Tons of caternary work out in the west end. Looks close to complete from Moodie until Pinecrest. I wonder if they will send a train down the tracks this summer?

Any work down the Algonquin way?

Excited to see this completed!
Reply With Quote
     
     
  #3222  
Old Posted Jun 17, 2025, 12:41 PM
Jay31 Jay31 is offline
Registered User
 
Join Date: Jul 2022
Location: Ottawa
Posts: 74
According to this, all track work is complete and the focus is on the catenary (as you can see). I am guessing there is also still work to do on the signalling and control systems. The track looks largely complete, but there are a lot of empty fixtures that no doubt need to be completed. It's interesting that it looks most completed at the western end, and less so as you move toward the existing line 1.

It'd be interesting to see an insider view (not rail fan videos of what the average joe can see) of the underground tunnels and stations to see where they are at. Hopefully with a push this summer it will be largely completed by later this year apart from landscaping.

Here's a more detailed link to the recent update: https://pub-ottawa.escribemeetings.com/filestream.ashx?DocumentId=242308
Reply With Quote
     
     
  #3223  
Old Posted Jun 17, 2025, 3:15 PM
Spoonsy's Avatar
Spoonsy Spoonsy is offline
You call that a knife?
 
Join Date: Jul 2016
Location: Centretown West
Posts: 326
Quote:
Originally Posted by Jay31 View Post
According to this, all track work is complete and the focus is on the catenary (as you can see). I am guessing there is also still work to do on the signalling and control systems. The track looks largely complete, but there are a lot of empty fixtures that no doubt need to be completed. It's interesting that it looks most completed at the western end, and less so as you move toward the existing line 1.

It'd be interesting to see an insider view (not rail fan videos of what the average joe can see) of the underground tunnels and stations to see where they are at. Hopefully with a push this summer it will be largely completed by later this year apart from landscaping.

Here's a more detailed link to the recent update: https://pub-ottawa.escribemeetings.com/filestream.ashx?DocumentId=242308
there are a few pics that might scratch your itch (including one inside the cut-n-cover) in this slide deck dated June 12

https://timtierneyottawa.ca/wp-content/uploads/2025/06/5.3-EN-Stage-2-Update.pdf
Reply With Quote
     
     
  #3224  
Old Posted Jun 17, 2025, 3:47 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,064
Quote:
Originally Posted by Jay31 View Post
According to this, all track work is complete and the focus is on the catenary (as you can see). I am guessing there is also still work to do on the signalling and control systems. The track looks largely complete, but there are a lot of empty fixtures that no doubt need to be completed. It's interesting that it looks most completed at the western end, and less so as you move toward the existing line 1.

It'd be interesting to see an insider view (not rail fan videos of what the average joe can see) of the underground tunnels and stations to see where they are at. Hopefully with a push this summer it will be largely completed by later this year apart from landscaping.

Here's a more detailed link to the recent update: https://pub-ottawa.escribemeetings.com/filestream.ashx?DocumentId=242308
In order to maintain the Transitway as long as possible, they started the rebuild of the Scott trench pretty late (Westboro Station closed in June 2022), so that's why it's less complete.

Honestly, I find Stage 2 West looks far more complete today, two years before opening, than Line 2 was two years before opening (when it was supposed to open).
Reply With Quote
     
     
  #3225  
Old Posted Jun 17, 2025, 9:51 PM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,641
Had one of those new beauties out for a roll near Moodie this morning....I was driving so couldn't take a pic. Looking forward to seeing some real action on this stretch soon.
Reply With Quote
     
     
  #3226  
Old Posted Jun 18, 2025, 6:13 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,064
Quote:
Originally Posted by AuxTown View Post
Had one of those new beauties out for a roll near Moodie this morning....I was driving so couldn't take a pic. Looking forward to seeing some real action on this stretch soon.
A train on the move?
Reply With Quote
     
     
  #3227  
Old Posted Jun 18, 2025, 6:57 PM
Catenary Catenary is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,403
Quote:
Originally Posted by J.OT13 View Post
A train on the move?
It looks like there are trains parked in the storage building now. They weren't there on the weekend, so it is likely they were moving around site yesterday.
Reply With Quote
     
     
  #3228  
Old Posted Jun 18, 2025, 9:10 PM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,641
Quote:
Originally Posted by J.OT13 View Post
A train on the move?
Not moving....more just sitting there....

