It's wild to me that the "rural voices" claiming that RCUT isn't safe enough have been treated seriously. There's absolutely no evidence about RCUT being unsafe.

If the province decides to build an overpass for them for $100M or whatever it is, just wait until everyone goes nuts demanding the same for the intersections with 83, 21, 10, 12, 11 and 44.

Why do we even bother hiring engineers for design studies if we're going to ignore them and throw their work in the bin?

Reply With Quote
     
     
  #3022  
Old Posted Jul 12, 2025, 1:20 AM
Carboy15's Avatar
Carboy15 Carboy15 is online now
CanAutoroute1
 
Join Date: Oct 2022
Location: Centerville of Canada
Posts: 602
https://maps.app.goo.gl/VoNjk4aUkCzD6aZg8?g_st=ic

Solution to Carberry somewhere in North Dakota LOL
Reply With Quote
     
     
  #3023  
Old Posted Jul 12, 2025, 4:40 AM
BlackDog204's Avatar
BlackDog204 BlackDog204 is online now
Registered User
 
Join Date: Oct 2020
Location: west
Posts: 3,337
Quote:
Originally Posted by Carboy15 View Post
https://maps.app.goo.gl/VoNjk4aUkCzD6aZg8?g_st=ic

Solution to Carberry somewhere in North Dakota LOL

Waste of money.

While the accident on PTH 5 and the Trans Canada was tragic, there are bigger priorities, where the Province can build an overpass (i.e. Yellowhead/TCH).
Reply With Quote
     
     
  #3024  
Old Posted Jul 12, 2025, 4:56 AM
Carboy15's Avatar
Carboy15 Carboy15 is online now
CanAutoroute1
 
Join Date: Oct 2022
Location: Centerville of Canada
Posts: 602
Quote:
Originally Posted by BlackDog204 View Post
Waste of money.

While the accident on PTH 5 and the Trans Canada was tragic, there are bigger priorities, where the Province can build an overpass (i.e. Yellowhead/TCH).
For sure Highway 1 & 16 needs an interchange. But Highway 1 & 5 still needs an interchange too. Not to mention it is probably cheaper to build an Interchange in Carberry because all that's needed is just a small diamond. Highway 1 & 16 would need a cloverleaf or Parclo, along with a railway overpass in one Interchange.
Reply With Quote
     
     
  #3025  
Old Posted Jul 12, 2025, 3:12 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,333
Display variable messages? Haha. Weather, accidents, construction. The ones on the Perimeter will likely get most use to display traffic conditions.
Reply With Quote
     
     
  #3026  
Old Posted Jul 12, 2025, 3:15 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,333
The comment from the Province regarding pth 1 and pth 5. Not enough traffic to warrant an interchange. So they've focused their lense away from the social aspect ( the big accident) to data based aspect. I'm still at the do nothing approach and focus efforts on the higher priority locations.

They're also clearly not focusing at all on the larger aspect of #1 being limited access to any extent. Just purely on conditions at specific locations based on traffic data. So maybe the prioritize the 5 or 6 locations on pth 1 west that have traffic lights and reduced speeds, and knock them off one by one with overpasses. The province can afford the 10 or 20 million needed per year to do this.
Reply With Quote
     
     
  #3027  
Old Posted Jul 12, 2025, 4:24 PM
dennis dennis is offline
Registered User
 
Join Date: Sep 2003
Location: Winnipeg
Posts: 1,334
Quote:
Originally Posted by bomberjet View Post
The comment from the Province regarding pth 1 and pth 5. Not enough traffic to warrant an interchange. So they've focused their lense away from the social aspect ( the big accident) to data based aspect. I'm still at the do nothing approach and focus efforts on the higher priority locations.

They're also clearly not focusing at all on the larger aspect of #1 being limited access to any extent. Just purely on conditions at specific locations based on traffic data. So maybe the prioritize the 5 or 6 locations on pth 1 west that have traffic lights and reduced speeds, and knock them off one by one with overpasses. The province can afford the 10 or 20 million needed per year to do this.
Those rural interchanges used on limited access highways are low cost and suitable. That is if your goal is to have a limited access highway. That seems to be what most places use, especially in low traffic areas.
Reply With Quote
     
     
  #3028  
Old Posted Jul 12, 2025, 4:49 PM
Hockey Hockey is offline
Registered User
 
Join Date: May 2016
Posts: 103
Quote:
Originally Posted by Winnipeg Grump View Post

With the overpass reinstated among MTI’s proposed options, and given the province’s commitment to delivering a solution that garners public trust—combined with strong local support for the overpass—the direction seems clear. MTI has officially rejected the RCUT design, which had previously been favored over alternatives like median widening and a roundabout. Now, with the province actively pursuing an alternate design, all signs point to the overpass being the chosen solution.

