The recreation and wellness center sits at the base of the hillside (pictured). The arena structure is partially imbedded into the steep hillside and topped with a green roof. The Sports Performance Center will sit above the green roof the arena. All three structures will connect with interior and exterior pedestrian pathways.
[IMG]
http://[url=https://flic.kr/p/2p8rBiD]
[/url]
Pittsburgh Construction Update by
William Pipkins, on Flickr[/IMG]