HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario


Reply

 
Thread Tools Display Modes
     
     
  #2941  
Old Posted Dec 6, 2024, 6:27 PM
Antonio Mast Antonio Mast is online now
Registered User
 
Join Date: Apr 2024
Posts: 582
Structural issues stall $1.45M restoration of Windsor's oldest, ‘most historic’ building
News on the progress of the 226-year-old Duff-Baby House in Old Sandwich
https://windsorstar.com/news/local-news/...f-windsors-oldest-most-historic-building
Reply With Quote
     
     
  #2942  
Old Posted Dec 6, 2024, 11:37 PM
ericmacm's Avatar
ericmacm ericmacm is online now
Registered User
 
Join Date: Jul 2017
Location: SW Ontario
Posts: 974
Not pertaining to Windsor specifically, but it has some major impacts for the skyline for Windsor and Detroit as a whole:





Detroit Renaissance Center redevelopment currently proposed to include demolition of two towers. The two towers closest to the river are proposed to be demolished and the entire podium is proposed to be pared back significantly in order to allow the towers to better interact with the pedestrian landscape of the Detroit Riverwalk. A lot of the surface parking is also going to be redeveloped, with all parking being consolidated into garages. Bedrock Developments is involved in this, of course. I know the insularity of the RenCen it is kind of a difficult thing to work around. However, I don't think demolishing any of the towers from the main part of the complex is the way forward - this is the single most iconic complex of buildings in the city, and I was hoping Detroit would have put its legacy of demolishing major icons behind it. I do like that they are at least planning to scale back the size of the podium. I would prefer that if something has to be demolished, it should be the two shorter towers east of the main complex. However, I can only imagine that it would be quite difficult to convert any of those large office towers over to residential given the floor plate size, so if these office towers are chronically empty, there probably isn't much else they can do with them.
__________________
Opinions expressed here are solely my own.

Come See My Work: Pan-Canadian Skylines Project​​​ | Astrophotography Thread
Reply With Quote
     
     
  #2943  
Old Posted Dec 7, 2024, 1:17 PM
DieselXL DieselXL is offline
Registered User
 
Join Date: Aug 2021
Location: Windsor Ontario
Posts: 216
The two smaller towers to the east are owned separately from the Ren Cen main complex.
The owner of those two buildings have already made smaller announcements regarding their future (no physical changes of note).
Reply With Quote
     
     
  #2944  
Old Posted Dec 10, 2024, 2:40 PM
Antonio Mast Antonio Mast is online now
Registered User
 
Join Date: Apr 2024
Posts: 582
New School Approved In Belle River.
The Greater Essex County District School Board to issue the tender for a new $22.97 million Lakeshore Elementary School .
https://windsorite.ca/2024/12/new-school-approved-in-belle-river/
Reply With Quote
     
     
  #2945  
Old Posted Dec 12, 2024, 2:25 PM
Antonio Mast Antonio Mast is online now
Registered User
 
Join Date: Apr 2024
Posts: 582
Gordie Howe Bridge Project, progress continues with the installation of electrical, drainage and fire suppression systems all underway.

https://twitter.com/AeconGroupInc/status/1866942499475894631/photo/1


Reply With Quote
     
     
  #2946  
Old Posted Dec 14, 2024, 10:13 AM
ohhimark ohhimark is offline
Registered User
 
Join Date: Aug 2020
Posts: 78
Quote:
Originally Posted by ericmacm View Post
Not pertaining to Windsor specifically, but it has some major impacts for the skyline for Windsor and Detroit as a whole:





Detroit Renaissance Center redevelopment currently proposed to include demolition of two towers. The two towers closest to the river are proposed to be demolished and the entire podium is proposed to be pared back significantly in order to allow the towers to better interact with the pedestrian landscape of the Detroit Riverwalk. A lot of the surface parking is also going to be redeveloped, with all parking being consolidated into garages. Bedrock Developments is involved in this, of course. I know the insularity of the RenCen it is kind of a difficult thing to work around. However, I don't think demolishing any of the towers from the main part of the complex is the way forward - this is the single most iconic complex of buildings in the city, and I was hoping Detroit would have put its legacy of demolishing major icons behind it. I do like that they are at least planning to scale back the size of the podium. I would prefer that if something has to be demolished, it should be the two shorter towers east of the main complex. However, I can only imagine that it would be quite difficult to convert any of those large office towers over to residential given the floor plate size, so if these office towers are chronically empty, there probably isn't much else they can do with them.
That looks terrible, and phallic. The podium has always been monolithically disgusting lol.
Reply With Quote
     
