burrard Street Downtown New Deal 65,292
Netflix M4 / 110 East 5 Avenue Mount Pleasant New Deal 26,112
https://www.collierscanada.com/en-ca/research/vancouver-office-market-report-q3-2025

Teck is on the 12th/16th floors

https://www.naibc.ca/wp-content/uploads/2025/10/NAI_Vancouver-Office-Report_Q3-2025.pdf
Reply With Quote
     
     
  #1355  
Old Posted Oct 15, 2025, 6:30 PM
csbvan's Avatar
csbvan csbvan is online now
Registered User
 
Join Date: Aug 2013
Location: Vancouver
Posts: 3,341
Quote:
Originally Posted by GenWhy? View Post
More or less this:

"Lower quality Class B/C assets meanwhile continue to experience rising vacancy. The widening gap to Class A underscores tenant preferences for high-quality space."
Makes me think we might see a few more hotel conversions of smaller-footprint office buildings.
Reply With Quote
     
     
  #1356  
Old Posted Oct 15, 2025, 11:15 PM
urbanight93 urbanight93 is offline
Registered User
 
Join Date: Jan 2013
Posts: 253
I'm curious about why Telus would leave their flagship building. Any ideas? I had no idea they were in trouble?
Reply With Quote
     
     
  #1357  
Old Posted Oct 15, 2025, 11:36 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,831
Quote:
Originally Posted by urbanight93 View Post
I'm curious about why Telus would leave their flagship building. Any ideas? I had no idea they were in trouble?
They sold the building and they can go wherever they want. They leased a bunch of space in The Post for their health division.
Reply With Quote
     
     
  #1358  
Old Posted Oct 15, 2025, 11:46 PM
Changing City's Avatar
Changing City Changing City is offline
Registered User
 
Join Date: Nov 2016
Posts: 8,349
Quote:
Originally Posted by urbanight93 View Post
I'm curious about why Telus would leave their flagship building. Any ideas? I had no idea they were in trouble?
Telus and Westbank sold the office part of the building in 2018 for $600m - an offer they chose not to refuse. The corporate headquarters of Telus appears still to be on the 23rd floor.
Reply With Quote
     
     
  #1359  
Old Posted Oct 16, 2025, 3:39 AM
s211 s211 is offline
Registered User
 
Join Date: Oct 2008
Location: The People's Glorious Republic of ... Sigh...
Posts: 8,519
Quote:
Originally Posted by urbanight93 View Post
I'm curious about why Telus would leave their flagship building. Any ideas? I had no idea they were in trouble?
Telus has embraced remote work.
Reply With Quote
     
     
  #1360  
Old Posted Oct 20, 2025, 5:36 PM
whatnext whatnext is offline
Registered User
 
Join Date: Feb 2009
Location: Vancouver
Posts: 28,148
From DailyHive today:

Office vacancy rate in downtown Vancouver now highest since 2004
Kenneth Chan
Oct 20 2025

The last time downtown Vancouver’s leasable office vacancy rate was this high was 21 years ago, during the prolonged dot-com bubble burst.

According to a new market bulletin by commercial real estate firm CBRE, as of the end of the third quarter of 2025, the office vacancy rate in downtown Vancouver reached 12.6 per cent — a 0.7 per cent increase from 11.9 per cent in the second quarter of this year.

But with all things being relative, downtown Vancouver still has the lowest office vacancy rate among Canada’s major city centres ....


https://dailyhive.com/vancouver/vancouver-office-vacancy-rate-market-q3-2025
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Business & the Economy
Forum Jump



Forum Jump


All times are GMT. The time now is 6:30 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.