Is foundation work complete for the north tower also?
__________________
If all others accepted the lie which the Party imposed, if all records told the same tale, then the lie passed into history and became truth. -Orwell
Is foundation work complete for the north tower also?
The North Tower is what is currently being built. The South Tower's foundation hasn't started yet. It will likely be a while before they even start the next building on the site.
Just walked by right as they were installing a corner! Their coordination was really impressive to watch.
Also I'm pleasantly surprised by the accents between the flat glass sections on the E and W sides! Like the fins on One Chicago and Wolf Point East, these will catch the light really nicely at certain angles.
The North Tower is what is currently being built. The South Tower's foundation hasn't started yet. It will likely be a while before they even start the next building on the site.
Thanks!
What if after theyr'e done with this tower they decide to make the south tower even taller (like the original design IIRC).
__________________
If all others accepted the lie which the Party imposed, if all records told the same tale, then the lie passed into history and became truth. -Orwell
What is going on where the 2 bay windows meet on the inside? Seems a strange place for any piping/conduit.
Those are most likely the refrigerant lines for the HVAC units which are usually placed between rooms, close to the exterior wall so that they can most efficiently heat and cool the units. In this case I expect that they will be tucked behind the piers between bays.
Also saw it from the 31st St Beach pier today, and it looks like we'll have an unobstructed view of the side profile, so I mocked it up with the elevation diagram. Looks very much like a sailboat sail
New details have been revealed for the long-anticipated DuSable Park, located at 401 N DuSable Lake Shore Drive in Streeterville. Situated on a small peninsula east of the highway, the park has been in development for years, alongside the rapidly rising 400 N Lake Shore Drive project next door. Efforts are being led by the Chicago Park District and is partially funded by the 400 LSD development
__________________
All I want are bus lanes on Michigan Ave
Also saw it from the 31st St Beach pier today, and it looks like we'll have an unobstructed view of the side profile, so I mocked it up with the elevation diagram. Looks very much like a sailboat sail