HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


Reply

 
Thread Tools Display Modes
     
     
  #901  
Old Posted Jul 14, 2025, 4:15 PM
ColdRain&Snow's Avatar
ColdRain&Snow ColdRain&Snow is offline
Registered User
 
Join Date: Apr 2023
Location: Winnipeg
Posts: 1,586
The appeal was approved meaning that the project can proceed with the 16-story design.
Reply With Quote
     
     
  #902  
Old Posted Jul 14, 2025, 4:27 PM
Mr Tall Forehead's Avatar
Mr Tall Forehead Mr Tall Forehead is offline
Registered User
 
Join Date: Jul 2024
Location: Winnipeg
Posts: 909
Great news! This will be such an excellent project for the area.

Honestly, Heritage Winnipeg really needs to start picking their battles. They have an important mandate but people will tune them out when they scream 'the sky is falling' over every freaking development proposal.
Reply With Quote
     
     
  #903  
Old Posted Jul 14, 2025, 5:36 PM
WinCitySparky's Avatar
WinCitySparky WinCitySparky is offline
Registered User
 
Join Date: Jan 2019
Posts: 2,416
I for one have lost faith in them after this episode.

Their equally weak response to the ongoing St Charles debacle has only reinforced this.
Reply With Quote
     
     
  #904  
Old Posted Jul 14, 2025, 5:41 PM
pspeid's Avatar
pspeid pspeid is offline
Registered User
 
Join Date: Aug 2018
Posts: 2,651
Quote:
Originally Posted by Mr Tall Forehead View Post
Great news! This will be such an excellent project for the area.

Honestly, Heritage Winnipeg really needs to start picking their battles. They have an important mandate but people will tune them out when they scream 'the sky is falling' over every freaking development proposal.
How are people selected for the Heritage Winnipeg body that vets these projects?
Reply With Quote
     
     
  #905  
Old Posted Jul 14, 2025, 5:50 PM
trueviking's Avatar
trueviking trueviking is offline
surely you agree with me
 
Join Date: Sep 2004
Location: winnipeg
Posts: 15,081
I’m in Europe but I heard heritage Winnipeg was a beauty. She really doesn’t know when to pick her battles. Great news that it passed.
Reply With Quote
     
     
  #906  
Old Posted Jul 14, 2025, 5:57 PM
WinCitySparky's Avatar
WinCitySparky WinCitySparky is offline
Registered User
 
Join Date: Jan 2019
Posts: 2,416
I’m also in Europe.

Lisbon Portugal to be precise.

Enjoy your holiday!
Reply With Quote
     
     
  #907  
Old Posted Jul 14, 2025, 6:01 PM
trueviking's Avatar
trueviking trueviking is offline
surely you agree with me
 
Join Date: Sep 2004
Location: winnipeg
Posts: 15,081
Nice. Love Lisbon. Just UK and Ireland for me.
Reply With Quote
     
     
  #908  
Old Posted Jul 14, 2025, 10:03 PM
Malcsta's Avatar
Malcsta Malcsta is offline
Incurable optimist
 
Join Date: Apr 2020
Location: Winnipeg
Posts: 279
Great news. I'm sure its been asked prior, but will they get shovels in the ground before market lands south finishes, or will they wait ?
Reply With Quote
     
     
  #909  
Old Posted Jul 14, 2025, 10:21 PM
Wpg_Guy's Avatar
Wpg_Guy Wpg_Guy is online now
Moderator
 
Join Date: Aug 2002
Location: Winnipeg, Manitoba
Posts: 8,625
Quote:
Originally Posted by Malcsta View Post
Great news. I'm sure its been asked prior, but will they get shovels in the ground before market lands south finishes, or will they wait ?
They should have their building permits by the fall.
Reply With Quote
     
     
  #910  
Old Posted Jul 14, 2025, 11:26 PM
Wpg_Guy's Avatar
Wpg_Guy Wpg_Guy is online now
Moderator
 
Join Date: Aug 2002
Location: Winnipeg, Manitoba
Posts: 8,625
Quote:
Exchange District tower approved for 16 storeys despite heritage concerns
By: Joyanne Pursaga
Monday, Jul. 14, 2025

One of the buildings in a prominent housing project will soar above the Exchange District’s normal height limit, after a city committee decided its promise of new and affordable homes outweighs heritage concerns.