Reply With Quote
     
     
  #3229  
Old Posted Jun 20, 2025, 5:59 PM
Spoonsy's Avatar
Spoonsy Spoonsy is offline
You call that a knife?
 
Join Date: Jul 2016
Location: Centretown West
Posts: 326
https://www.octranspo.com/en/news/article/first-test-train-o-train-west-extension-june-2025

Quote:
We’ve hit a major milestone for the O-Train West Extension!

On June 17, a test train travelled on a short section of track west of Moodie Drive in the new Corkstown Yard Light Maintenance & Storage Facility (LMSF). This marks the first time a test train has travelled under its own power on the O-Train West Extension. Much like rolling out a red carpet, we treated this with the importance it deserved.
<snip - more at above link>
Reply With Quote
     
     
  #3230  
Old Posted Jul 21, 2025, 1:08 PM
sseguin sseguin is offline
Registered User
 
Join Date: Aug 2018
Posts: 317
Tracking the Progress: Ottawa’s O-Train Stage 2 Western Extension - July 2025


Rail Fans Canada takes you trackside for an in-depth update on Ottawa’s expanding LRT system. In this July 2025 video, we cover the latest construction progress on the O-Train Stage 2 West Extension, stretching from Tunney's Pasture to Algonquin (on Line 1) and to Moodie (on Line 3).

Get a close-up look at station construction, trackwork, and what’s coming next as this vital light rail extension moves closer to completion. Whether you’re following the city’s transit evolution or just love all things rail, this is your go-to update for the O-Train West Extension.

Video Link
__________________
Rail Fans Canada - https://www.RailFans.ca
Reply With Quote
     
     
  #3231  
Old Posted Jul 23, 2025, 12:37 PM
Jay31 Jay31 is offline
Registered User
 
Join Date: Jul 2022
Location: Ottawa
Posts: 74
That's a nice video showing how the track is largely complete now and they are getting started on the overhead wiring. I notice a lot of the control and signalling infrastructure is coming into place as well.

One concern I have - looking at Lincoln Fields, is that it still appears to be designed as a pure transfer station with no access to either the east or west (Lincoln Fields) neighbourhoods. I'm sure there'll be some way to get to it from Carling avenue, but the extra walking that adds always meant there were people crossing either the parkway or transitway unofficially to get to the station. One would hope they would correct that at some point, especially given that there are plans for transit oriented development on both sides. It seems silly having a major transit station nearby, and so little access to it for those that actually live near it.
Reply With Quote
     
     
  #3232  
Old Posted Jul 23, 2025, 1:09 PM
SkeggsEggs SkeggsEggs is offline
Registered User
 
Join Date: May 2016
Posts: 409
I imagine this is still current: https://www.baywardbulletin.ca/lrt-stage-2-lincoln-fields-connectivity-map/

one signalized intersection across the parkway
Reply With Quote
     
     
  #3233  
Old Posted Jul 23, 2025, 3:37 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,084
Quote:
Originally Posted by Jay31 View Post
It seems silly having a major transit station nearby, and so little access to it for those that actually live near it.
It's a constant source of frustration for me how our LRT route selection, station locations, and station positioning and orientation make using the system worse, the closer you live to it.

Suburbanites? Bussed to the door, and picked up there again.

