There is considerable damage to Tropicana Field due to the Hurricane.
This article floats the idea the Rays could make a return to Montreal on an interim basis while Tropicana Field is repaired, assuming that is practical.
Judging from the pics I'm seeing of the damage, that may take a very long time.
How long will the First phase of repairing Olympic stadium's Technical ring take ?
At that point, the stadium could be used as an Outdoor venue which is something I have been pushing for all along.
Such would expedite a return of some baseball games to Montreal and open the possibility of a Taylor Swift concert in the near future.
I maintain that it is not necessary to complete a full roof on the Stadium. At least not in the near term.
Solidifying the current roof should be the main objective.
Olympic Stadium was an Outdoor stadium for many years :
https://www.news-journalonline.com/s...n/75610292007/