On Monday, council’s property and development committee granted an appeal to allow a 16-storey, 51-metre (168-foot) tower, as part of the second phase of the Market Lands project. The decision is final.

City planners recommended the project be capped to the standard height limit of 30 metres (100 feet) to help maintain the historic character of the area, which the developer appealed.



“I hear what the historic buildings community is saying. I want to be respectful of that. But, at the end of the day, we don’t have many opportunities, where essentially there’s a greenfield site (where the former Public Safety Building was demolished) in the downtown area. I think we need to use it to its full potential,” said Coun. Evan Duncan (Charleswood-Tuxedo-Westwood), chairman of the committee.

During Monday’s meeting, a heritage advocate said the height limit should be followed to protect historic structures around it.

“Visually, (this property) is absolutely a part of the (Exchange District) national historic site… The national historic site visually doesn’t stop. There is no boundary that people can see,” said Cindy Tugwell, executive director of Heritage Winnipeg.

While the Market Lands property, at 148-150 King St., is technically not part of that heritage site, it is close enough that development decisions should reflect that proximity, said Tugwell.

The proposed plan calls for two key buildings, including: the 16-storey tower with 148 residential units, amenity and commercial space; and a building that varies from four- to six-storeys with 126 residential units, amenity space, a daycare, offices and a rooftop green space.

Imposing the lower height limit would force the removal of dozens of housing units from the project, put its housing grants at risk and jeopardize its financing, a proponent said.

“This single (height) variance is critical to unlocking the affordable housing, community services and public realm benefits… The 100-foot cap on our tower removes six of the 16 storeys, which is approximately 60 apartments at a time when we need them most,” said Daneeka Abon, portfolio manager of design and construction for developer UWCRC 2.0 Inc.

Abon noted the housing units with market rents will help pay for those with reduced rents.

“Losing these homes would breach our funding agreements, including the city’s housing accelerator fund capital grant incentive, and threatens the project’s long-term viability,” she said.

The taller building will include 61 affordable units, with another 52 low-income units in the shorter structure. All of the affordable units will rent for no more than 59 per cent of the area’s median market rate, with provincial support being sought to further reduce rents.

Greg Hasiuk, a partner with Number TEN Architectural Group, said seeking two 100-foot tall buildings instead was not a feasible alternative.

Hasiuk said the mixed heights of the two buildings “allows us to sculpt the site to respond to its neighbours,” preventing excessive shadows and obstructed views. Expanding the smaller building to reach seven or more storeys would also create new costs due to the need to meet additional building code requirements, he said.

In a July 11 letter to the property and development committee, Mayor Scott Gillingham shared his support for the housing development at the full proposed height.

“This project will produce a significant injection of affordable housing to the neighbourhood; and the new housing will result in much-needed social and additional commercial activity that will, in turn, support businesses,” wrote Gillingham.

In addition, the committee voted to uphold an order that the owner maintain, secure and clean up the former Vulcan Iron Works property, a Point Douglas site that has repeatedly been hit by fires since 2023. While an appeal of the order was partly denied, councillors added an amendment that would allow possible deadline extensions for the work, if needed.

The owner will be able to submit an alternative 24-hour security plan to the city, which could adjust requirements to conduct a round-the-clock “fire watch.”
Winnipeg Free Press
Reply With Quote
     
     
  #911  
Old Posted Jul 15, 2025, 2:47 AM
ColdRain&Snow's Avatar
ColdRain&Snow ColdRain&Snow is offline
Registered User
 
Join Date: Apr 2023
Location: Winnipeg
Posts: 1,586
The 100 ft height limit should only apply to properties within the National Historic District. The fact that the height limit also applies in Chinatown is ridiculous.
Reply With Quote
     
     
  #912  
Old Posted Jul 15, 2025, 3:25 PM
drew's Avatar
drew drew is online now
the first stamp is free
 
Join Date: Feb 2004
Location: Hippyville, Winnipeg
Posts: 8,930
^ to be fair, up until recently I don't think there has been much development pressure on this 100-foot limit anytime within the last several decades. Hopefully that is starting to change in this City.

