Quote:
Originally Posted by chowhou
I don't think they typically ran 6-car MK1 trains until the Evergreen Line opened (2016). They were still typically running 4-car but had expansion capacity for 6-car trains. Sounds like long term planning to me.
|
i feel like they should have planned for 5 car Mark II trains, which should be equal to 5-car Mark V trains.
though i dont know the platform lengths for the millennium-line. it seems weird to me they wouldnt be long enough for the Mark V trainsets. i certainly hope they are.
Quote:
Originally Posted by jollyburger
They're still running 2 car pairs so I mean it was good enough for three decades. Aren't all the Broadway Lines also ~80m?
|
needing to do major station platform upgrades after only 30yrs isnt long term planning when the system is meant to last 100yrs. there is no way theyd have planned for always runnin 2, or 4 car trains. it was always meant to go from UBC - Coquitlam. from the 3rd largest employment centre, through the 2nd largest employment centre, connecting to the Expo-line, going through burnaby. if they didnt plan for longer trains, thats just ridiculous.
yes, the broadway subway platforms are 82.5m long. enough for a 5-car Mark V train. though i think they should have done 100m.