Locals? Here's a circuitous route to a transit station in a highway median. If there's even a station at all (coughs in Jasmine Court).
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
Reply With Quote
     
     
  #3234  
Old Posted Jul 28, 2025, 1:26 PM
sseguin sseguin is offline
Registered User
 
Join Date: Aug 2018
Posts: 317
What's Next for the O-Train: Line 3 to Kanata Explained
Ottawa's Stage 2 LRT is expanding O-Train service further West from Tunney's Pasture to Moodie Station. However, this still falls short of directly servicing the growing community of Kanata. With plenty of questions surrounding what's next for the O-Train, we take a look at the proposed Stage 3 Extension into Kanata. From the planned routing, to the stations and locations, this is your full look at the currently proposed Line 3 expansion.

It is important to note that this plan is neither approved or funded, but has had extensive planning work done. Through review of the environmental assessments and project studies, we distill the most key information you need to know.

If this project is of interest to you and you would like to see it become a reality, reach out to your local councillor, MPP and MP to ask for their support to fund the O-Train Line 3 extension into Kanata.

Video Link
__________________
Rail Fans Canada - https://www.RailFans.ca
Reply With Quote
     
     
  #3235  
Old Posted Jul 28, 2025, 1:40 PM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,641
Great video! Super detailed look at the Kanata extension. I am glad to hear there is some consideration to phasing the expansion as Terry Fox would make a perfect terminus in the meantime given extensive connections to all of the local buses in Kanata.
Reply With Quote
     
     
  #3236  
Old Posted Jul 28, 2025, 2:10 PM
TransitZilla TransitZilla is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,800
Great video! Gives a great summary.

FYI, the display boards from the EA are still online: https://ottawa.ca/en/city-hall/public-en...ion-6706ad0c-854e-4457-84cc-3eb5085eb095

The March/Eagleson station will be a big game changer in Kanata to allow for fully integrated transfers between the east/west LRT and north/south bus routes. A bus loop is also planned here at the south end of Provincial Police Ln (see: https://documents.ottawa.ca/sites/default/files/kanata_lrt_poh2_bd15_16_en.pdf).
Reply With Quote
     
     
  #3237  
Old Posted Aug 4, 2025, 12:37 PM
sseguin sseguin is offline
Registered User
 
Join Date: Aug 2018
Posts: 317
What's Next for the O-Train: Line 1 to Barrhaven Explained
Ottawa's Stage 2 LRT is expanding O-Train service further West from Tunney's Pasture to Algonquin Station (Baseline). However, this still falls short of directly servicing the growing community of Barrhaven. With plenty of questions surrounding what's next for the O-Train, we take a look at the proposed Stage 3 Extension into Barrhaven. From the planned routing, to the stations and locations, this is your full look at the currently proposed Line 1 expansion.
Video Link
__________________
Rail Fans Canada - https://www.RailFans.ca
Reply With Quote
     
     
  #3238  
Old Posted Aug 14, 2025, 1:29 AM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,693
I was riding my bike out along the line today and it looks like they have catenary wire running from both Moodie and Algonquin all the way to just before Lincoln Fields where they were actively putting them up. I'm assuming the tunnel portion probably will use solid bars, so most of the wire is already up. Looking forward to seeing test runs by the end of the year.
Reply With Quote
     
     
  #3239  
Old Posted Aug 14, 2025, 1:14 PM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,641
I think up until now the train sets have been in the maintenance/inspection building at Corkstown. Yesterday, though, I saw at least one in the storage building. Looking forward to seeing testing down this section soon!


from: https://www.octranspo.com/en/news/articl...t-maintenance-and-storage-facility-lmsf/

So close to Kanata....
Reply With Quote
     
     
  #3240  
Old Posted Aug 14, 2025, 2:47 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,693
One thing I don't hear much about is the supposed occasional platform for events at Wesley Clover Park. What will it be called and how will they schedule runs to it? It seems only long enough for a single set. I imagine they'll only do runs from Lincoln Fields and back. Line 3X?

Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 8:43 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.