Old Posted Aug 16, 2024, 7:26 PM
Hackslack Hackslack is offline
Registered User
 
Join Date: Dec 2015
Posts: 2,889
Definitely the Flames took advantage of the stupid scope creep the Mayor insisted on, which was to add solar panels to the project. Because of the scope creep, the original agreed upon contract was voided. That original contract had both parties splitting the construction costs equal, with the Flames taking on 100% of the cost overruns… at the time of the scope creep, construction material and labour cost skyrocketed. The demise of the agreed upon contract saved the flames tens of millions of dollars… all for the Mayor insisting on some solar panels, to help fight the climate emergency!!!

I’d say don’t blame Murray Edward’s and his cronies, blame city hall and the Mayor. I The f’n idiots at city hall and in particular the mayor Mayor insiste on the scope creep.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 8:14 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.