     
  #2947  
Old Posted Dec 16, 2024, 6:25 AM
Mick42 Mick42 is offline
Registered User
 
Join Date: Mar 2024
Posts: 34
Quote:
Originally Posted by inter777 View Post
This looks awesome, cool to see some serious people taking interest in Windsors Downtown.
Reply With Quote
     
     
  #2948  
Old Posted Dec 30, 2024, 6:46 PM
inter777 inter777 is offline
Registered User
 
Join Date: Feb 2021
Location: Windsor, ON
Posts: 276
Here is the building application by Rock developments for the new Costco and retail plaza to be built on the east side.

https://citywindsor.ca/residents/plannin...60-tecumseh-road-east-0-catherine-street

4 storey proposed at Tecumseh rd east and Benjamin. Steps from the Caboto development.

https://www.citywindsor.ca/residents/pla...west-northeast-corner-at-benjamin-avenue
Reply With Quote
     
     
  #2949  
Old Posted Jan 3, 2025, 7:01 PM
Mick42 Mick42 is offline
Registered User
 
Join Date: Mar 2024
Posts: 34
Quote:
Originally Posted by inter777 View Post
Here is the building application by Rock developments for the new Costco and retail plaza to be built on the east side.

https://citywindsor.ca/residents/plannin...60-tecumseh-road-east-0-catherine-street

4 storey proposed at Tecumseh rd east and Benjamin. Steps from the Caboto development.

https://www.citywindsor.ca/residents/pla...west-northeast-corner-at-benjamin-avenue

Google Earth shows some abandoned cars in that field. Looks like the forest is comin in pretty good there too. They probably need to drop a big pad site over it before people say it’s old growth. That big empty area between Jefferson and Lauzon north of Tecumseh will need a decent sized park though, concrete jungle on all sides.
Reply With Quote
     
     
  #2950  
Old Posted Jan 5, 2025, 9:56 PM
inter777 inter777 is offline
Registered User
 
Join Date: Feb 2021
Location: Windsor, ON
Posts: 276
There was some land clearing a couple months ago near the Serbian centre I noticed. I'm curious to see how long until Catherine Street is extended behind the Walmart and Home Depot.
Reply With Quote
     
     
  #2951  
Old Posted Jan 8, 2025, 2:44 PM
Antonio Mast Antonio Mast is online now
Registered User
 
Join Date: Apr 2024
Posts: 582
Former Gas Station Property at 1110 Tecumseh Road (northeast corner at Benjamin Avenue) Could See Housing development

https://windsorite.ca/2025/01/former-gas-station-property-could-see-housing/
Reply With Quote
     
     
  #2952  
Old Posted Jan 8, 2025, 4:29 PM
inter777 inter777 is offline
Registered User
 
Join Date: Feb 2021
Location: Windsor, ON
Posts: 276
Canadian port of entry experience in depth

Video Link
Reply With Quote
     
     
  #2953  
Old Posted Jan 8, 2025, 5:51 PM
Antonio Mast Antonio Mast is online now
Registered User
 
Join Date: Apr 2024
Posts: 582
Reply With Quote
     
     
  #2954  
Old Posted Jan 8, 2025, 6:03 PM
Antonio Mast Antonio Mast is online now
Registered User
 
Join Date: Apr 2024
Posts: 582
City master plan renewals slated for high profile Festival Plaza and Sandpoint Beach
alt test

