I guess this thread can be retitled with the project name?
Quote:
Peterson Ups Burnaby Blake Village Project To 5,250 Units As Site Prep Begins
Translated to the height-based development framework, the previously-approved master plan was for 355 storeys across 22 buildings, amounting to around 4,750 residential units. The updated rezoning application now includes 446 storeys across 21 buildings, totalling to an estimated 5,250 residential units.
“While the revised concept exceeds the height provisions of the Bainbridge Urban Village Community Plan, it remains generally consistent with the plan’s design guidelines, and no amendments are required because the updated OCP now supersedes the Bainbridge Urban Village Community Plan,” said City staff in a recent planning report.
|
Quote:
Commercial uses — retail space, cafés, restaurants, and office space — are planned along Lougheed Highway, Winston Street, and the new internal streets, to serve the neighbourhood and transit users passing through. Childcare facilities are also proposed as part of Phase 1A (Building G), Phase 3A (Building A), and Phase 4 (Building L), with potential additions as each phase progresses.
Site preparation has already begun at 6800 Lougheed Highway, Peterson tells STOREYS, with work on clearing the site recently commencing.
Instead of a traditional demolition, however, the existing industrial building — approximately 215,000 sq. ft — is being deconstructed, with nearly 500,000 pounds of Douglas Fir lumber, timber, and glulam beams set for a new Metro Vancouver District Energy facility that services Burnaby and Vancouver.
|
https://storeys.com/peterson-burnaby-blake-village-project/
Hopefully they manage to keep the unique facades with the final development.
https://petersonbc.com/properties/burnaby-lake-village/
From the Rezoning document
Quote:
The area surrounding the existing warehouse building is being temporarily
improved under approved Temporary Use Permit (TUP) #25-09 to support the
residential sales centre. The TUP authorizes a range of temporary uses on the
southern portion of the site prior to redevelopment, including an active mobility
hub, retail, restaurant, and a community garden. As the CM1 zoning proposed
through the Master Plan rezoning amendment would permit these uses on a
permanent basis, they may continue beyond the three-year TUP term upon
adoption of the amendment. This is supported by staff as the timelines to
redevelop the southern portion of the site will extend beyond three years.
|
Quote:
Following the adoption of the Burnaby Lake Village Conceptual Master Plan, on
July 8, 2024, Council granted Third Reading to Bylaw No. 14616 (REZ #23-06), for
former Phase 1A of the Master Plan. On August 26, 2024, Council granted First
and Second Reading to Bylaw No. 14681 (REZ #23-14) for Phase 1B of the
Master Plan. Another site-specific rezoning application (REZ #24-14) was
submitted on June 18, 2024, to advance Phase 2A of the Master Plan. Each of the
foregoing site specific rezoning applications was subsequently paused due to the
viability challenges of delivering the previously approved density into a challenged
market, whilst also trying to incorporate new regional and municipal development
charges introduced in 2024. Subject to the adoption of the subject Master Plan
rezoning, new site specific development applications in place of these prior
rezonings will be required to follow the new height based framework districts and
the applicable Amenity Cost Charges (ACCs) and Development Cost Charges
(DCCs).
|
Quote:
Phase 1A advanced ahead of adoption of the wider amendment to expedite early
housing delivery while the applicant worked to align the broader Master Plan with
the updated Official Community Plan (OCP). A Phase 1B site specific rezoning
may also proceed in advance before the Master Plan amendment; however, any
further rezonings or subdivisions of future phases will not proceed to approval until
after the Master Plan amendment is adopted.
|