Whether it actually gets built will depend on factors like budget constraints, political timing, and upcoming elections. That said, the political timing is ripe, the premier has a high approval rating, and the estimated cost of $80MM would be spread over 4 or 5 fiscal year budgets. Not to mention the the TCH is on MBs nation building project list (unapproved)

Last edited by Hockey; Jul 12, 2025 at 5:10 PM.
Reply With Quote
     
     
  #3029  
Old Posted Jul 12, 2025, 6:03 PM
Mr Tall Forehead's Avatar
Mr Tall Forehead Mr Tall Forehead is online now
Registered User
 
Join Date: Jul 2024
Location: Winnipeg
Posts: 888
Quote:
Originally Posted by Hockey View Post
With the overpass reinstated among MTI’s proposed options, and given the province’s commitment to delivering a solution that garners public trust—combined with strong local support for the overpass—the direction seems clear. MTI has officially rejected the RCUT design, which had previously been favored over alternatives like median widening and a roundabout. Now, with the province actively pursuing an alternate design, all signs point to the overpass being the chosen solution.

Whether it actually gets built will depend on factors like budget constraints, political timing, and upcoming elections. That said, the political timing is ripe, the premier has a high approval rating, and the estimated cost of $80MM would be spread over 4 or 5 fiscal year budgets. Not to mention the the TCH is on MBs nation building project list (unapproved)
To clarify, MTI (professional) recommended the RCUT and the provincial government (elected) rejected the idea based on public pushback. Fair enough.

What will happen now is that in about a half year, the government will state that the long term solution is an interchange but as an interim step ‘while we budget for the interchange’ traffic lights will be installed. Again, fair enough.

The interchange will be referenced every five years in long range improvement plans but those traffic lights will end up being there for three or four decades while the government (professional and elected) focus on building interchanges at the 20-30 intersections along PTH 1, 75 and the Perimeter that more urgently warrant one. Again, fair enough.
Reply With Quote
     
     
  #3030  
Old Posted Jul 12, 2025, 11:25 PM
WildCake WildCake is offline
Registered User
 
Join Date: May 2016
Posts: 1,069
Quote:
Originally Posted by bomberjet View Post
The comment from the Province regarding pth 1 and pth 5. Not enough traffic to warrant an interchange. So they've focused their lense away from the social aspect ( the big accident) to data based aspect. I'm still at the do nothing approach and focus efforts on the higher priority locations.
Agreed, much bigger fish to fry. I was, however, of the mindset that if the province was insistent on doing something with this intersection beyond the marginal safety improvements already implemented, that it was interchange or bust. I'm tired of half-measures that cost sizeable fractions of doing it right the first time.

Quote:
Originally Posted by bomberjet View Post
They're also clearly not focusing at all on the larger aspect of #1 being limited access to any extent. Just purely on conditions at specific locations based on traffic data. So maybe the prioritize the 5 or 6 locations on pth 1 west that have traffic lights and reduced speeds, and knock them off one by one with overpasses. The province can afford the 10 or 20 million needed per year to do this.
I don't think we can even have a conversation about getting the 400km or so of TCH limited access when the Perimeter isn't anywhere close to that. Yes, keep prioritizing all provincial highway intersections by need (traffic, collisions, collision severity, regional importance), but that basically puts most of the Perimeter intersections ahead of everything else.

And unfortunately I don't think we can keep assuming 10-20 mil per intersection is going to cut it anymore. Clearly WSP thinks a diamond here is in the 100 mil range, and the 3 on the Perimeter (St Mary's, St Anne's, and Oak Bluff) are all clocking in at 135-150 mil. Unless there's serious corruption that needs to be investigated, it might be a reality of highway construction in our province.

The Province does have in mind road closures as they implement interchanges though. The TCH/Pth 5 drawings had closures marked at the next east and west mile roads on the TCH.
Reply With Quote
     
     
  #3031  
Old Posted Jul 15, 2025, 4:17 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,333
Never in my life will the tch in manitoba be a freeway.

What i was meaning is that they could pick away at the key locations with a similar program as they're doing on the Perimeter. Virden, Brandon, Carberry, PTH 16 and Elie. Those are all the locations on PTH 1W that have lights or slowdown. Brandon is at some stage of planning and is on the short term planning lost. The rest could be basic diamonds.

They don't need the full st Mary's treatment woth mega highway work. They can just build an overpass of the highway and add the ramps.

I keep going in circles on this I know..
Reply With Quote
     
     
  #3032  
Old Posted Jul 15, 2025, 6:43 PM
Winnipeg Grump's Avatar
Winnipeg Grump Winnipeg Grump is offline
Registered User
 
Join Date: Nov 2015
Location: Winnipeg
Posts: 699
Quote:
Originally Posted by bomberjet View Post
Never in my life will the tch in manitoba be a freeway.

What i was meaning is that they could pick away at the key locations with a similar program as they're doing on the Perimeter. Virden, Brandon, Carberry, PTH 16 and Elie. Those are all the locations on PTH 1W that have lights or slowdown. Brandon is at some stage of planning and is on the short term planning lost. The rest could be basic diamonds.

They don't need the full st Mary's treatment woth mega highway work. They can just build an overpass of the highway and add the ramps.

I keep going in circles on this I know..
I swear there needs to be some organized campaign on this nonsense. Force to province to come out with justifications why other jurisdictions around us can do a simple highway overpass for less than half of what we get told it will cost.

