The city will be reconstructing Oxford Street between Highbury and Fanshawe College starting next year as part of the final phase of the East London Link BRT.
The road will be widened to maintain the four existing lanes of traffic, plus two new centre-running bus lanes, left turn lanes, sidewalks and cycling paths on both sides.
A public session was recently held online and they provided renderings of this stretch of road.
https://getinvolved.london.ca/25447/widgets/134888/documents/142541
Looks like new there will be three new traffic signals installed (in addition to the ones already there); one at JP2 high school / future road to Old Oaks subdivision, one at the western end of Fanshawe College, and a pedestrian signal between First St and Second St.
And just as a reminder, the above project, along with the widening of the Highbury bridge north of Dundas will be the only totally new BRT projects that will start next year.
All the other main BRT projects next year are just a continuation of the two projects that started this year (widening of Wellington from Exeter Rd to Wilkins St, and the widening of the Wellington bridge over the Thames River).