Post-UDRP Update (May 2025)
A requirement of the application was to attend the Urban Design Review Panel (UDRP). The applications were presented to the UDRP on June 7th. As a result of the UDRP recommendations, the demonstration plan has been revised as follows:
- Rotated Building B2 to locate the potential pops on the east side of the building;
- Staggered the podium heights of Building C2 and D1 to create a “campus edge”;
- Increased the building separation between Building B2 and Building B3 to 31 metres to match the northsouth building separation of the buildings to the east;
- Extended the proposed public road south to improve access to Building D1 and D2; and
- Relocated density to the podium of Building B3.
In addition to updating the Demonstration Plan to reflect the UDRP recommendations, the Demonstration Plan along with the Plan of Subdivision have been updated to reflect minor changes to the hazard line. These changes were confirmed through site visits and field work during the spring and summer of 2024.
11034936 Canada Inc. has continued to be involved in conversations with the abutting landowner, Collège La Cité, regarding the future multi-use pathway that will connect the subject property to the Trim O-Train station.