WindsorOntarioNews.com Dec 25 2024

Windsor City Council is being asked to endorse two major revamps of high profile riverfront sites. At its January 13 meeting council will be asked to first endorse a new downtown Festival Plaza master plan at a cost of $20 million. And it will be asked to approve a master plan for the redevelopment of Sandpoint Beach on Windsor’s far east side, at a price of $15 million. Festival Plaza is home to innumerable concerts and festivals but often seen as a sterile concrete island with little functionality. The plan – the most expensive of three options – would create a “vibrant and dynamic” space “capable of hosting large-scale events while maintaining versatility for everyday use, with advanced features and amenities that go beyond the essentials,” says a report. Key aspects would be two shade strictures and two water features, a “secondary platform” to host a “variety of events, with the opportunity for an iconic centerpiece, such as a seasonal Christmas tree, creating a memorable focal point for visitors.” There would be “raised swat walls” which would offer a ”buffer” against winter winds transforming the space to year round use. There would also be “four distinct zones” hosting different types of events. The city currently has $12 million in its budget and would seek additional funding. Meanwhile, Sandpoint Beach would be transformed with “enhanced beach facilities, new recreational facilities including an accessible playground and splash pad, an expanded wildlife area, and washroom renovations, alongside significant landscaping and accessibility improvements.” Safety is also a key features in light of several drownings in recent years. Redevelopment would be long term. The city only has $1.5 million earmarked for budget years 2029 and 2030 and "additional capital funding” would have to be sought.

https://www.windsorontarionews.com/
Reply With Quote
     
     
  #2955  
Old Posted Jan 8, 2025, 7:47 PM
Antonio Mast Antonio Mast is online now
Registered User
 
Join Date: Apr 2024
Posts: 582
Rezoning approved by city committee for three new 3 storey dwellings on Howard Avenue. The three buildings would be three-storeys with six units in each, a total of 22 parking spots, three bicycle spaces, and one loading space located within Howard Avenue, Tuson Way and Howard Place. January 2025.Architectural Design Associates Inc.



https://www.am800cklw.com/news/rezoning-...hree-new-dwellings-on-howard-avenue.html
Reply With Quote
     
     
  #2956  
Old Posted Jan 9, 2025, 8:57 PM
Antonio Mast Antonio Mast is online now
Registered User
 
Join Date: Apr 2024
Posts: 582
Quote:
Originally Posted by inter777 View Post
Canadian port of entry experience in depth

Video Link
The Gordie Howe International Bridge project is a once in a generation infrastructure project. When complete later this year, the project deliver much needed border crossing improvement and pose as a landmark for the region. The Windsor/ Detroit trade corridor is the busiest commercial land border crossing on the Canada/ US border, handling almost 30% of all Canada/ US trade transported by truck. This bridge will serve as a symbol of friendship and fair trade between these two great nations.
Reply With Quote
     
     
  #2957  
Old Posted Jan 14, 2025, 9:14 PM
inter777 inter777 is offline
Registered User
 
Join Date: Feb 2021
Location: Windsor, ON
Posts: 276
New industrial flex space and more coming to the Grand Central business park
https://www.buildwithsupreme.com/industrial-flex-space
https://rosatigroup.com/author/vince/

Major Hindu temple coming to west Windsor
Pg 5. https://www.windsorbusiness.net/view-issues/current/

Townhomes proposed for Jefferson blvd at Queen Elizabeth dr.
https://www.citywindsor.ca/documents/res...levard%20-%20Conceptual%20Elevations.pdf
Reply With Quote
     
     
  #2958  
Old Posted Jan 20, 2025, 2:58 PM
Antonio Mast Antonio Mast is online now
Registered User
 
Join Date: Apr 2024
Posts: 582
Work is well under way on the demolition of the Windsor Utilities Commission Water Treatment Plant at 3665 Wyandotte Street East

https://windsorite.ca/2025/01/photos-water-treatment-plant-demolition/[IMG]
Reply With Quote
     
     
  #2959  
Old Posted Jan 21, 2025, 2:56 PM
Antonio Mast Antonio Mast is online now
Registered User
 
Join Date: Apr 2024
Posts: 582
Construction continues on the new TownePlace Suites by Marriott at 1600 Sylvestre Drive in Tecumseh

https://windsorite.ca/2025/01/constructi...wneplace-suites-by-marriott-in-tecumseh/
Reply With Quote
     
     
  #2960  
Old Posted Jan 25, 2025, 6:08 AM
Mick42 Mick42 is offline
Registered User
 
Join Date: Mar 2024
Posts: 34
Quote:
Originally Posted by Antonio Mast View Post
Work is well under way on the demolition of the Windsor Utilities Commission Water Treatment Plant at 3665 Wyandotte Street East

https://windsorite.ca/2025/01/photos-water-treatment-plant-demolition/[IMG]
Sad.. more History meeting the wrecker. I remember taking field trips there in Grade school.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario
Forum Jump



Forum Jump


All times are GMT. The time now is 2:02 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.