  #261  
Old Posted Jun 20, 2023, 5:02 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,367
Ayerswood milestone today with the tower crane being disassembled. A worker onsite said they plan to start the next tower and it will be 45s. Haven't seen any indication of that with zoning applications so might take that with a grain of salt. Hopefully he is right.
Reply With Quote
     
     
  #262  
Old Posted Jun 21, 2023, 10:38 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,367
Looks like they have drywall up to the 10th floor level now as the interior finishing continues. Nearly done the exterior window and cladding now. Still have the 25th floor to do and the sections where the exterior elevator and tower crane connects are located. They have also completed the concrete fence posts for the courtyard entrance off Dundas Street. Will be interesting to see what form the fencing takes. An ornate Wrought Iron would be interesting design choice if they go that way.

Last edited by jammer139; Jun 22, 2023 at 11:34 PM.
Reply With Quote
     
     
  #263  
Old Posted Jul 22, 2023, 3:01 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,367
They have now poured a winding concrete sidewalk thru the Dundas St courtyard entrance. Appears that they are preparing planting beds on either side for landscaping as well. Drywall is now up to the 15 floor. Still working on exterior 25th floor finishing.
Reply With Quote
     
     
  #264  
Old Posted Aug 20, 2023, 5:44 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,367
The landscapers have planted various plants and created different rock garden like plots on either side of the winding sidewalk on the north side entrance off Dundas St. Will look good if given a chance to grow and develop without being destroyed by the homeless drug and mentally ill crowd. Still working on the exterior final clean-ups and progressing with interior finishing and drywall and painting. No indication they intend to start work on the phase 2 plan for the parking lot. I suspect it will be cleaned up and put to use as parking for the 25s tower tenants when they start moving in by the end of this year.
Reply With Quote
     
     
  #265  
Old Posted Sep 11, 2023, 2:37 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,367
Appear to have drywall installed now up to the 20th floor level. Of note they have now installed black steel fencing to enclose the Dundas St entrance and a steel gate door which appears to have a lock mechanism. Looks like they plan to only allow tenants to access the entrance area.
Reply With Quote
     
     
  #266  
Old Posted Dec 7, 2023, 4:33 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,367
They have now removed the exterior construction elevator from the south side. Should see the window-balcony door modules installed over the coming weeks along the strip where the elevator was.
Reply With Quote
     
     
  #267  
Old Posted Jan 3, 2024, 2:39 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,367
Looks like they have now finished installing the balcony doors and windows along the strip on the south side where the construction elevator was located. Still looks like they have some exterior finishing work to complete and I suspect the south side entrance way to cleanup. Will be very curious to see how well units rent in this building in the coming months. Would not be surprised to see alot of vacant units which likely means we will not see phase 2 started for many years.
Reply With Quote
     
     
  #268  
Old Posted Apr 7, 2024, 3:59 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,367
Ayerswood has finally opened up their website for this 25s building which they are calling Clarence Square. First tenants to start moving in April/May.


1,2 and 3 bedroom suites available starting at $2100.


Of note this info on the website:
Park securely in our on-surface lot, (with an underground lot coming in Fall/Winter 2024)


I wonder if they intend to excavate out the remaining parking lot and build the 2 levels of underground parking below the planned future high rise towers? I highly doubt the timeline if true.
Far more likely they did a deal with Galleria Mall/CitiPlaza to offer parking in the north side of the Mall.





https://www.195dundas.com/

Last edited by jammer139; Apr 7, 2024 at 7:08 PM.
Reply With Quote
     
     
  #269  
Old Posted Apr 26, 2024, 3:20 AM
sparky212's Avatar
sparky212 sparky212 is offline
Registered User
 
Join Date: Jul 2008
Location: London Ont.
Posts: 507
I did drive by the other nightand noticed that east lotlot for the most part was now fenced off. It's been a couple months since I've been down that way so not sure how recent of a change it is
Reply With Quote
     
     
  #270  
Old Posted Aug 25, 2024, 5:10 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,367
Interesting development with a large Caisson and Piling drilling rig now on site sinking pilings along the old Hotel side and King St side of property. Could this be the start of Phase 2 for Ayerswood? If so will they stick to the 35s and 32s previous plan or go taller or shorter? Or might they only be excavating for the 2 level underground parking levels as an interim step?
Reply With Quote
     
