Quote:
Originally Posted by bomberjet View Post
1/16 has traffic lights. That is the solution for MTI prior to an interchange. They prioritized Brandon in that regard over the next 5 years (for interchanges). Which is a big step in itself.

They'll probably put traffic lights in at 1/5 if I were to bet on it.
As much as I think a median widening and RCUT would be functional, I believe a traffic light should be added and it would cut most of the costs. Accidents still can happen with traffic lights (with everything LOL), but still better than nothing.

I wouldn't want a roundabout on a 4 lane Highway, unless maybe a Turbo Roundabout.
Reply With Quote
     
     
  #4362  
Old Posted Jan 10, 2025, 9:05 PM
Wpgstvsouth94 Wpgstvsouth94 is offline
 
Join Date: Aug 2020
Posts: 445
Uhh so I just opened the Manitoba interactive road construction map and happened to look at the Highway three and 100 interchange and it has been updated to 2026 to 2029? Please tell me this is a joke or wrong.?
Reply With Quote
     
     
  #4363  
Old Posted Jan 10, 2025, 9:30 PM
bomberjet bomberjet is offline
 
Join Date: Nov 2012
Posts: 16,386
Booo. Still says 25-28 on the website.
Reply With Quote
     
     
  #4364  
Old Posted Jan 10, 2025, 9:32 PM
bomberjet bomberjet is offline
 
Join Date: Nov 2012
Posts: 16,386
Looking at the map. its says structure replacement for the PTH 101 Red River Bridge. 27-30 construction.
Reply With Quote
     
     
  #4365  
Old Posted Jan 10, 2025, 9:40 PM
Wpgstvsouth94 Wpgstvsouth94 is offline
 
Join Date: Aug 2020
Posts: 445
Quote:
Originally Posted by bomberjet View Post
Booo. Still says 25-28 on the website.
I saw that I went to the government of Manitoba website and it still says 2025. So I’m hoping it’s just an error because that would be really bad..

There are two blue circles on the map for the structure over the river one on the bridge on the map and a little dot just north in Fort Richmond. Kind of weird
Reply With Quote
     
     
  #4366  
Old Posted Jan 10, 2025, 9:53 PM
bomberjet bomberjet is offline
 
Join Date: Nov 2012
Posts: 16,386
^I could get a better list together of the high dollar projects listed in the latest infrastructure plan. But there is a $110 million dollar project listed for the Red River bridge.

Based on all the info and structure replacement tag, they will be upgrading/rehabbing/replacing the bridge crossing to align with the Perimeter Freeway projects. If McGillivray is "delayed" by one year, so be it. In general progress is still moving. Ste. Anne's is identified as next project. So the plan marches on.

Quote:
Originally Posted by bomberjet View Post
Okay edit. I missed the end part of the plan with the 2025-2029 projects and the split by region.

110 million dollar bridge project for PTH 100 at Red River. That seems like either a new bridge or a complete rebuild and expansion of the existing. Maybe both.

PTH 59/52 twinning is in there.

PR 307 in the Whiteshell basically fully replaced in segments. $200million plus.

And the PTH1 / 10 interchange in Brandon, as mentioned in the highways thread.

I'll move this convo over there.
Reply With Quote
     
     
  #4367  
Old Posted Jan 14, 2025, 12:55 PM
Biff's Avatar
Biff Biff is offline
 
Join Date: Jun 2004
Posts: 9,946
Progress

The 3 prequalified Design Builders for the Perimeter and Hwy 3 interchange is Graham Construction, PCL and Green Infrastructure Partners Inc.

Last edited by Biff; Jan 14, 2025 at 1:58 PM.
Reply With Quote
     
     
  #4368  
Old Posted Jan 14, 2025, 2:58 PM
bomberjet bomberjet is offline
 
Join Date: Nov 2012
Posts: 16,386
Thanks Biff. Do you know timelines on when they expect to award the project? Or are they just starting the competition period? If they're just starting that would lead to confirm the project start being delayed to 2026 construction start.

You're right though, good news there is progress.
Reply With Quote
     
     
  #4369  
Old Posted Jan 14, 2025, 3:58 PM
WildCake WildCake is offline
 
Join Date: May 2016
Posts: 1,072
Quote:
Originally Posted by bomberjet View Post
Thanks Biff. Do you know timelines on when they expect to award the project? Or are they just starting the competition period? If they're just starting that would lead to confirm the project start being delayed to 2026 construction start.

