HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces > Halifax > Halifax Peninsula & Downtown Dartmouth


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Feb 20, 2025, 1:42 PM
Drybrain Drybrain is offline
Registered User
 
Join Date: Sep 2012
Posts: 4,568
Someone on Reddit was wondering why the cost for this hospital ($4.5 billion for construction) is twice the $2.2 billion cost of the St. Paul's hospital rebuild in Vancouver, which is slightly larger (1.2 million square feet), on a similarly challenging urban site, has way more beds, and includes a neonatal unit, which I assume this won't since we have the IWK for that.

Not necessarily saying the costing is suspect--there could be very good reasons for the higher cost, and I am definitely no expert on health-care infrastructure costing--but it is curious. I wonder if anyone here has any insight.

I also wish we could get some real renderings, not this autocad-looking graphic.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces > Halifax > Halifax Peninsula & Downtown Dartmouth
Forum Jump



Forum Jump


All times are GMT. The time now is 10:10 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.