As Biff, and others, have stated in the past, you could come out with a 20 year timeline of projects, lay out what is going to be built when, so the industry can bank on that work coming. And the public knows what direction we're going with the long-term work to get key highways up to a proper standard.
Reply With Quote
     
     
  #3033  
Old Posted Jul 16, 2025, 4:12 PM
rivercity rivercity is offline
Registered User
 
Join Date: Mar 2018
Location: Winnipeg
Posts: 276
I see in MTI's assignment schedule that they have two interesting highway twinning projects on the list for studies:

-Functional design for twinning of PTH 15 between Perimeter and Dugald (scheduled for advertisement October)
-Functional design and Owner Engineer for for twinning of TCH through Whiteshell (scheduled for advertisement November)
Reply With Quote
     
     
  #3034  
Old Posted Jul 16, 2025, 7:27 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,333
Those 2 projects are listed in their short term projects list. I thought they were doing the functional design for1E Whiteshell twinning lmao.. they're just spitballing routes I guess.

The PTH 15 twinning thing may play into the Periamayer highway stuff as they need to add a second floodway bridge for the interchnage. Dugald twinning inside the city is on the long term future project list per the latest master plan from CoW. So they may have this sort of odd aramgement of twinned, untwinned, then twinned again.
Reply With Quote
     
     
  #3035  
Old Posted Jul 24, 2025, 9:49 PM
KnickKnack KnickKnack is offline
Registered User
 
Join Date: Apr 2024
Posts: 108
Quote:
Originally Posted by bomberjet View Post
Those 2 projects are listed in their short term projects list. I thought they were doing the functional design for1E Whiteshell twinning lmao.. they're just spitballing routes I guess.

The PTH 15 twinning thing may play into the Periamayer highway stuff as they need to add a second floodway bridge for the interchnage. Dugald twinning inside the city is on the long term future project list per the latest master plan from CoW. So they may have this sort of odd aramgement of twinned, untwinned, then twinned again.
What they’re doing in the 1 now is the “conceptual” design. Based on the last update I can find on the MTI website it would end this fall. I guess they’ll roll right into the functional design after that.

Re the 15 if they’re twinning that relatively soon I hope we get the interchange at 101 at the same time. Seems to make sense to combine those two… I guess we’ll see when the tender comes out?
Reply With Quote
     
     
  #3036  
Old Posted Jul 25, 2025, 12:24 AM
bryan_ca bryan_ca is offline
Registered User
 
Join Date: Sep 2022
Posts: 32
From today's Freep: http://https://www.winnipegfreepress.com...ld-be-wiped-out-by-trans-canada-twinning

This is just a lack of planning par excellence. This is the only major connection to Ontario and by extension to Eastern Canada. Did they think it would be a two-lane road forever? It's like a single point of failure waiting for something to happen (if you discount going through another country and PR 312 and Freedom Road).
Reply With Quote
     
     
  #3037  
Old Posted Jul 25, 2025, 5:41 AM
craner's Avatar
craner craner is offline
Go Tall or Go Home
 
Join Date: Mar 2007
Location: Calgary
Posts: 7,407
^ Link is not working for me but what are they complaining about - loss of business ?
Reply With Quote
     
     
  #3038  
Old Posted Jul 25, 2025, 11:49 AM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,682
https://www.winnipegfreepress.com/breaki...ld-be-wiped-out-by-trans-canada-twinning
There’s a paywall but the title may give you an idea.
I am checking the map. The current twinned portion actually ends at a strategic spot, so that a completely new alignment to the north of the ranch (and north of Barren Lake) is doable.
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
Reply With Quote
     
     
  #3039  
Old Posted Jul 25, 2025, 1:41 PM
TimeFadesAway TimeFadesAway is offline
Registered User
 
Join Date: Apr 2015
Posts: 775
Quote:
Originally Posted by bryan_ca View Post
From today's Freep: http://https://www.winnipegfreepress.com...ld-be-wiped-out-by-trans-canada-twinning

This is just a lack of planning par excellence. This is the only major connection to Ontario and by extension to Eastern Canada. Did they think it would be a two-lane road forever? It's like a single point of failure waiting for something to happen (if you discount going through another country and PR 312 and Freedom Road).
The crazy thing about all of this is when I was working out at West Hawk in the early '90s, there was public consultation about twinning and several conceptual designs were presented. But let's study it again.
Reply With Quote
     
     
  #3040  
Old Posted Jul 25, 2025, 1:48 PM
Biff's Avatar
Biff Biff is offline
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 9,919
I can't imagine that (aqua coloured line) would be more cost effective then just expropriating a couple of cottages on Barren lake. Building a brand new 4 lane bridge over the middle of a lake would most certainly be more expensive then buying maybe 2 cottages and using some fill to create 2 new lanes north of the existing highway alignment.

I can understand that the owners of the ranch are not happy with the potential alignments proposed, but sometimes the value to the masses outweighs the value to the one.

I think the simplest solution here is the best solution...and likely the most cost effective. Expropriate what is needed and just add the extra lanes along the existing alignment and get it done.

__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 4:36 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.