That being said, I am personally not a fan of arbitrary height limits anywhere in this city - including the Exchange.
Reply With Quote
     
     
  #913  
Old Posted Jul 15, 2025, 3:33 PM
neutroniks neutroniks is offline
Registered User
 
Join Date: Nov 2022
Posts: 1,132
Quote:
Originally Posted by ColdRain&Snow View Post
The 100 ft height limit should only apply to properties within the National Historic District. The fact that the height limit also applies in Chinatown is ridiculous.
Honestly, Chinatown shouldn't have any restrictions on it. Then the in-development Shanghai Tower could actually be, A Tower LOL
Reply With Quote
     
     
  #914  
Old Posted Jul 15, 2025, 8:05 PM
Biff's Avatar
Biff Biff is online now
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 9,938
Quote:
Originally Posted by WinCitySparky View Post
I’m also in Europe.

Lisbon Portugal to be precise.

Enjoy your holiday!
We were just in Lisbon and Porto a month ago. If you like Chicken, you have to try Bonjardim close to Rossio Station and for a Bifana try O Trevo - by the Baixa-Chiado station (loved by Anthony Bourdain).
Reply With Quote
     
     
  #915  
Old Posted Jul 16, 2025, 5:17 PM
WinCitySparky's Avatar
WinCitySparky WinCitySparky is offline
Registered User
 
Join Date: Jan 2019
Posts: 2,416
Thanks for the recommends, we’re in the Castelo Blanco region now for a weeklong festival event but back in Lisbon at the end for a few days and will check at least one of them out!
Reply With Quote
     
     
  #916  
Old Posted Jul 16, 2025, 6:00 PM
wags_in_the_peg's Avatar
wags_in_the_peg wags_in_the_peg is offline
Registered User
 
Join Date: Oct 2006
Location: Winnipeg, MB
Posts: 3,864
is that image above even accurate? I'm looking at the Marketlands phase 1 under construction and I see nothing like that. Currently there a 9 story beside a 3 story
Reply With Quote
     
     
  #917  
Old Posted Jul 16, 2025, 6:16 PM
Biff's Avatar
Biff Biff is online now
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 9,938
The render is accurate. you are looking at it like you are above City Hall looking towards RRC.
Reply With Quote
     
     
  #918  
Old Posted Jul 16, 2025, 7:55 PM
bon_vivant bon_vivant is offline
Registered User
 
Join Date: Apr 2024
Posts: 481
Quote:
Originally Posted by Wpg_Guy View Post
Great news. I appreciate the purpose of Heritage Winnipeg but sometimes they can be 'anti-progress' Winnipeg. We need housing and this is actually a good-looking project that fits into the area nicely. Strange how they can just waltz in and expect architects to lop off a few stories after the building has already been designed. Have they not been aware of this project from the beginning? Weird.
Reply With Quote
     
     
  #919  
Old Posted Jul 16, 2025, 8:43 PM
wags_in_the_peg's Avatar
wags_in_the_peg wags_in_the_peg is offline
Registered User
 
Join Date: Oct 2006
Location: Winnipeg, MB
Posts: 3,864
Quote:
Originally Posted by Biff View Post
The render is accurate. you are looking at it like you are above City Hall looking towards RRC.
oh so the white building to the left is what's currently under construction. I thought all these buildings were 1, they are split up
Reply With Quote
     
     
  #920  
Old Posted Jul 16, 2025, 8:49 PM
Wpg_Guy's Avatar
Wpg_Guy Wpg_Guy is online now
Moderator
 
Join Date: Aug 2002
Location: Winnipeg, Manitoba
Posts: 8,625
Quote:
Originally Posted by wags_in_the_peg View Post
oh so the white building to the left is what's currently under construction. I thought all these buildings were 1, they are split up
Yes to the left is phase 1, 3 storey art cube and the 9 floor residential building.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 4:35 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.