From the MMP staff report this section on a Gainsborough-Windermere connection.
https://pub-london.escribemeetings.com/filestream.ashx?DocumentId=114765
2.3.7 Windermere Road to Gainsborough Road Active Transportation
Connection
Throughout the development of the MMP, there were many who expressed support for
the proposed multi-use pathway connection over Medway valley between Gainsborough
Road and Windermere Road. East-west pedestrian and cycling connectivity between
the Medway and Masonville communities is limited, with active transportation linkages
restricted to high-volume arterial roads. Both of these communities also contain existing
and future residential and employment growth areas.
An active transportation connection between Windermere Road and Gainsborough
Road is a strategic linkage and a beneficial opportunity to provide infrastructure
supportive of the mode shift objectives of the MMP. With an appropriate design, a
pedestrian and cycling bridge could connect communities, support economic
development and tourism, improve accessibility, expand the pathway system and
reduce carbon emissions.
The Medway Valley Heritage Forest Environmentally Significant Area (ESA) is one of
London’s most important natural areas. It is vital that the ecological integrity and
ecosystem health of the ESA be preserved as the first principle for the proposed
Gainsborough-Windermere active transportation connection. This need was strongly
received through the community consultations, with understandable concerns about
previous proposals for a pathway connection that did not fully reflect landscape ecology
best practices. Through further evaluation, a bridge structure will need to avoid
localized ecological impacts as well as avoiding the potential of splitting the ESA into
two features. As such, the bridge structure will need to sit above the ESA, rather than
running through it. Encroachment into the valley will be avoided and supporting piers
will be only considered if technically necessary and based on robust ecological analysis.
The inclusion of this transformative project is only the beginning of the technical review
and community conversations, recognizing that it would be built more than a decade
from now. Future decision points will include inclusion of the linkage in The London
Plan mapping, updates to the Medway Heritage Forest ESA Conservation Master Plan,
and various environmental and engineering technical studies. While project funding is
anticipated to be from both tax and Development Charge sources, it is anticipated that
the scale and cost of the project will rely on external funding, such as community
contributions and senior government active transportation programs.