Quote:
Originally Posted by gecho111
Got some shots of the Grand Coulee #1 exit work. Too big to get an overhead downward looking shot. Might be another month of dirt work before the final layout starts to emerge. Looking like an inner oval to decelerate and reverse direction, re-accelerate and move over to the exit. Possibly planning to divert traffic onto the new part before modifying the existing highway. Maybe they'll move the entrance to that farm yard on the other side. https://www.flickr.com/photos/regina...7720325409071/
The canola fields reek of roundup this time of year. Thinking about stuff that's too big to get in a shot I remembered there is an optional wide angle lens for the drone that gives it a fixed zoom of 0.67 increasing the view area by 25%. I'll see if I can track one down as the ones for the mini 3 are out of production.
|
Is this going to be a full long interchange?