  #281  
Old Posted Sep 13, 2024, 12:10 AM
ssiguy ssiguy is offline
Registered User
 
Join Date: Mar 2006
Location: White Rock BC
Posts: 11,978
Quote:
Originally Posted by GreatTallNorth2 View Post
It was quoted somewhere in the media that they are considering selling off the remaining land to another developer. That would explain why they would not be using the entire parcel.
Hopefully they sell it to Farhi as that will guarantee the development goes forward by 2050.
Reply With Quote
     
     
  #282  
Old Posted Sep 17, 2024, 3:03 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,380
Already excavating the NW corner and installing wood shoring beams for the retaining wall. They definitely are only doing the western half of the parking lot effectively cutting it in two. If they do go ahead with selling off the eastern half will be interesting to see how that plays out in the future.
Reply With Quote
     
     
  #283  
Old Posted Oct 1, 2024, 12:44 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,380
The drilling rig machine has now been removed and another excavator brought in as they dig out the west half of the parking lot and install shoring and angled braces into the walls. This is really odd but likely the reality for Ayerswood as they probably don't have the financial ability to build the full two tower phase 2 plan they proposed years ago. Maybe it would be best if they sold off the entire site including the empty 25s tower so it can be fully built. A pair of 45s towers would be great on the corner of Clarence and King.
Reply With Quote
     
     
  #284  
Old Posted Oct 11, 2024, 9:23 PM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,319
Not much to see so far, might try from the sidewalk instead of the truck if I get the chance.

Reply With Quote
     
     
  #285  
Old Posted Nov 9, 2024, 9:20 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,380
Down around 4 to 5 meters now around the perimeter walls for this excavation. If they plan to have 3 levels of underground parking and a large floating raft slab footing capable of supporting a 35s tower they will likely need to dig down to around 9 meters deep. Still no news on what Ayerwoods plans are for the site beyond underground parking. Hopefully some good news in the near future on this prominent site.
Reply With Quote
     
     
  #286  
Old Posted Nov 11, 2024, 10:07 PM
MolsonExport's Avatar
MolsonExport MolsonExport is offline
Touching grass everyday.
 
Join Date: Oct 2003
Location: Otisburgh
Posts: 51,554
This thread is nine years old! Farhi-style development pace.
__________________
The whole problem with the world is that fools and fanatics are always so certain of themselves, and wiser people so full of doubts. (Bertrand Russell). Sweet Loretta fart thought she was a cleaner, but she was a frying pan. (John Lennon)
Reply With Quote
     
     
  #287  
Old Posted Dec 17, 2024, 8:45 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,380
Appear to be down to around 6 meters deep in the NW corner of the pit. They probably need to go down deeper if they plan on 3 levels of underground parking. Still no indication on what they intend to do above ground or with the east side of the parking lot. No news on a sale or partnership on seeing thru with the previous vision of high rise towers.
Reply With Quote
     
     
  #288  
Old Posted Dec 21, 2024, 1:13 AM
Snark Snark is offline
Registered User
 
Join Date: May 2006
Posts: 505
Quote:
Originally Posted by jammer139 View Post
Appear to be down to around 6 meters deep in the NW corner of the pit. They probably need to go down deeper if they plan on 3 levels of underground parking. Still no indication on what they intend to do above ground or with the east side of the parking lot. No news on a sale or partnership on seeing thru with the previous vision of high rise towers.
A poster on Reddit is saying a couple of things about this:

- The current excavation has been slowed by their encountering a "well". Not sure what that might actually be, considering there was several floors of underground parking there previously

- The second phase is being redefined from two towers to one larger (taller?) tower

No idea how accurate any of this is.
Reply With Quote
     
     
  #289  
Old Posted Jan 7, 2025, 6:27 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,380
Small mobile crane on site preparing to install a tower crane base. Looks like they are setting up to use a tower crane for the foundation and underground parking garage construction. Still no information on what this will look like or if there is plans to erect a tower on top of this parking garage.
Reply With Quote
     
     
  #290  
Old Posted Jan 23, 2025, 7:44 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,380
The 2nd tower crane of 2025 is going up today on this site. Still no info on what they intend to build here beyond the underground parking garage.
Reply With Quote
     
