Quote:
Originally Posted by MonctonRad
BTW, what happens to the VIA Rail corridor service if this new HSR proposal comes to fruition. Won't this gut the majority of VIA's central Canadian routes? What will VIA's mandate be after this happens???
|
We saw when the the original RFI and draft RFP came out that the Corridor will be privatized. Alto will take over the Corridor. VIA will be reduced to non-Corridor routes.