HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Metro Vancouver & the Fraser Valley


Reply

 
Thread Tools Display Modes
     
     
  #981  
Old Posted Dec 31, 2024, 9:59 PM
Lexus's Avatar
Lexus Lexus is online now
Registered User
 
Join Date: Jul 2018
Posts: 2,723
2024, Dec 31

Untitled by Lexus LX, on Flickr

Untitled by Lexus LX, on Flickr

Untitled by Lexus LX, on Flickr

Untitled by Lexus LX, on Flickr
Reply With Quote
     
     
  #982  
Old Posted Jan 18, 2025, 10:18 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,532
Foundation pour from a few days ago

https://www.instagram.com/p/DExUSIhPLGV/
Reply With Quote
     
     
  #983  
Old Posted Jan 23, 2025, 9:56 PM
Lexus's Avatar
Lexus Lexus is online now
Registered User
 
Join Date: Jul 2018
Posts: 2,723
2025, Jan 23

A lot going on, plus additional 4th crane have been installed.

Untitled by Lexus LX, on Flickr

Untitled by Lexus LX, on Flickr

Untitled by Lexus LX, on Flickr

Untitled by Lexus LX, on Flickr
Reply With Quote
     
     
  #984  
Old Posted Jan 24, 2025, 12:59 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,454
I'm curious what the interface will be to the grass and drive of the Concord Brentwood project to the north?
Maybe a garage entrance - but the rest might be blank wall (like the south side of Concord Brentwood?)
Reply With Quote
     
     
  #985  
Old Posted Jan 24, 2025, 1:18 AM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,532
Quote:
Originally Posted by officedweller View Post
I'm curious what the interface will be to the grass and drive of the Concord Brentwood project to the north?
Maybe a garage entrance - but the rest might be blank wall (like the south side of Concord Brentwood?)
There aren't any super clear renderings of that area. I assume it's a shared podium lobby going to each building (like with the first phase). It looks like there will be a parkade entrance right when you come off that roundabout but I assume there's some lobby/pickup point as well.

https://www.concordbrentwood.com/images/asset/sitemap.webp

Actually these IG reels of the model shows more detail. The editing is horrible so you need to pause to see the model.



https://www.instagram.com/bakerwest_josie/reel/CkHf9C_J8_g/
Reply With Quote
     
     
  #986  
Old Posted Jan 24, 2025, 1:32 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,454
Thanks.
The side shown in the video is just the side facing the traffic circle.
Reply With Quote
     
     
  #987  
Old Posted Feb 8, 2025, 7:19 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,454
Came across an old site plan for Concord Brentwood and compared it to the current plan.
The "Parkside" phase changed from 4 towers to 5, and shifted slightly to the south, narrowing the parkspace a bit.

OLD Plan:

https://www.urbanyvr.com/wp-content/uploads/2016/06/Map-of-development-Concord-Brentwood.jpg

CURRENT plan:

https://www.concordpacific.com/project/circle/
Reply With Quote
     
     
  #988  
Old Posted Feb 8, 2025, 8:02 AM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,532
I don't think they lost park space but they seem to be building right against most of the boundaries of the site. Before there was a buffer that made the park seem larger.

2015

Quote:
The proposed park area measures approximately 4.1 hectares (10.13 acres), which is to be added to the 1.29 hectares (3.19 acres) currently within City ownership. The result will be a total park area of approximately 5.39 hectares (13.32 acres).
https://pub-burnaby.escribemeetings.com/filestream.ashx?DocumentId=32143

The Burnaby Now article says it's 13.2 acres so maybe a slight reduction.

https://www.burnabynow.com/local-news/ne...mes-coming-to-burnabys-brentwood-8637619



Reply With Quote
     
     
  #989  
Old Posted Feb 14, 2025, 10:20 PM
djmk's Avatar
djmk djmk is offline
victory in near
 
Join Date: Sep 2008
Location: North Vancouver
Posts: 1,769
daily hive reporting that the old brentwood including london drugs is closing at the end of Spring


https://dailyhive.com/vancouver/burnaby-brentwood-town-centre-closing-spring-2025
__________________
i have no idea what's going on
Reply With Quote
     
     
  #990  
Old Posted Feb 14, 2025, 10:28 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,532
(deleted)

Last edited by jollyburger; Feb 15, 2025 at 12:49 AM.
Reply With Quote
     
     
  #991  
Old Posted Feb 22, 2025, 6:39 PM
Lexus's Avatar
Lexus Lexus is online now
Registered User
 