     
  #291  
Old Posted Mar 26, 2025, 7:44 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,380
Work continues at the bottom of the 3 level pit on the foundation footings. Still no info on what Ayerswood intends to do with this beyond what they stated last fall about building a underground parking garage.
Reply With Quote
     
     
  #292  
Old Posted Mar 26, 2025, 10:34 PM
GreatTallNorth2 GreatTallNorth2 is offline
Registered User
 
Join Date: May 2006
Posts: 1,758
I called them up a few weeks back to ask them what they were building and the gentleman confirmed it was the garage. I asked if they plan on building the next tower soon and he said probably start within a year and the plan is 42 floors for the next building.
Reply With Quote
     
     
  #293  
Old Posted Mar 26, 2025, 10:37 PM
CanadianTalk's Avatar
CanadianTalk CanadianTalk is offline
Moderator
 
Join Date: Jun 2021
Location: London, Ontario
Posts: 1,299
Quote:
Originally Posted by GreatTallNorth2 View Post
I called them up a few weeks back to ask them what they were building and the gentleman confirmed it was the garage. I asked if they plan on building the next tower soon and he said probably start within a year and the plan is 42 floors for the next building.
Thanks for personally inquiring with the developer! Did you mean 32 floors? If they changed it to 42, then I'm pretty sure they would have to submit a new zoning application with the city, and then a new site plan, and building permit... and that whole process takes a little while.
Reply With Quote
     
     
  #294  
Old Posted Mar 27, 2025, 12:07 AM
GreatTallNorth2 GreatTallNorth2 is offline
Registered User
 
Join Date: May 2006
Posts: 1,758
Quote:
Originally Posted by CanadianTalk View Post
Thanks for personally inquiring with the developer! Did you mean 32 floors? If they changed it to 42, then I'm pretty sure they would have to submit a new zoning application with the city, and then a new site plan, and building permit... and that whole process takes a little while.
He said 42, not sure if that was a mistake on his part.
Reply With Quote
     
     
  #295  
Old Posted May 2, 2025, 6:14 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,380
They have now poured a foundation for the walls and posts for the 3 level underground parking garage. Have most of the L3 walls and posts now poured and have started pouring the L3 floor slab. Looks like plans for anything other then underground parking are up in the air and pending future decisions. My guess is they will be actively looking to either sell or partner with another developer to move any future development on this site.
Reply With Quote
     
     
  #296  
Old Posted May 4, 2025, 4:42 PM
ssiguy ssiguy is offline
Registered User
 
Join Date: Mar 2006
Location: White Rock BC
Posts: 11,978
I would prefer one 42 story tower to building 2 shorter ones. I always thought 3 buildings on such a small lot was a bit much. It would also be more appealing to actually live in because one tower allows enough distance between the other to enjoy the view or even just have some privacy. 3 buildings would have meant you can watch your neighbour have dinner. Density is great but first and foremost, the residences have to be livable.
Reply With Quote
     
     
  #297  
Old Posted May 4, 2025, 5:58 PM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,319
By my eye, the remaining space on that corner can easily handle 2 buildings. Not big floor plate designs like Renaissance or City Place but Centro minus the middle short building could easily fit here. One building in that remaining space would be a really big building, or a big waste of lot space. The building they just finished on the site was kind of shoehorned into the spot it's in and that space would have otherwise been wasted if they only went with 2 buildings on the site. A 42 where they are currently working, and a 35-ish right at the corner would look good there I think.
Reply With Quote
     
     
  #298  
Old Posted May 23, 2025, 12:31 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,380
They have now poured the southerly third of the L2 floor slab. All the L3 floor is also poured except the section where the L3 to L2 parking ramp is yet to be formed. Have also started forming for some of the L2 posts on the south side.
Reply With Quote
     
     
  #299  
Old Posted May 23, 2025, 2:27 AM
ssiguy ssiguy is offline
Registered User
 
Join Date: Mar 2006
Location: White Rock BC
Posts: 11,978
I'm completely lost.

Are you guys talking about the building that's nearly done or has the second highrise already started construction?
Reply With Quote
     
     
  #300  
Old Posted May 23, 2025, 2:37 AM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,319
Quote:
Originally Posted by ssiguy View Post
I'm completely lost.

Are you guys talking about the building that's nearly done or has the second highrise already started construction?
The parking garage under what will become the next tower immediately south of the one that was just built. Right now there is no on site parking that I'm aware of for that tower
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 7:36 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.