You don't wanna rush testing with new trains (I'm looking at you Ottawa LRT)
|
Skytrain is automated. LRT's are not. Most of the reason why LRT's — is because the human element makes it —, over-speed, over-engaging the brakes, track intrusions, t-boning by cars on level-crossings, etc.
What needs to happen on the Skytrain for testing is different. Different generations of computers, different generations of moving parts. An appropriate analogy would be trying to stick a Geforce 5090 into a 40 year old 286. A bunch of stuff has to be upgraded with every generation of trains.
MK I's are from 1985 generation. The tracks were designed to fit 6 of those cars.
MK II and later only 5 cars can fit because the cars are longer. With the MK V, they actually are longer than 6-car design spec of the MK I.
The Track intrusion systems have to be upgraded logically because of that.
By comparison to a LRT system, the human can over-shoot the station when not running in protected mode GoA2. This is one of the reasons why the Toronto's version of the Skytrain had more problems, because the TTC drivers union would not permit it to run in UTO (GoA4) like it was designed for.