You're right though, good news there is progress.
The MTI map now shows a summer 2026 start to construction 🙃
Reply With Quote
     
     
  #4370  
Old Posted Jan 14, 2025, 4:09 PM
bomberjet bomberjet is offline
 
Join Date: Nov 2012
Posts: 16,386
Ya we were discussing earlier in this page of the thread. If it's actually delayed, I'm going to guess it's a strategic funding related thing with the large deficits recently.
Reply With Quote
     
     
  #4371  
Old Posted Jan 14, 2025, 4:11 PM
Mr Tall Forehead's Avatar
Mr Tall Forehead Mr Tall Forehead is offline
 
Join Date: Jul 2024
Posts: 916
https://macdonald.allnetmeetings.com/pub...tid=A5EAB760-3639-46B2-BC5B-D6176FC270F9

A copy of a slide deck MTI presented to the RM of Macdonald showing timelines, impacts to local infrastructure, final interchange design, etc.
Reply With Quote
     
     
  #4372  
Old Posted Jan 14, 2025, 6:53 PM
bomberjet bomberjet is offline
 
Join Date: Nov 2012
Posts: 16,386
Confirmed. Thanks for sharing.
Reply With Quote
     
     
  #4373  
Old Posted Jan 14, 2025, 8:20 PM
Flatland Metropolis's Avatar
Flatland Metropolis Flatland Metropolis is offline
 
Join Date: Oct 2013
Posts: 308
Yes, project delayed a year. Issues with property acquisition.
Reply With Quote
     
     
  #4374  
Old Posted Jan 15, 2025, 1:21 AM
bomberjet bomberjet is offline
 
Join Date: Nov 2012
Posts: 16,386
I also heard the preferred design is being worked on for north perimeter. Should be something coming in the near future. But they're still working with stakeholders on specific locations.
Reply With Quote
     
     
  #4375  
Old Posted Jan 15, 2025, 7:42 PM
Wpgstvsouth94 Wpgstvsouth94 is offline
 
Join Date: Aug 2020
Posts: 445
Ohh Manitoba, they only had five years to prepare for this when it was initially announced…
Reply With Quote
     
     
  #4376  
Old Posted Jan 16, 2025, 4:56 PM
bomberjet bomberjet is offline
 
Join Date: Nov 2012
Posts: 16,386
Disappointed the McGillivray project doesn't include the rail overpass at the CEMR crossing. I know it's low use and such. But the project name includes "Perimeter Freeway". and now is the perfect time to do it efficiency wise.

The entire west Perimeter would be an actual freeway from PTH 6 to east of the McGillivray project., They could close the last few remaining access points north of the CEMR crossing as the rail overpass provides access across (under) the Perimeter and it'd be a freeway.
Reply With Quote
     
     
  #4377  
Old Posted Jan 16, 2025, 5:18 PM
bomberjet bomberjet is offline
 
Join Date: Nov 2012
Posts: 16,386
Also, McGillivray schedule is here. Target open to traffic date of August 31, 2029.

Reply With Quote
     
     
  #4378  
Old Posted Jan 16, 2025, 5:56 PM
Biff's Avatar
Biff Biff is offline
 
Join Date: Jun 2004
Posts: 9,946
Quote:
Originally Posted by bomberjet View Post
Disappointed the McGillivray project doesn't include the rail overpass at the CEMR crossing. I know it's low use and such. But the project name includes "Perimeter Freeway". and now is the perfect time to do it efficiency wise.
I'd much rather save the $40-$50m on a rail overpass for a seldom used rail line and build a diamond at Pipeline.
Reply With Quote
     
     
  #4379  
Old Posted Jan 16, 2025, 7:43 PM
bomberjet bomberjet is offline
 
Join Date: Nov 2012
Posts: 16,386
Let's just do it all haha. I know, I know.. But they're basically doing work up to the railway Just go that extra bit further. I assume the overpass would be part of a future grade widening project for the roadway to the north.

Pipeline is the obvious easy first step on north Perimeter. Would be the cheapest and most effective use of money at a key location. PTH 6 appears it will be expensive but should be up there on the list. Dugald would probably be 3rd in priority with Gunn and Wenzel being 4th and 5th.
Reply With Quote
     
     
  #4380  
Old Posted Jan 17, 2025, 3:53 AM
Carboy15's Avatar
Carboy15 Carboy15 is online now
 
Join Date: Oct 2022
Posts: 614
Quote:
Originally Posted by Biff View Post
I'd much rather save the $40-$50m on a rail overpass for a seldom used rail line and build a diamond at Pipeline.
Makes sense. I'm sure they'd sooner relocate the rail lines West of the Perimeter to connect with the CN Rivers Subdivision. As there are still some grain elevators alongside the line, I probably wouldn't see it get pulled for a while, maybe unless the services get relocated to the CP Glenboro Subdivision
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 1:24 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.