     
  #271  
Old Posted Aug 25, 2024, 5:29 PM
CanadianTalk's Avatar
CanadianTalk CanadianTalk is online now
Moderator
 
Join Date: Jun 2021
Location: London, Ontario
Posts: 1,299
Quote:
Originally Posted by jammer139 View Post
Interesting development with a large Caisson and Piling drilling rig now on site sinking pilings along the old Hotel side and King St side of property. Could this be the start of Phase 2 for Ayerswood? If so will they stick to the 35s and 32s previous plan or go taller or shorter? Or might they only be excavating for the 2 level underground parking levels as an interim step?
Looks like your 2nd guess is correct.

A building permit was issued last month for the underground garage.

Reply With Quote
     
     
  #272  
Old Posted Aug 25, 2024, 5:35 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,367
Interesting change to 3 level underground parking garage. Will likely still take well over a year to build. Wonder if they are considering changes to the two towers as well.

Quote:
Originally Posted by CanadianTalk View Post
Looks like your 2nd guess is correct.

A building permit was issued last month for the underground garage.

Reply With Quote
     
     
  #273  
Old Posted Aug 25, 2024, 6:31 PM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,318
I wonder if a change they would look at is a single larger footprint building rather than 2 separate buildings.
Reply With Quote
     
     
  #274  
Old Posted Sep 4, 2024, 1:44 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,367
This LFP article is confusing to say the least.

Ayerswood re-evaluating their plans. Maybe selling?

If they plan to build 30s plus towers on top of the parking garage they need to insure the foundation footings on the parking garage are engineered for buildings of that size.



https://lfpress.com/news/local-news/deve...town-three-tower-project-over-brt-tussle
Reply With Quote
     
     
  #275  
Old Posted Sep 4, 2024, 1:57 PM
GreatTallNorth2 GreatTallNorth2 is online now
Registered User
 
Join Date: May 2006
Posts: 1,758
Quote:
Originally Posted by jammer139 View Post
This LFP article is confusing to say the least.

Ayerswood re-evaluating their plans. Maybe selling?

If they plan to build 30s plus towers on top of the parking garage they need to insure the foundation footings on the parking garage are engineered for buildings of that size.



https://lfpress.com/news/local-news/deve...town-three-tower-project-over-brt-tussle
That guy (Tony Graat) has a long history in London. He's not a great developer, loves to complain about the city and rarely builds anything. If he was serious he would negotiate higher density due to the BRT stop. Instead he wants to sue the city for $53 million? My guess is that he just doesn't have the money to build. It's a shame he got that land.
Reply With Quote
     
     
  #276  
Old Posted Sep 4, 2024, 2:05 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,367
The LFP article is confusing because the lawsuit was tossed back in 2018 and is history. The article jumps around in the timeline which makes it harder to understand.
Reply With Quote
     
     
  #277  
Old Posted Sep 8, 2024, 1:42 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,367
Curious to see that the large piling drilling rig has already been removed from the parking lot. They don't appear to have ever worked on the eastern third of the parking lot fronting Clarence St.
Reply With Quote
     
     
  #278  
Old Posted Sep 10, 2024, 3:48 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,367
Looks like they brought back the caisson drilling rig to the site or maybe a different one.
Reply With Quote
     
     
  #279  
Old Posted Sep 11, 2024, 3:05 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,367
It's odd they appear to be drilling caisson pilings down the middle of the parking lot from north to south now basically cutting the parking lot in half. You'd think they would be sinking pilings all around the full perimeter of the current parking lot if they planned to excavate the full footprint for underground parking and the footings for future towers.
Reply With Quote
     
     
  #280  
Old Posted Sep 11, 2024, 3:56 PM
GreatTallNorth2 GreatTallNorth2 is online now
Registered User
 
Join Date: May 2006
Posts: 1,758
It was quoted somewhere in the media that they are considering selling off the remaining land to another developer. That would explain why they would not be using the entire parcel.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump