Old Posted Jan 1, 2025, 6:49 PM
Alee538 Alee538 is offline
Registered User
 
Join Date: Jul 2024
Posts: 3
Tower 2 Walk Through

Any high level owner (45+) done or scheduled any walk through?
What is the usual timeline for closing, getting key and move in?
Reply With Quote
     
     
  #2662  
Old Posted Jan 1, 2025, 7:56 PM
jasonpark jasonpark is offline
Registered User
 
Join Date: Aug 2021
Posts: 117
Quote:
Originally Posted by Alee538 View Post
Any high level owner (45+) done or scheduled any walk through?
What is the usual timeline for closing, getting key and move in?
I think 30 something and below are moving in. I saw 6 elevators. Three for the lower floors and three for the upper floors. The upper floors look to be still being worked on because the upper floor elevators are completely covered with cardboard and tape with trades ppl coming in and out.
Reply With Quote
     
     
  #2663  
Old Posted Jan 2, 2025, 3:38 PM
GilmorePete GilmorePete is offline
Registered User
 
Join Date: May 2024
Posts: 46
From FB forums it looks like some people have a mid January walk through scheduled for floors 48 and 49. However, this does not appear inclusive for everyone on these floors.
Reply With Quote
     
     
  #2664  
Old Posted Jan 12, 2025, 9:44 PM
Zepfancouver's Avatar
Zepfancouver Zepfancouver is offline
Registered User
 
Join Date: Aug 2017
Location: Vancouver
Posts: 2,656
I was waiting for one more update from mcminsen before posting this final gif of this project.
In mcminsen's last posting Post #2394 July 25, 2024 there was a little construction on the roof, elevator machine room and/or mechanical room not cladded yet.

Feb 2022 to July 2024


https://makeagif.com/i/KqfbwI
Reply With Quote
     
     
  #2665  
Old Posted Jan 12, 2025, 10:29 PM
giallo's Avatar
giallo giallo is offline
be nice to the crackheads
 
Join Date: Apr 2002
Location: Vancouver
Posts: 12,761
Quote:
Originally Posted by Zepfancouver View Post
I was waiting for one more update from mcminsen before posting this final gif of this project.
In mcminsen's last posting Post #2394 July 25, 2024 there was a little construction on the roof, elevator machine room and/or mechanical room not cladded yet.

Feb 2022 to July 2024


https://makeagif.com/i/KqfbwI
Sweet gif, Zep! Thanks for making it.
Reply With Quote
     
     
  #2666  
Old Posted Jan 18, 2025, 12:07 AM
chowhou's Avatar
chowhou chowhou is online now
Registered User
 
Join Date: Sep 2019
Location: East Vancouver (No longer across the ocean!)
Posts: 3,916
Sounds like all three towers have occupancy, I propose to change Phase 1 to completed.
Reply With Quote
     
     
  #2667  
Old Posted Jan 24, 2025, 6:52 AM
fromthelake fromthelake is offline
Registered User
 
Join Date: Dec 2017
Posts: 14
Any information on phase 2?
Reply With Quote
     
     
  #2668  
Old Posted Feb 15, 2025, 5:53 PM
Lexus's Avatar
Lexus Lexus is offline
Registered User
 
Join Date: Jul 2018
Location: Vancouver | BC | Canada
Posts: 2,871
2025, Feb 12

It's more black that I previously thought

Untitled by Lexus LX, on Flickr
Reply With Quote
     
     
  #2669  
Old Posted Feb 17, 2025, 7:24 AM
Repthe250 Repthe250 is offline
Registered User
 
Join Date: Mar 2021
Location: Kelowna, BC
Posts: 454
Barf
Reply With Quote
     
     
  #2670  
Old Posted Feb 17, 2025, 7:38 PM
Alex Mackinnon's Avatar
Alex Mackinnon Alex Mackinnon is online now
Can I has a tunnel?
 
Join Date: May 2008
Location: East Van
Posts: 2,220
Quote:
Originally Posted by Repthe250 View Post
Barf
It's certainly not going to be winning a beauty contest.
Reply With Quote
     
     
  #2671  
Old Posted Feb 17, 2025, 9:24 PM
Spr0ckets Spr0ckets is offline
Registered User
 
Join Date: Oct 2015
Posts: 1,992
It's certainly not a flattering angle that the shot shows them in - with the shadow of one falling on the other, and the emphasis of the units in one tower looking directly at the other tower's units.

The black/dark spandrel (which I'm normally a fan of) also doesn't help in those same regards.
Reply With Quote
     
     
  #2672  
Old Posted Feb 17, 2025, 9:42 PM
NetMapel's Avatar
NetMapel NetMapel is offline
Hello World
 
Join Date: Jul 2008
Posts: 1,580
So when can we expect the first floor to be opened finally? There are a number of retailers signed up from T&T, hot pot restaurant to KFC and more. Yet there seems to be no movement there whatsoever when I go by it. It's just empty and fenced off. I've noticed this sort of super long wait for a variety of reasons in recent years both with Popeyes chicken in metrotown to the variety of "Coming Soon" stores in Brentwood. What's going on with these years-long process to open a store here?
Reply With Quote
     
     
  #2673  
Old Posted Feb 17, 2025, 10:21 PM
chowhou's Avatar
chowhou chowhou is online now
Registered User
 
Join Date: Sep 2019
Location: East Vancouver (No longer across the ocean!)
Posts: 3,916
Quote:
Originally Posted by NetMapel View Post
So when can we expect the first floor to be opened finally? There are a number of retailers signed up from T&T, hot pot restaurant to KFC and more. Yet there seems to be no movement there whatsoever when I go by it. It's just empty and fenced off. I've noticed this sort of super long wait for a variety of reasons in recent years both with Popeyes chicken in metrotown to the variety of "Coming Soon" stores in Brentwood. What's going on with these years-long process to open a store here?
Suit Supply opening 2020
Reply With Quote
     
     
  #2674  
Old Posted Feb 18, 2025, 2:03 AM
NetMapel's Avatar
NetMapel NetMapel is offline
Hello World
 
Join Date: Jul 2008
Posts: 1,580
Quote:
Originally Posted by chowhou View Post
Suit Supply opening 2020
There's like a nail salon place there too that's gotta be at least over a year of "coming soon" as well. Also approaching a year is the donut place "coming soon" as well.
Reply With Quote
     
     
  #2675  
Old Posted Feb 19, 2025, 7:12 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,832
The leasing plan got updated

Level 1

T&T
Bubble Tea
La Ruota
Subway
Kinton Ramen
Gallbi Korean BBQ
Trees Cheesecake
Brooklyn Dumpling Shop
Seed & Stone

Level 2 (majority of this floor is unleased)
KFC
Supplement King
Club Pilates
Happy Gilmore Golf Lounge
Big Way Hot Pot
Deka Lash

Level 3 Nothing leased

https://onni.com/wp-content/uploads/2017/07/Gilmore-Place-Retail-Brochure-Feb-2025-1.pdf
Reply With Quote
     
     
  #2676  
Old Posted Feb 20, 2025, 12:22 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,814
Quote:
Originally Posted by jollyburger View Post
Thanks!
Here are the plans.

CRU 203 would have been good for London Drugs if they wanted to move out of Amazing Brentwood.
Those large spaces would be great for any of the TJX brands (Winners, etc.),
but are there escalators to any of the levels to get up from the SkyTrain plaza?
I could see a fitness centre on the 3rd level, but Gilmore Place's amenities are so massive that residents don't need it.


https://onni.com/wp-content/uploads/2017/07/Gilmore-Place-Retail-Brochure-Feb-2025-1.pdf


https://onni.com/wp-content/uploads/2017/07/Gilmore-Place-Retail-Brochure-Feb-2025-1.pdf

Last edited by officedweller; Feb 20, 2025 at 1:17 AM.
Reply With Quote
     
     
  #2677  
Old Posted Feb 20, 2025, 6:43 PM
Vin Vin is offline
Registered User
 
Join Date: Sep 2013
Posts: 8,739
I don't see a problem for the retail being taken up. Just see Marine Gateway and New Westminster stations: I believe the retail units are all occupied, although I must admit those stations provide better conditions for retailers to do well. If Gilmore station becomes a transit exchange, there will be an even higher foot passenger volume.
Reply With Quote
     
     
  #2678  
Old Posted Feb 20, 2025, 7:50 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,832
From the rendering flythrough video it seems like it's mostly staircases going up to level 3 (and the elevators)
Reply With Quote
     
     
  #2679  
Old Posted Feb 20, 2025, 8:00 PM
chowhou's Avatar
chowhou chowhou is online now
Registered User
 
Join Date: Sep 2019
Location: East Vancouver (No longer across the ocean!)
Posts: 3,916
Quote:
Originally Posted by Vin View Post
I don't see a problem for the retail being taken up. Just see Marine Gateway and New Westminster stations: I believe the retail units are all occupied, although I must admit those stations provide better conditions for retailers to do well. If Gilmore station becomes a transit exchange, there will be an even higher foot passenger volume.
Pure speculation, but for some reason at Gilmore and Dawson Burnaby has installed 4 bus shelters instead of the single bus shelter that existed before development began. Perhaps they're planning for more/bigger busses?

As for escalators, I don't think there's a single one but the elevator situation seems much better than at Marine Gateway.
Reply With Quote
     
     
  #2680  
Old Posted Feb 20, 2025, 8:13 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,832
Quote:
Originally Posted by chowhou View Post
Pure speculation, but for some reason at Gilmore and Dawson Burnaby has installed 4 bus shelters instead of the single bus shelter that existed before development began. Perhaps they're planning for more/bigger busses?

As for escalators, I don't think there's a single one but the elevator situation seems much better than at Marine Gateway.
Seems like it was supposed to be a signature bus shelter.

Quote:
The bounding streets of Lougheed Highway and Gilmore Avenue will be developed with separated bicycle and pedestrian facilities with a double row of street trees, and rainwater gardens. Pavement treatments include cut concrete sidewalks to remove barriers to accessibility. A signature bus shelter is proposed for the multi route bus stop location on Gilmore Avenue that covers the entire sidewalk and bicycle lane with specialized pavement treatment to raise awareness of multiple transportation modes within this
location. The bounding public streets will be the main routes for pedestrians, transit users and cyclists.
https://pub-burnaby.escribemeetings.com/filestream.ashx?DocumentId=37041
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Metro Vancouver & the Fraser Valley
Forum Jump



Forum Jump


All times are GMT. The time now is 6:32 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.