Rite of spring: Chief William Commanda Bridge reopening on Friday
The popular multi-use pathway over the Ottawa River had been closed off for winter as of early December.
By Staff Reporter, Ottawa Citizen
Published Apr 10, 2025 | Last updated 6 hours ago
The Chief William Commanda Bridge over the Ottawa River will reopen on Friday, the City of Ottawa has announced.
The popular multi-use pathway between Ottawa and Gatineau had been closed for the winter season as of Dec. 4, with the City of Ottawa saying it was not designed for winter pedestrian or cycling use and the structure of the bridge did not allow for safe plowing, salting or grit operations.
Last year, the bridge opened for seasonal access as of March 25.
A memo from Alain Gonthier and Dan Chenier, respective general managers of public works and recreation, cultural and facility services, said city staff would monitor weather patterns, and in the event of a weather event or drop in temperature causing snow and/or ice accumulation on the bridge deck, may close off access again temporarily using a new permanent gate installed prior to the winter season.
The memo also said snow fencing had been installed on a 50-foot section of the Ottawa side of the bridge prior to the closure in December. Limited snow accumulation was recorded, but staff are to review for snow retention for the 2025/2026 winter season, “and, if there is sufficient snow accumulation, will consider test grooming,” it added.
https://ottawacitizen.com/news/chief-william-commanda-bridge-reopening