Join Date: Jul 2018
Posts: 2,723
2025, Feb 20

Untitled by Lexus LX, on Flickr

Untitled by Lexus LX, on Flickr

Untitled by Lexus LX, on Flickr

Untitled by Lexus LX, on Flickr
Reply With Quote
     
     
  #992  
Old Posted Mar 26, 2025, 6:13 PM
Lexus's Avatar
Lexus Lexus is online now
Registered User
 
Join Date: Jul 2018
Posts: 2,723
2025, March 26

Untitled by Lexus LX, on Flickr
Reply With Quote
     
     
  #993  
Old Posted Apr 1, 2025, 6:07 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,532
Some more footage of a concrete pour for the foundation

https://www.instagram.com/p/DHHcEb7yMNl/
Reply With Quote
     
     
  #994  
Old Posted Apr 14, 2025, 3:25 AM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,532
Concrete pour for the foundation

Video Link


Concrete trucks carry around 10 cubic metres but they only carried 8 cubic metres because of some hills that increase the risk of it spilling out of the drum.
Reply With Quote
     
     
  #995  
Old Posted Apr 21, 2025, 6:32 PM
Lexus's Avatar
Lexus Lexus is online now
Registered User
 
Join Date: Jul 2018
Posts: 2,723
2025, Apr 20

Untitled by Lexus LX, on Flickr

Untitled by Lexus LX, on Flickr
Reply With Quote
     
     
  #996  
Old Posted Apr 28, 2025, 7:47 AM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,532
1000 cubic yard pour of that transfer slab. The colored concrete is where they add colour to verify certain areas get higher strength concrete.

Video Link
Reply With Quote
     
     
  #997  
Old Posted Apr 28, 2025, 3:39 PM
53064043 53064043 is offline
Registered User
 
Join Date: Mar 2019
Posts: 63


Will the Dawson st. extension be completed during phase 2 construction (Oasis)?
Reply With Quote
     
     
  #998  
Old Posted Apr 28, 2025, 4:25 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,532
Quote:
Originally Posted by 53064043 View Post

Will the Dawson st. extension be completed during phase 2 construction (Oasis)?
The 2018 rezoning for Phase 2 included the extension bit not sure 100% if it's happening. There was also a new Lougheed/Delta intersection
Reply With Quote
     
     
  #999  
Old Posted Apr 28, 2025, 5:12 PM
Lexus's Avatar
Lexus Lexus is online now
Registered User
 
Join Date: Jul 2018
Posts: 2,723
Quote:
Originally Posted by jollyburger View Post
The 2018 rezoning for Phase 2 included the extension bit not sure 100% if it's happening. There was also a new Lougheed/Delta intersection
I would say that would be dictated by the parking access to those towers in phase 2. Yukon Cres seems to have already enough traffic to 4 towers of phase one, I would speculate that parade access would be through Dawson Street.
Reply With Quote
     
     
  #1000  
Old Posted Apr 28, 2025, 5:54 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,532
Quote:
Originally Posted by Lexus View Post
I would say that would be dictated by the parking access to those towers in phase 2. Yukon Cres seems to have already enough traffic to 4 towers of phase one, I would speculate that parade access would be through Dawson Street.
It seems like there's one parking entrance off of Dawson..

Quote:
3.5 A master phasing and servicing covenant for the Woodlands Master Plan has been
executed and outlines the required servicing for each phase of development.
Notwithstanding, the Director Engineering will be requested assess the need for any
further required services to the site, including, but not necessarily limited to:
• construction of Dawson Street across the development frontage to its final Town
Centre collector standard with a separated urban trail, street trees, street and
pedestrian lighting, and related pubUc amenities;
• construction of a bridge connection on Dawson Street across Stickleback Creek;
• construction of Yukon Crescent to Town Centre to its final local road standard with
separated sidewalks, street trees, rain gardens, and street and pedestrian lighting;
• construction of the Douglas Road/Delta Avenue and Lougheed Highway intersection
with street and pedestrian lighting, an updated traffic signal, left turn lanes, and
pedestrian and cycling crossings on all legs of the intersection. The required works
are to maintain and improve the functionality of the existing intersection.
• construction of a new asphalt public pedestrian walkway with cycling provisions
adjacent along the north property line adjacent Phase lb;
• construction of a new crushed granite public pedestrian pathway within the
Stickleback Creek Riparian corridor adjacent the east property line;
• storm, sanitary sewer and water main upgrades as required;
• proportionate contribution toward replacement of the Beta Avenue sanitary pump
station; and,
• proportionate contribution toward proposed Beta Avenue pedestrian and cycling
overpass.
https://search.heritageburnaby.ca/media/.../Unrestricted/2018/10-Dec-2018/92632.PDF
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Metro Vancouver & the Fraser Valley
Forum Jump



Forum Jump


All times are GMT. The time now is 2:32 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.