Good news with a HCM shipping container and mobile forklift now on site. Surveyors have started staking out the perimeter of the foundation excavation pit. Should see a caisson drilling rig on site soon to start drilling the pilings for the pit walls for the two levels of underground parking planned for this future 35s tower.
Should have the foundation excavated and footings poured by end of 2025. Will be interested to see who the general contractor for this build is.